Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support IR 05000369/19970031997-04-0101 April 1997 Insp Rept 50-369/97-03 on 970125-0308.No Violations Noted. Major Areas Inspected:Sg Replacement Project Preoutage Activities in Areas of Maint,Engineering & Plant Support ML20137V1531997-03-24024 March 1997 Insp Repts 50-369/97-01 & 50-370/97-01 on 970112-0222. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970021997-03-0505 March 1997 Insp Repts 50-369/97-02 & 50-370/97-02 on 970203-06.No Violations Noted.Major Area Inspected:Licensee Plant Support ML20134L1461997-02-10010 February 1997 Insp Repts 50-369/96-11 & 50-370/96-11 on 961201-970111. No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19960101996-12-30030 December 1996 Insp Repts 50-369/96-10 & 50-370/96-10 on 961020-1130.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19960091996-11-27027 November 1996 Insp Repts 50-369/96-09 & 50-370/96-09 on 961104-08.No Violations Noted.Major Areas Inspected:Safeguards Insp Included Aspects of Licensee Plant Support IR 05000369/19960081996-11-15015 November 1996 Insp Repts 50-369/96-08 & 50-370/96-08 on 960908-1019. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20128H6951996-10-0202 October 1996 Insp Repts 50-369/96-07 & 50-370/96-07 on 960728-0907. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering Maint & Plant Support IR 05000369/19940291994-12-28028 December 1994 Insp Repts 50-369/94-29 & 50-370/94-29 on 941205-09.No Violations Noted.Major Areas Inspected:Util Physical Security Program for Np Reactors Including Protection of Safeguards Info,Access Controls & Alarm Stations IR 05000369/19930291994-01-11011 January 1994 Insp Repts 50-369/93-29 & 50-370/93-29 on 931121-1218.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations & Cold Weather Preparation IR 05000369/19930301994-01-0707 January 1994 Insp Repts 50-369/93-30 & 50-370/93-30 on 931213-17.No Violations Noted.Major Areas Inspected:Design Changes & Plant Mods,Engineering & Technical Support Activities & follow-up on Previously Identified Insp Findings IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000369/19930281993-12-29029 December 1993 Partially Withheld Insp Repts 50-369/93-28 & 50-370/93-28 on 931129-1202 (Ref 10CFR73.21).Violation Not Subj to Enforcement Action.Major Areas Inspected:Physical Security Program IR 05000369/19930241993-12-16016 December 1993 Insp Repts 50-369/93-24 & 50-370/93-24 on 931017-1120. Violations Noted.Major Areas Inspected:Plant Operations, Engineered Safety Features Sys Walkdown,Surveillance Testing & Maintenance IR 05000369/19930261993-12-15015 December 1993 Insp Repts 50-369/93-26 & 50-370/93-26 on 931115-19.No Violations Noted.Major Areas Inspected:Engineering & Technical Support of Plant Modifications,Design Changes & Plant Operations IR 05000369/19930251993-12-0202 December 1993 Partially Withheld Insp Repts 50-369/93-25 & 50-370/93-25 on 931101-04 (Ref 10CFR73.21).Noncited Violations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000369/19930211993-11-10010 November 1993 Insp Repts 50-369/93-21 & 50-370/93-21 on 931018-21.No Violations Noted.Major Areas Inspected:Simulator Control Room,Tsc,Osc & EOF IR 05000369/19930221993-11-0909 November 1993 Insp Repts 50-369/93-22 & 50-370/93-22 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maintenance Observations,Ler & Followup on Previous Insp Findings IR 05000369/19930181993-10-19019 October 1993 Insp Repts 50-369/93-18 & 50-370/93-18 on 930822-0925. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance Testing,Maint Observations,Plant Mods & Emergency Preparedness Training Exercise 1999-08-26
[Table view] Category:UTILITY
MONTHYEARIR 05000369/19900201990-11-0707 November 1990 Insp Repts 50-369/90-20 & 50-370/90-20 on 901001-05 & 1101. No Violations or Deviations Noted.Major Areas Inspected: Design Changes & Mod & Engineering Support Activities IR 05000369/19900191990-10-0404 October 1990 Insp Repts 50-369/90-19 & 50-370/90-19 on 900924-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of NDE Procedures, Observations of in-progress NDE Exams & Insp Plan IR 05000369/19900171990-09-11011 September 1990 Insp Repts 50-369/90-17 & 50-370/90-17 on 900726-0828. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities & Facility Mods IR 05000369/19900151990-09-10010 September 1990 Insp Repts 50-369/90-15 & 50-370/90-15 on 900813-17. Violations Noted But Not Cited.Major Areas Inspected:Annual Emergency Exercise ML20056A5861990-07-24024 July 1990 Insp Repts 50-369/90-11 & 50-370/90-11 on 900522-0625. Violations Noted.Major Areas Inspected:Plant Operations Safety Verification,Surveillance Testing,Maint Activities, Facility Mods & Follow Up of Events Repts ML20055H4841990-07-13013 July 1990 Insp Repts 50-369/90-14 & 50-370/90-14 on 900626-0705. Violations Noted.Major Areas inspected:licensee-identified Issues Re Unit 1 Diesel Generator Inoperability for Approx 26 H on 900625-26 IR 05000369/19890301989-09-20020 September 1989 Insp Repts 50-369/89-30 & 50-370/89-30 on 890821-24.Noncited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors.Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000369/19890151989-09-0707 September 1989 Insp Repts 50-369/89-15 & 50-370/89-15 on 890605-09,19-23 & 0728.No Violations or Deviations Noted.Major Areas Inspected:Maint Program & Program Implementation IR 05000369/19890291989-08-31031 August 1989 Insp Repts 50-369/89-29 & 50-370/89-29 on 890821-25.No Violations or Deviations Noted.Major Areas Inspected: Portions of Inservice Insp Program,Unit 2 Insp Plan for Outage,Review of NDE Procedures & Exam Verifications IR 05000369/19890261989-08-30030 August 1989 Insp Repts 50-369/89-26 & 50-370/89-26 on 890807-11.No Violations or Deviations Noted.Major Areas Inspected:Plant Chemistry,Previously Identified Items & Status of Steam Generator Blowdown Recycle Sys IR 05000369/19890221989-08-17017 August 1989 Insp Repts 50-369/89-22 & 50-370/89-22 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Eddy Current Exam of Unit 2 Steam Generator Tubing & Previous Open Item IR 05000369/19890211989-08-16016 August 1989 Insp Repts 50-369/89-21 & 50-370/89-21 on 890707-18. Violations Noted.Major Areas Inspected:Operation of Unit 1 Following Improperly Performed Heat Balance & Concomitant Nonconservative Calibr of Power Range Nuclear Instruments IR 05000369/19890201989-08-16016 August 1989 Insp Repts 50-369/89-20 & 50-370/89-20 on 890717-21.No Violations Noted.Major Areas Inspected:Containment Local Leak Rate Testing & Verification of Containment Integrity IR 05000369/19890181989-08-0909 August 1989 Insp Repts 50-369/89-18 & 50-370/89-18 on 890629-0728.No Violations or Deviations Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities,Followup of LER & Followup on Previous Findings IR 05000369/19890161989-08-0808 August 1989 Insp Repts 50-369/89-16 & 50-370/89-16 on 890622-28.One Violation & One Deviation Noted.Major Areas Inspected: Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on LER & Previous Insp Findings IR 05000369/19890231989-08-0303 August 1989 Partially Withheld Insp Repts 50-369/89-23 & 50-370/89-23 on 890727 (Ref 10CFR2.790 & 73.21).Violations Noted.Major Areas Inspected:Security Event Logs IR 05000369/19890191989-07-19019 July 1989 Insp Repts 50-369/89-19 & 50-370/89-19 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp Program & Unit 2 Insp Plan for Outage,Nde procedures,in-progress NDE Exams & NDE Equipment Calibr ML20236E6471989-07-13013 July 1989 Insp Repts 50-369/89-14 & 50-370/89-14 on 890422-0601. Violation Noted.Major Areas Inspected:Operation Safety Verification,Surveillance Testing,Maint activities,10CFR21 Reviews,Followup on Previous Insp Findings & LERs IR 05000369/19890171989-07-10010 July 1989 Insp Repts 50-369/89-17 & 50-370/89-17 on 890605-09.No Violations or Deviations Noted.Major Areas Inspected: Responses to Previous Insp Findings,Including Followup on NRC Bulletins 88-001 & 88-003 & on 10CFR21 Rept on Breakers ML20244E5881989-06-0505 June 1989 Insp Repts 50-369/89-11 & 50-370/89-11 on 890330-0421. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890131989-06-0101 June 1989 Partially Withheld Insp Repts 50-369/89-13 & 50-370/89-13 on 890501-05 (Ref 10CFR2.790 & 73.21).Two Noncited Violations Noted Re Failure to Conduct Psychological Exam.Major Areas Inspected:Mgt Support,Record & Repts & Lighting ML20247M5801989-05-15015 May 1989 Insp Repts 50-369/89-10 & 50-370/89-10 on 890404-07.No Violations or Deviations Noted.Major Areas Inspected: Emergency Preparedness Requirements & Practices Implemented During Licensee Response to Steam Generator B Tube Rupture IR 05000369/19890021989-04-25025 April 1989 Operational Safety Team Insp Repts 50-369/89-02 & 50-370/89-02 on 890213-17 & 0227-0322.Violations Noted.Major Areas Inspected:Operations,Maint Support of Operations,Mgt Controls & Emergency Operating Procedures ML20245G9781989-04-20020 April 1989 Insp Repts 50-369/89-05 & 50-370/89-05 on 890228-0329. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19890071989-04-17017 April 1989 Insp Repts 50-369/89-07 & 50-370/89-07 on 890320-24.No Violations or Deviations Noted.Major Areas Inspected: Inservice Insp,Including Review of Procedures,Observation of Work Activities & Evaluation of Eddy Current Testing IR 05000369/19890061989-04-10010 April 1989 Insp Repts 50-369/89-06 & 50-370/89-06 on 890308-11.Major Areas Inspected:Events Re 890307 Steam Generator B Tube Failure.Procedures Found to Have Weaknesses Which Could Result in Release of Radioactivity to Environ IR 05000369/19890081989-04-0606 April 1989 Insp Repts 50-369/89-08 & 50-370/89-08 on 890327-31.No Violations Noted.Major Areas Inspected:Steam Generator Tubing Eddy Current Exam & Activities Associated W/Unit 1 Steam Generator B Ruptured Tube IR 05000369/19890091989-03-30030 March 1989 Partially Withheld Insp Repts 50-369/89-09 & 50-370/89-09 on 890220-24 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans,Security Program Audit,Records & Repts & Compensatory Measures IR 05000369/19890031989-03-30030 March 1989 Insp Repts 50-369/89-03 & 50-370/89-03 on 890306-10.No Violations or Deviations Noted.Major Areas Inspected: Triennial post-fire Safe Shutdown Capability Reverification & Assessment (Module 64150) ML20244A8831989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures IR 05000369/19890011989-03-29029 March 1989 Insp Repts 50-369/89-01 & 50-370/89-01 on 890120-0227. