Forwards Special Safety Insp Rept 50-454/85-33 on 850709-26 & Notice of Violation.Written Response to Address Weaknesses in Troubleshooting Activities Requested within 15 Days. W/O Notice of Violation
ML20134D448
Person / Time
Site: Byron Constellation icon.png
Issue date: 08/13/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20134D452 List:
References
NUDOCS 8508190224
Download: ML20134D448 (2)


See also: IR 05000454/1985033

Text

r  ?

.> , l'

<

AUG 131985

,

,

-

Docket No. 50-454

Connonwealth Edison Company

ATTN: Mr. Cordell Reed'

Vice President'

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. C. A. VanDenburgh

of this office on July 9, 1985 through July 26, 1985, of activities at Byron

Station, Unit 1, authorized by NRC Operating License NPF-37 and to the

discussion of our findings with Mr. R. Querio and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

  • l the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

'

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

with, NRC requirements, as specified in the enclosed Appendix. A written

response is required. Furthermore, the enclosed report (Section 2.d.)

indicates weaknesses in your maintenance and troubleshooting activities,

including documentation which contributed to the dissemination of erroneous

information and prevented the timely resolution of operational occurrences.

Prompt management attention is required to resolve these concerns. You are

requested to also provide a written response to this office within fifteen

days addressing these weaknesses.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room.

,

.;;

t

$kS54PDR 1

1

4M/

, ._-

'

t

..

Commonwealth Edison Company 2_ AUG 131985

We will gladly discuss,

any questionsyou have concerning this inspection.

Sincerely,

Original Signed by Jf J. !!arrison

,

C. J. Paperiello, Director

Division of Reactor Safety

Enclosure: Inspection Report

No. 50-454/85033(DRS)

cc w/ enclosure:

D. L. Farrar,-Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner.Sorensen, Site Project

Superintendent

R. E. Querio, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

Diane Chavez, DAARE/ SAFE

W. Paton, ELD

L. 01shan, NRR LPM

RIII RIII RII R RIII

ca

VanDenburgh/jp

rn

Forne

ac}Ik

Ring

%

rrison

M&

Phpbriello

08/10/85 V/3-if q hl3 9{l3 l

P l

L_.