ML20133J698

From kanterella
Revision as of 23:32, 3 July 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Security Insp Rept 50-454/85-40 on 850916-19.No Noncompliance Noted
ML20133J698
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/16/1985
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20133J701 List:
References
NUDOCS 8510210043
Download: ML20133J698 (2)


See also: IR 05000454/1985040

Text

O *

b

v-=rmes- -+-v^r

p A y=r= A tt ir3's n

m o L.uunn JQ liilWWin t IVit

'

OCT 161985

Docket No. 50-454

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

~ Vice President

Post Office Box,767

Chicago, IL 30690

Gentlemen:

This refers to the routine security inspection conducted by Messrs.

J. L. Belanger and J. R. Kniceley of this office on September 16-19, 1985,

of activities at Byron Nuclear Power Station, Unit 1 authorized by NRC

Operating License No. NPF-37 and to the discussion of our findings with

Mr. Pleniewicz and other members of your staff at the conclusion of the

inspection.

The enclosed. copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of

Practice," Part 73, Title 10, Code of Federal Regulations. This information

must be handled and protected in accordance with the provisions of 10 CFR 73.21.

Consequently, our report of this inspection will not be placed in the Public

Dacument Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

%o2kDO P

. L. Ax lson, Chief

G

uclear Materials Safety gok'f

gI

4'

and Safeguards Branch 4

Enclosure: Inspection Report 1ii

No. 50-454/85040(DRSS) I

(UNCLASSIFIED SAFEGUARDS INFORMATION)

1.Aciosure containS

See Attached List For Distribution SAFEGUARDS INFORMTION

Upon separation this

page is Decontro11trj

O A T TO A f) w \

'

A ru r a -' ny

li

w. u.,.,,v i vnmn l

,U

-

O 6 r' ni 1 e n n o i n. n m a n --' qi '

v, s . _u usie w v ta a v i u v i s 'i l

, v

Commonwealth Edison Company 2

OCT 1 G 1985

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o UNCLASSIFIED

SAFEGUARDS INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

W. Paton, ELD

L. Olshan, NRR LPM

H. 5. Taylor, Quality Assurance

Division

.

,

trclosure contains

SAFEGUARDS INF0PNiTION

Upon separation this

page is Decontrolled

RIII RII II RIII II

CV l{h&gt

Belanter/ld Kniceley eed Forney 1 son

09/30/85 g.n, n

e ri-( II A DBQ [dCODU'1{]{