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Review of Plant Procedures ML20235P5621989-02-0707 February 1989 Insp Repts 50-369/88-33 & 50-370/88-33 on 881122-890119. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint activities,10CFR21 Insp,Startup from Refueling & Followup on Previous Insp IR 05000369/19880301988-11-0404 November 1988 Insp Repts 50-369/88-30 & 50-370/88-30 on 880924-1020. Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880271988-10-28028 October 1988 Insp Repts 50-369/88-27 & 50-370/88-27 on 880913-16.No Violations or Deviations Noted.Weakness Noted.Major Areas Inspected:Annual Radiological Emergency Response Exercise IR 05000369/19880281988-10-14014 October 1988 Partially Withheld Insp Repts 50-369/88-28 & 50-370/88-28 on 880912-16 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Maint Barriers,Assessment Aids,Access Controls,Alarm Stations & Training & Contingencies IR 05000369/19880261988-10-12012 October 1988 Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923. Violation Noted:Inadequate Fire Barrier Penetrations.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Findings IR 05000369/19880241988-10-0606 October 1988 Insp Repts 50-369/88-24 & 50-370/88-24 on 880801-0916. Violations & Unresolved Item Noted.Major Areas Inspected: Past & Current Operability of Hydrogen Skimmer Sys IR 05000369/19880291988-09-23023 September 1988 Insp Repts 50-369/88-29 & 50-370/88-29 on 880829-0909. Violations Noted.Major Areas Inspected:Inoperability of Safety Sys Due to Inadequate post-mod Testing ML20205S0711988-09-13013 September 1988 Insp Repts 50-369/88-25 & 50-370/88-25 on 880816-18.No Violations or Deviations Identified.Major Areas Inspected: Resolution of Findings from NRC Diagnostic Evaluation Team Rept & Status of Licensee Written Response to Rept ML20154F9911988-09-0606 September 1988 Insp Repts 50-369/88-23 & 50-370/88-23 on 880723-0819.One Violation Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings ML20151Z8821988-08-19019 August 1988 Insp Repts 50-369/88-20 & 50-370/88-20 on 880625-0722. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings IR 05000369/19880221988-08-11011 August 1988 Partially Withheld Insp Repts 50-369/88-22 & 50-370/88-22 on 880718-22 (Ref 10CFR2.790 & 73.21).No Violations Noted. Major Areas Inspected:Procedures & Operations of SNM IR 05000369/19880161988-07-26026 July 1988 Insp Repts 50-369/88-16 & 50-370/88-16 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected: Occupational Exposure During Extended Outages IR 05000369/19880191988-07-21021 July 1988 Insp Repts 50-369/88-19 & 50-370/88-19 on 880627-0701.No Violations or Deviations Noted.Major Areas Inspected:Nde Activities Re Resistance Temp Detector Sys Mods & Inservice Insp & Preservice Insp Being Accomplished During Outage IR 05000369/19880171988-07-15015 July 1988 Insp Repts 50-369/88-17 & 50-370/88-17 on 880620-24.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Effluents IR 05000369/19880181988-07-12012 July 1988 Partially Withheld Insp Repts 50-369/88-18 & 50-370/88-18 on 880620-24 (Ref 10CFR2.790 & 73.21).One Licensee Identified Violation Noted.Major Areas Inspected:Mgt Effectiveness - Security Program & Records & Repts ML20151E6081988-07-0808 July 1988 Insp Repts 50-369/88-14 & 50-370/88-14 on 880521-0624. Violations Noted:Continued Weakness in Procedural Compliance.Major Areas Inspected:Safety Verification, Surveillance Testing & Refueling Outage Activities IR 05000369/19880151988-06-30030 June 1988 Insp Repts 50-369/88-15 & 50-370/88-15 on 880613-17.No Violations or Deviations Noted.Major Areas Inspected:Nde Procedures Review,Observation & Review of in-process NDE Exam & Review of Inservice Insp Exam Data ML20195C8611988-06-0707 June 1988 Insp Repts 50-369/88-13 & 50-370/88-13 on 880502-06.One Violation & Two Unresolved Items Noted.Major Areas Inspected:Nrc Diagnostic Evaluation Team Rept Findings & Action on Previous Insp Findings ML20155J3411988-05-31031 May 1988 Insp Repts 50-369/88-12 & 50-370/88-12 on 880423-0520. Violations Noted.Major Areas Inspected:Operations Safety Verification,Surveillance Testing,Maint Activities & Followup on Previous Insp Findings 1990-09-11
