APPENDIX A
'
Texas Utilities Electric Company
Docket: 50-445/85-06
Comanche Peak Steam Electric
Permit: CPPR-126
-Station, Unit 1
' Based on the results of an NRC inspection conducted during the period of
,
f
March 1 - April-30, 1985, and in accordance with the NRC Enforcement Policy
(10 CFR Part 2, Appendix C), 49 FR 8583, dated March 8, 1984, the following
violation was identified:
Failure to Provide an Adequate Procedure
1
10 CFR 50, Appendix B, Criterion V states, in part, that " Activities
,
affecting quality shall be prescribed by documented instructions,
i
. procedures, or drawings, of a type appropriate to the circumstances and
shall be accomplished in accordance with these instructions, procedures,
l
or drawings." "Section 13.1 of the applicant's Operations Administrative
.
Control and Quality Assurance Plan similarly requires activities which
'
affect quality-related components to be carried out in accordance with
written approved procedures.
i
(1) Contrary to the above, the applicant's maintenance administrative
procedure MDA 201, " Electrical and Mechanical Maintenance Procedure
and Instructions" provide inappropriate instruction in that
Section 4.3.7.3 leaves it to the option of the procedure writer to
number the steps and to so state if the exact sequence is essential.
This conflicts with Section 4.5.3 which requires approved change to
the procedure if the exact sequence of steps within a section or
subsection must be changed.
(2) Contrary to the above, Maintenance Action Request MAR 85-0292,
Revision 1 changed the sequence of performing Mechanical Maintenance
Instruction MMI 302, " Reactor Coolant Pump Inspection," without an
approved change to MMI 302 as required by Section 4,.5.3 of MDA 301.
(3) Contrary to the above the applicant failed to provide a procedure
for removal of the broken seal ring from No. 2 Reactor Coolant pump.
(4) Contrary to the above, Deficiency Report 85-012 did not provide
corrective actions as required by Section 4.7 of Station
Administrative Procedure STA-404, " Control of Deficiencies," to
prevent recurrence of unapproved changes to Mechanical Maintenance
Instructions.
I
This is a Severity Level IV Violation.
(SupplementIID)(445/8506-03).
Pursuant to the provisions of 10 CFR 2.201, Texas Utilities Electric Company is
hereby required to submit to this office within 30 days of the date of the
letter transmitting this Notice, a written statement or explanation in reply,
,
b
b $b45
Q
- -
-
.
. _ _
_-
- . .
.
,
t
'
r
5-
-
- . . .
including for each violation:
(1) the reason for the violations if admitted,
the corrective steps which have been taken'and the results achieved,
the corrective' steps which will be taken to avoid further violations, and
'
-
<-
. ' ,
the date when full compliance will be achieved. Where good cause is shown.
-
.
consideration will be given to extending the response time.
.
,
Q
~
'
.
~
~
'e ,
,
..
. ..
, .
a
Dated ~ at Arlington, Texas,
" i,
f this 12th day of September, 1985.
f
+
' ;
- c
.
,
'
_'
- s
1
,.
,
?
f
,
$
I
7 , s(
4:
j
,
- , .
? '
i
,
'
y
t
I
P
y
$
. .
>
t
i. *
1,
'
>
3
.
,
,
e
v,
in
'
.
h
6
- .
. . .
.
.
...
...
m.
. .
.
. .
. . .
.
. .
..
...
..m .
.- . . .
.
.
. .
. .
.
. .
. - .
.
-
.
.