Confirms NRC Plan to Perform Independent Verification Insp of Const on 851028-1108.Const Activities & Matls Will Be Sampled Through Ndes.Addl Info on Documentation Selected for Insp Encl
ML20138F971
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/18/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
NUDOCS 8510250382
Download: ML20138F971 (6)


Text

' b 9p OCT 181985 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Subject:

NRC Independent Measurements This letter is to confirm the NRC's plan to perform an independent verifica-tion inspection at the Byron facility, Unit 2, using the NRC NDE van and contractor technicians under NRC direction. This plan was discussed by Julian Hinds, of the NRC Region III staff, with R. Tuetken and others of your staff.

We consider this inspection to be an independent verification of construction at the Byron facility, Unit 2. Construction activities and materials will be sampled through nondestructive examinations as a supplement to our existing inspection efforts. - Similar future nondestructive examinations by NRC are planned on a routine basis at other licensee construction sites.

This inspection at the Byron facility, Unit 2, is expected to begin on October 28, 1985, and will be completed on November 8,1985. We have requested i docur:entation packages to be prepared by your staff for each of the welds selected. Additional information on the documentation selected for inspection is provided in Attachment A. We understand by letter dated October 10, 1985, from J. T. Porter, CECO Project Construction Department, Byron Station, to Harry Kerch, USNRC, that this information has been forwarded. NRC will review your documentation packages and update NRC procedures to be consistent with your procedures. All documentation supplied by your staff will be returned upon request at the completion of the inspection. Further information regarding Van logistical needs and the scope of the inspection is provided in Attachments B and C.

Members of your staff will be kept informed of our inspection progress and significant findings. An exit meeting with you or members of your staff will be conducted on November 8,1985, in accordance with our normal procedures.

8510250302 851018 gDR ADOCK 05000455 0\

PDR 6 kh\_

Commonwealth Edison Company ~00T 181985 The evaluation of examination results and preparation of an inspection report will be completed and the results of the inspection will be transmitted to you through the standard NRC inspect %n report.

If you should have any further questions regarding this planned-inspection, please contact the assigned Senior Resident Inspector, or W. L. Forney of the NRC Region III Office.

Your cooperation in this matter is appreciated.

Sincerely, e d Ey c,E. Morcitus" 8' Original !Tg.

Charles E. Nore11us, Director Division of Reactor Projects Attachments: As stated cc w/ Attachments:

D. L. Farrar, Director of Nuclear Licensing V. I. Schlosser, Project Manager Gunner Sorensen, Site Project Superintendent R. E. Querio, Plant Manager DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII Braidwood Phyllis Dunton, Attorney General's Office, Environmental Control Division D. W. Cassel, Jr. , Esq.

Diane Chavez, DAARE/ SAFE W. Paton, ELD L. 01shan, NRR LPH H. S. Taylor, Quality Assurance Division V/6

'RIII RIII; RIII RIII

/rl n k s 10//7/85 10/j$'/85 10//8/85 10/(8 /85

.. l 1 DATA PACKAGES - ATTACHMENT A i

1 After the welds have been selected for NDE inspection, we request that you prepare a package containing the following on each weld:

1 Inspection Report Weld History (QC History)

Material Certifications for base materials Weld Wire Certifications Piping drawings,. isometric of welds locations

. NDE Reports on all NDE performed NDE Procedures for RT, PT, MT and VT Weld Procedures Bolt Torquing Procedures (Structural and Pipe Hangers)

Piping and Installation Procedure (only section that specifies code and addenda) i

. The assembled packages should be forwarded to:

US Nuclear Regulatory Commission Region-I 631 Park Avenue

King of Prussia, Pennsylvania 19406 ATTN
Mr. Harry Kerch i

l i

t i'

i- ,

l

't

^'

, v, n,n, -

w--- , , , ---,---

. . ._ - . . . . . - - . . - .. ~-- - --

i 1

SUPPLEMENTAL NDE VAN INFORMATION I

ATTACHMENT B

\

l 1. NDE Van Support Requirements i

l We request that the NRC-NDE Van be positioned as near as practicable to -

the containment area entrance to facilitate the performance of inspec-

tions.

1 I a. Thi van requires the following connections while sited at your facility:

Site water with a garden hose connection - this water is for film rinse, i'

Requirement for film rinse water drain (continual). No chemical disposal will occur from the van without prior concurrence from appropriate licensee personnel. At the end of the independent inspection, the NRC needs to dispose of the film developing chemicals prior to moving the van from the s$te.

Two 30 amp, 110 volt circuits are required for operation of the 4 van,

b. The van will contain PT and MT approve materials. The team will need two rolls of your chemically approved tape and two approved markers for identifying welds and marking weld areas.

1 c. It will be necessary for you to remove the paint, rust or other mate-

rial that could interfere with PT or MT on the selected welds. Also, we will need scaffolding erected and insulation removed for access.

l -

2. Administrative Information i a. The radiation source will be a nominal 100 curie IR-192 source. This j source is licensed by NRC, but owned by the NRC contractor.
b. The names of the NRC and contractor NDE personnel will be supplied to you by Region III. Clearance for these personnel is necessary. ,

i i

a 1-f I

i l .

Attachment B (Continued)

c. We request that you hold a mini-radiation safety training course for the NRC NDE personnel. This course should familiarize the personnel with your facility and procedures and should not exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in length,
d. A camera site pass will be needed for a Canon AE-1, 35 mm, camera, Serial No. 1969401.
e. The NDE personnel will be using 5 watt Motorola radios on the site; the frequency used by the NRC is 165.6625 MHz.

/

i

? .- ,

SCOPE OF INSPECTION ATTACHMENT C The NDE van team will perform the following examinations and inspections as appropriate:

Radiography:

Pipe butt and socket welds and other appropriate pressure boundary components.

Ultrasonics:

Flaw detection and material thickness measurements, as appropriate, of piping, welds, structural components, vessels, heat exchangers, bolts and other equip-ment.

Liquid Penetrant:

Piping system components and structural elements.

Magnetic Particle Piping system components and structural elements.

Hardness Testing:

All of the previously listed components.

Windsor Probe:

Safety related concrete.

Delta Ferrite Indications (Severn Gage):

Stainless steel welds.

/;'oy Analysis:

Selected metallic components will have confirmatory chemical analysis performed.

Visual Examinations:

Weld quality and configuration verification of piping and structural systems.

Quality Records Review:

Welding documentation, materials and personnel certification, NDE records to include radiographs.