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000369/19990061999-10-0404 October 1999 Insp Repts 50-369/99-06 & 50-370/99-06 on 990801-0911. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19990051999-08-26026 August 1999 Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Noted Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000369/19990041999-07-13013 July 1999 Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncvs.Major Areas Inspected:Aspects of Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19990101999-06-16016 June 1999 Insp Repts 50-369/99-10 & 50-370/99-10 on 990322-26.No Violations Noted.Major Areas Inspected:Aspect of Licensee Health Physics Activities During Unit 2 Refueling Outage IR 05000369/19990031999-06-0202 June 1999 Insp Repts 50-369/99-03 & 50-370/99-03 on 990328-0508. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19990021999-04-23023 April 1999 Insp Repts 50-369/99-02 & 50-370/99-02 on 990214-0327.No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000369/19993011999-03-18018 March 1999 NRC Operator Licensing Exam Repts 50-369/99-301 & 50-370/99-301 (Including Completed & Graded Tests) for Tests Administered on 990125-0205.Five SRO & Six RO Candidates Received Written Exams & Operating Tests IR 05000369/19990011999-03-10010 March 1999 Insp Repts 50-369/99-01 & 50-370/99-01 on 990103-0213.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980101998-12-18018 December 1998 Insp Repts 50-369/98-10 & 50-370/98-10 on 981004-1121.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19980091998-10-30030 October 1998 Insp Repts 50-369/98-09 & 50-370/98-09 on 980823-1003.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980081998-09-21021 September 1998 Insp Repts 50-369/98-08 & 50-370/98-08 on 980712-0822.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20154C4131998-09-21021 September 1998 Notice of Violation from Insp on 980712-0822.Violation Noted:On or Before 971217,operations Personnel Failed to Designate Appropriate Vent Valves for Venting to Properly Return Sys to Svc as Required by Omp 7-1 IR 05000369/19980111998-08-27027 August 1998 Insp Repts 50-369/98-11 & 50-370/98-11 on 980601-26 & 0805-07.No Violations Noted.Major Areas Inspected:Maint & Engineering Programs.Rept Reviewed Maintenance,Surveillance & Matl Condition of Mcquire,Unit 1 Ice Condenser System IR 05000369/19980071998-08-0707 August 1998 Insp Rept 50-369/98-07 & 50-370/98-07 on 980531-0711. Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support ML20237B1561998-08-0707 August 1998 Notice of Violation from Insp on 980531-0711.Violation Noted:Licensee Failed to Establish Procedural Guidance for Abnormal Vent Path Used for Degassing Unit 1 Volume Control Tank to Environ IR 05000369/19980061998-06-25025 June 1998 Insp Repts 50-369/98-06 & 50-370/98-06 on 980419-0530.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000369/19980041998-06-0404 June 1998 Insp Repts 50-369/98-04 & 50-370/98-04 on 980413-24. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-030, on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event1998-06-0404 June 1998 PNO-II-98-030:on 980603,loss of Offsite Power Occurred,Due to Loss of 1B Bus.Caused by Faulted 230 Kv Switchyard Current Transformer.Resident Inspectors Onsite & Responded to Event & Will Continue to Evaluate Activities W/Event ML20249A2451998-06-0404 June 1998 Notice of Violation from Insp on 980413-24.Violation Noted: Procedure Investigation Processes 2-M96-1440 & 0-M97-1933 Were Not Initiated within 24 H After Realization That Procedure Investigation Process Should Have Been Written IR 05000369/19980031998-05-18018 May 1998 Insp Repts 50-369/98-03 & 50-370/98-03 on 980308-0418.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20216H6051998-04-0606 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:Licensee Failed to Adequately Establish or Adhere to Procedural Guidance for Repair of Two safety-related Containment Isolation Valves as Evidenced ML20216H6171998-04-0606 April 1998 Insp Repts 50-369/98-02 & 50-370/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000369/19970201998-02-23023 February 1998 Insp Repts 50-369/97-20 & 50-370/97-20 on 971214-980124. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support,Including Review of Radiological Protection Practices & Plant Physical Security ML20203F5921998-02-23023 February 1998 Notice of Violation from Insp on 980105-08.Violations Noted: Licensee Failed to Follow Procedures for Security Badge & Access Control IR 05000369/19980011998-02-17017 February 1998 Partially Withheld Insp Repts 50-369/98-01 & 50-370/98-01 on 980114-15 (Ref 10CFR2.790).No Violations Noted.Major Areas Inspected:Plant Support,Including Malevolent Use of Vehicles at Plant & Vehicle Barrier Sys IR 07100102/20120131998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Inadequate Measures Were Provided for Verification or Checking Adequacy of Design Documents ML20198P3771998-01-12012 January 1998 Insp Repts 50-369/97-18 & 50-370/97-18 on 971102-1213. Violations Noted.Major Areas Inspected:Integrated Insp Included Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20199B1571998-01-0505 January 1998 Notice of Violation from Insp on 971205-06.Violation Noted: an Event Occurred on 971202 in Which Person or Persons Made Credible Threat to Commit or Cause Significant Physical Damage to Power Reactor & Not Reported within One Hour ML20199B1641998-01-0505 January 1998 Insp Repts 50-369/97-19 & 50-370/97-19 on 971205-06. Violations Noted.Major Areas Inspected:Licensee Response to 971202 Event Involving Seal Damage Event at Four Air Lock Doors of Unit 2 Containment Bldg ML20203M4471998-01-0505 January 1998 Errata to Notice of Violation for Insp Repts 50-369/97-19 & 50-370/97-19.Statement in Nov,Page 2, Under Authority of Section 182 of Act.42USC 2232,this Response Shall Be Submitted Under Oath or Affirmation, Was Incorrect IR 05000369/19970171997-12-0101 December 1997 Insp Repts 50-369/97-17 & 50-370/97-17 on 970921-1101.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000369/19970151997-10-20020 October 1997 Insp Repts 50-369/97-15 & 50-370/97-15 on 970810-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198N4701997-10-20020 October 1997 Notice of Violation from Insp on 970810-0920.Violation Noted:On 960420,ET Guidelines,Apps C & E Were Not Implemented as Evidenced By;Resolution Analyst Revised & Overruled Reexam Request for SG 2A Tube R7C60 ML20212A0361997-10-0808 October 1997 Notice of Violation from Insp on 970712-0827.Violation Noted:As of 970717,10 of 48 Ice Condenser Inlet Doors on Unit 2 Required Initial Opening Torque in Ixcess of 675 inch-pound Operability Limit ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility IR 05000369/19970121997-09-22022 September 1997 Insp Repts 50-369/97-12 & 50-370/97-12 on 970804-08.No Violations Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20211E7981997-09-16016 September 1997 Insp Repts 50-369/97-16 & 50-370/97-16 on 970712-0827. Violations Being Considered for Escalated Eas.Major Areas Inspected:Review of Aspects of Problem Involving Inoperable Unit 2 Ice Condenser Lower Inlet Doors IR 05000369/19970101997-09-0808 September 1997 Insp Repts 50-369/97-10 & 50-370/97-10 on 970629-0809.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000369/19973001997-08-29029 August 1997 NRC Operator Licensing Exam Repts 50-369/97-300 & 50-370/97-300 (Including Completed & Graded Tests) for Test Administered on 970728-31.Exam Results:Five SRO & One RO Passed Exam & One SRO Failed Exam IR 05000369/19970131997-08-22022 August 1997 Insp Repts 50-369/97-13 & 50-370/97-13 on 970721-24.No Violations Noted.Major Areas Inspected:Licensees Program for Compensatory Measures for Degraded Security Equipment ML20217R1161997-08-18018 August 1997 EN-97-076:on 970818,order Prohibiting Involvement in NRC- Licensed Activities for a Period of One Year Will Be Issued. Action Based on Investigation Conducted by Oi,Which Determined Falsification of QA Document PNO-II-97-051, on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened1997-08-0909 August 1997 PNO-II-97-051:on 970906,McGuire Units 1 & 2 Automatically Tripped.Porvs Utilized Until Steam Dumps Could Be Made Available.Steam Relieved Through Main Steam PORVs Until Power to Bus Kxa Restored & MSIVs Reopened ML20149L5751997-07-28028 July 1997 Insp Repts 50-369/97-09 & 50-370/97-09 on 970518-0628. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20149L5701997-07-28028 July 1997 Notice of Violation from Insp on 970518-0628.Violation Noted:Procedure IP/0/A/3250/12B Inadequate to Provide Sufficient Guidance to Properly Test Emergency Diesel Generator Sequencer Logic Circuitry ML20149G6881997-06-16016 June 1997 Insp Repts 50-369/97-08 & 50-370/97-08 on 970406-0517. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20149G6771997-06-16016 June 1997 Notice of Violation from Insp on 970406-0517.Violation Noted:Procedure PT/1/A/4600/014D Was Inadequate in Providing Sufficient Guidance to Bypass Properly RPS Functions of an Inoperable N-41 Channel to Permit Testing of Channel N-42 IR 05000369/19970071997-06-0202 June 1997 Insp Rept 50-369/97-07 on 970406-0503.Violations Noted.Major Areas Inspected:Sg Replacement Project Activities in Areas of Maint & Engineering IR 05000369/19970041997-05-0505 May 1997 Insp Repts 50-369/97-04 & 50-370/97-04 on 970223-0405. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support ML20148B9621997-05-0505 May 1997 Notice of Violation from Insp on 970223-0405.Violation Noted:Prior to 961130,activities Affecting Quality,Not Accomplished in Accordance W/Instructions,Procedures or Drawings IR 05000369/19970051997-04-28028 April 1997 Insp Rept 50-369/97-05 on 970309-0405.No Violations Noted. Major Areas Inspected:Maint,Engineering & Plant Support 1999-08-26
[Table view] |
Inspection Report - McGuire - 1988001 |
---|
|
|
Text
,paca?o UNITED STATES F 9 o NUCLEAR REGULATORY COMMISSION O\ /,
R ECloN 11
'I #fl b 101 MARIETTA ST RE ET, 'k '
'f ATLANTA. GEORGI A 30323 s, w ,~
....*
Report Nos.: 50-369/88-01 and 50-370/88-01 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-369 cnd 50-370 License Nos.. NPF-9 and NPF-17 Facility hame: McGuire 1 and 2 Inspection Conduct -
January,4-S; 1988
/ /
Inspector:r,4 E.H/
j _
r
. .
IE 44M 83 #
D te Signed Approved by[ ^ j' y ,' ;'Ia
/ T g?fChief n,
'
\Date tw$bhf Signed Ma er and Pro se M tion Divi n of Re afety SUMMARY Scope: This routine, unannounced inspection was in the areas of previous enforcement matters, inservice testing of pumps and valves, and inspector followup item Results: No violations or deviations were identified.
l t
!
!
K G
l
'
.
.
REPORT DETAILS
, Persons Contacted Licensee Employees
- N. Atherton, Production Specialist III
- T. McConnel, Station Manager
- E. McCraw, Compliance Engineer
- Sample, Superintendent of Integrated Scheduling
- J. Snyder, Performance Engineer <
NRC Resident Inspectors ,
- Orders, Senior Resident Inspector
- 0. Nelson, Resident Inspector
- Attended exit interview Exit Interview The inspection scope and findings were summarized on January 8, 1988, with those persons indicated in paragraph 1. The inspector described the areas inspected and discussed in detail the inspection findings listed belo The inspector informed the licensee that they did not appear to have adequately addressed concerns expressed in unresolved item * 369, ,
370/86-28-08 and that the matter appeared to represent a violation or deviation,
,
'
The Station Manager requested his Performance Test personnel to make procedural changes within two months which may resolve the inspector's concern. The inspector discussed the matter further with the cognizant Performance Engineer on January 14, 1988 and, based on this discussion, the inspector stated the matter would remain unresolved pending NRC review !
of the planned procedural changes and related dat Details of this matter are described in paragraph 3.a of this inspection repor The inspector expressed concern to the licensee that performance Test personnel had not been responsive in providing previously promised historical data in support of their position with regard to unresolved item 370/87-37-01, as described in paragraph 3.c. below. The Station Manager directed performance personnel present to obtain and review the historical daca and determine if any corrective action was neede "An Unresolved Item is a matter about which more information is required to determine whether it is acceptable or may involve a violation or deviatio '
l i
(
,
_
'
.
I No dissenting comments were received from the licensee. The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio Item Number Status Title / Reference Paragraph 369, 270/86-26-08 Open Unresolved item - Written criteria for evaluation of erratic valve action (paragraph 3.a.)
369, 370/87-16-01 Open Unresolved Item - IST program require-ments for PORVs and block valves (paragraph 3.b.)
370/87-37-01 Open Unresolved Item - Valve failed to operate (paragraph 3.c.)
369, 370/86-26-06 Closed Inspector Followup Item - Valve position indication verification at auxiliary locations (paragraph 5) Licensee Action on Previous Enforcement Matters (92702) (0 pen) Unresolved Item (369, 370/86-26-08): Written Criteria for Evaluation of Erratic Valve Action This item identified the inspector's concern that the licensee has no written criteria covering their evaluation of valve test information for identification of erratic or abnormal valve action. The licensee has a compilation of valve stroke time data accessible through computer which they state is used to aid in identifying erratic or abnormal valve operation from stroke time testing. The identi-fication and reporting of erratic or abnormal valve operation is required by the code applicable to the licensee's valve testing, ASME Section XI (80WS0).
, The licensee's Performance Test Engineer had previously informed the
'
NRC inspector that written criteria covering the use of the computer valve data base was in preparation and would be completed by the end of 198 During the current inspecti w, the inspector asked to see the licensee's written criteria for use of the data and anticipated receiving a procedur Instead, he found that the licensee had incorporated the criteria into a training list. The criteria were not referenced or required to be utilized by requirements in any plant procedures. The inspector expressed his concern that this did not represent adequate implementation and that it represented a potential violation or deviation. The matter was discussed further
. _ _ _ __ _ ___--_-= . _ _ _ _ _ _ _ _ _ _ . __ _ -_ . _ _ _ _ _ _ _
_ - _ -
I
-
,
,
~'
. i
at the NRC exit meeting, during which the Station Manager directed .j Performance Test personnel to incorporate criteria into plant i procedures within two months, ;
- The NRC inspector discussed the matter further with the licensee's I Performance Engineer and Test Engineer during a telephone call on
January 14, 1988. -In that co'nversation, the inspector stated that the matter would remain unresolved (not a violation or deviation)
'
. pending NRC review of the procedural changes directed by the Station l Manage In addition, the inspector stated the following apparent examples of inadequacies in their implementation of criteria ' for .
identifying, reporting, and evaluating valve abnormalities and
>
'
erratic action that occur during stroke time testing:
,
!
'
(1) There are no written procedural controls on the valve data base
,
to ensure that:
- -
The data it contains is complete and accurate .
-
New data is added promptly
-
Access for making changes to the program or data base is controlled to maintain its accurac !
(2) There are no written procedural requirements for implementation
of use of the valve data base which describe:
-
Who is responsible for identifying (and reporting) valva !
stroking abnormalities or erratic action '
' -
Who evaluates the abnormalities or erratic action and -
determines whether corrective action is necessary :
4 -
Where the evaluation is documente l
!
(3) Numerical criteria that have been developed by the licensee ;
'
which address changes in measured stroke time are not adequately based. The criteria, which keyed to changes in stroke time of more than 25%, would fail to identify abnormalities that would !
be readily detected through widely accepted statistical method ,
j l
'
NOTE: The inspector stated that statistically based criteria
] would have identified the abnormal differences that sometimes
,
occur between computer and stopwatch timing of valves, as i addressed in unresolved item 370/87-37-01 (paragraph 3.c.).
(4) The criteria did not appear to have received expert engineering
- revie .
.
1 b. (0 pen) Unresolved Item (369, 370/87-16-01): IST Program Requirements l 1 for PORVs and Block Valves !
i
~
This item expresses concern that the licensee does not provide for ;
'
complete ASME Section XI testing of both their power operated relief l
!
l
!
I
. , _ _ ___ _ -_. _ . _ . . _
. _ _ . _ _ _ _ . . . - __ ..
-_ _ __ ___ _ ---- _ - _ - _ -- - - . - - _ _ - _ - - - - - - - - - - - - - - _ - - _ - _ - - -_ _ _ _ _ _ . - - _ _ _ . - . _ _ . -
....
.
valves and their block valves in their inservice testing (IST)
progra In the current inspection, the inspector was informed that the valves
,
are being tested in accordance. with Section XI requirements and that
a program revision would be sent to the NRC shortly to reflect this testin The inspector verified the licensee's procedural requirements for stroke timing the block valves and stated that the item would remain open pending further review of the PORV testing and their IST program revision submittal .
' (0 pen) Unresolved Item (370/87-37-01): Valve Failed to Operat This item identified concerns with regard to the valve stroke timin . As of the last inspection of this item in NRC Inspection 369, j 370/87-40, the concerns requiring resolution were as follows:
- (1) Although valve 2RN-231 failed to indicate the correct movement to open in its first actuation during testing, the licensee considered that the valve performed acceptably. The Performance Test Engineer stated that this type of valve had a history of not tripping the second limit switch. A work request (WR) was i issued to check the valve within two weeks. The NRC inspector
- questioned whether that long a delay in verifying correct valve operation was acceptable. The Unit was operating in Mode 1 at the time of the test and the valve in question was the decay heat removal pump 2B cooler isolation valve.
.
(2) Valve stroke time tests performed with the licensee's Operator a Aid Computer (OAC) yield stroke time values which, for some valves, may differ significantly (up to 10%) from stroke times obtained using stopwatches. This is because the timing for the
' two methods is done using indications from different limit switches. ASME Section XI (the Code applicable to this testing)
requires an increased frequency of testing or corrective action when stroke time increases of as small as 25% are observed. The licensee's procedures permit stopwatch timing when the OAC is not available but they do not provide for changes in determination of stroke time increases when the different methods are used. This is an apparent procedural deficiency as it could result in the Code requirements (for increased test
,
frequency or corrective action) not being me (3) The licensee does not calibrate or otherwise provide for assurance that the accuracy of the stopwatches used for stroke timing is maintaine With regard to (1) above, at the end of NRC Inspection 369, 370/87-37, the licensee had previously agreed to provide the NRC inspector with data supporting their contention that valves like 2RN-231 had a history of not tripping the second limit switch. The
_ _ _ _ _ - _ - _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ - ____ _ - __ ______ _ - _ - - _ _ _ _ _
_ _ _ _ _ -
s
.
'
,5 inspector requested the data at the beginning of Inspection 369, 370/87-40 but it was never provided. The NRC inspector again asked for the. data during the current inspection. The data was not provided and the inspector commented adversely on the licensee's responsiveness during the exit meeting -
The matter described in (2) above was not specifically addressed during the current inspection. However, as noted in 3.a. above, significant stroke time differences from the two timing methods would be identified as abnormalities if proper evaluation criteria were implemente With regard to (3) above, the inspector requested manufacturer's information describing the stopwatches used for stroke timing and asked if they were subject to any periodic maintenance checks. The inspector was informed that their was no periodic maintenance on the stopwatches. No other information was provide . Inservice Testing of Pumps and Valves (73756) Units 1 and 2 The NRC inspector examined the licensee's inservice testing (IST) of pumps and valves to determine whether regulatory requirements and licensee commitments were being met. The code requirements applicable to the licensee's IST are those of ASME Section XI (80W80).
The inspector's examination of IST was as follows: Responsibilities The inspector reviewed licensee instructions and procedures and interviewed cognizant licensee personnel to determine that the licensee had assigned responsibilities to persons and organizations for:
(1) preparation, review, and approval of inservice testing (IST)
procedures (2) scheduling of IST for normal and increased frequency testing (3) performance of testing per approved procedures (4) performance of post-maintenarce and post-modification IST (5) proper certification and callbration of IST instruments Instructions and procedures resuwed by the inspectors relative to the above were as follows:
_ _ _ _ _ _ _ . . _ _ _ _ . _ _ _ _ _ ___ __ _ __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
Document N Revision Title SD 4. Handling of Station Procedures SD 3. Identifying and Scheduling Plant Surveillance Testing SD 3. Identifying and Perf orming Plant Retesting SD 2. Control of Measuring and Test Equipment SD 2. Performance Measuring and Test Equipment - Control and Storage Procedure Control The inspector examined the licensee's procedure controls, as described in SD 2.1.1 R23, to verify that the licensee has requirements to assure the use of the latest procedure In addition, the inspector verified that the licensee utilized the correct revision of the test procedure in testing performed on Unit 1 Component Cooling Water pumps 181 and 1B2 during the NRC inspectio c. Scheduling The inspector reviewed the licensee's scheduling methods with the Superintendent of Integrated Scheduling to verify that the licensee's normal frequency scheduling of IST would be in conformance with the code requirements described in the licensee's IST program (Note: The NRC has not completed its evaluation and approval of the licensee's program). IST Procedure Content The inspector reviewed two of the licensee's IST procedures to verify that the procedures specify (except for items addressed by relief request or already identified as NRC items):
(1) valid test criteria for the components being tested (2) pump vibration test requirements that include vibration measurement locations and data analysis requirements (3) requirements that pump tests be conducted at reference conditions The procedures reviewed by the inspector were:
--
.
Procedure N Revision Title PT/1/A/4401/01B Changes 0-19 Component Cooling Train IB Performance Test PT/1/A/4403/01B Changes 0-28 Nuclear Service Water Train 18 Performance Test e. Observation of Pump Test The inspector observed IST performed on Unit 1 Component Cooling Water pump 182 to verify conformance with procedure PT/1/A/4401/1B requirements relative to:
(1) test gage ranges and calibration (2) proper flow (3) test ouration (4) location of vibration measurements (5) recording of required data While observing the pump test, the inspector noted a manual component cooling valve locked in position through a chain attacning the valve handle to a cable tra The tray did not appear to contain safety-related cables. The inspector informed operations supervision and the chain was promptly removed from the cable tray. The chaining of the cable tray to the valve was of concern because it might have caused stresses not considered in the design (under accident i conditions). The inspector subsequently toured the Auxiliary Building and did not observe any additional examples of improperly chained valves. The example previously observed by the inspector was apparently an isolated instanc f. Records Review (1) Pumps The inspector reviewed the licensee's completed procedure record, dated January 6, 1988, of IST performed on Unit 1 pumps 1B1 and 182 (per procedure PT/1/A/4M1/1B) to verify that the record showed proper entries of data, test performance, calculations and evaluation of dat (2) Valves
'
The inspector reviewed the licensee's computer data base to verify that the following power operated valves had been stroke timed at the required test frequencies (quarterly or cold <
shutdown) during 1985 through 1987:
_________________
. o g
,.
Valve N Category Test Dates 1KC424b* A, B 4/22/85, 7/16/86, 11/3/86, 11/16/86, 10/11/87, 10/17/87 2KC424b* A, B 2/27/85, 4/9/85, 7/15/85, 12/16/85, 4/4/86, 5/2/86, 11/4/86, 5/7/87 IKC425a* A, B 4/22/85, 7/16/86, 11/3/86, 9/18/87, 10/18/87, 10/19/87 2KC425a* A, B 2/27/85, 4/9/85, 7/15/85,
,
12/16/85, 4/4/86, 11/4/86, 5/7/87, 5/29/87 1RN63a* B 4/22/85, 6/24/86, 11/12/86, 11/24/86, 11/8/87 2RN63a* B 1/30/85#, 7/15/85#, 12/13/85#,
4/2/86#, 11/10/86#, 5/7/87 l
1RN64a* B 4/22/85, 6/24/86, 11/12/86, 11/24/86, 11/8/87 2RN64a* B 1/30/85#, 7/15/85#, 12/13/85#,
5/7/86#, 11/10/86#, 5/7/87 1RN134a B 12/19/86, 3/16/87, 6/8/87#,
l 9/3/87#, 11/6/87#, 11/27/87#, i 12/1/87 2RN134a B 7/23/86, 10/23/86, 1/14/87, 4/7/87, 6/25/87, 7/1/87, 10/1/87, 12/21/87 1RN137a B 10/14/86, 12/19/86, 3/16/87, 6/11/87#, 9/3/87#, 9/29/87#,
11/6/87#, 11/27/87#
2RN137a B 7/25/86, 10/23/86, 1/14/87, 4/7/87, 4/28/87, 7/1/87, 10/1/87, 12/21/87 t
'
NOTES: 1. An * beside the valve number identifies a valve required to be tested on a cold shutdown frequenc Otherwise the valves were to be ;
tested quarterly, i
'
,
. - - _. . - _ . .,-
, _ . - - _ _ _ - - - - - - . - - - _ - - - - - - - - - - - - _ _ - - - - _ _ - - _ _ _
.
..
,
2. An i beside a test date indicates the inspector verified accuracy of the test date and stroke time given in the licensee's computer data base by checking the completed procedure recor . The first valve number indicates the Unit (1 of 2). The two following letters indicate the system. RN is Nuclear Service Water and KC is Component Coolin In reviewing the pump procedures, as described in 4.d above, the inspector noted that the procedures appeared not to require an immediate comparison of pump test data with acceptance criteri This would pemit unsatisfactory pump perfonnance to go unrecognized for several days pending an "analysis" of the data. The Performance Test Engineer assured the NRC inspector that, in practice, the test values were checked immediately after test completion and if the values indicated unacceptable pump performance the pumps were quickly declared inoperabl The inspector accepted this explanation but the matter will be examined further in routine NRC inspection of the licensee's pump testin Within the area inspected, no violations or deviations were identifie . Inspector Followup Items (92701)
(Closed) Inspector Followup Item (369, 370/86-26-06): Valve Position Indicator Checks at Auxiliary Location This item identified a question as to whether or not the licensee verified proper position indication for valves at auxiliary control location During the current inspection, the NRC inspector discussed the item with the licensee's Performance Test Engineer. The Test Engineer identified procedure changes that had been made to assure that valve position indicatcrs at auxiliary control locations were correctly checked. Based on the information provided, this matter is considered closed, i.