| Site | Start date | Title | Description |
---|
ENS 57431 | Seabrook | 19 November 2024 18:50:00 | Manual Reactor Trip | The following information was provided by the licensee via phone and email:
At 1350 (EST) on 11/19/2024, with Unit 1 in mode 1 at 100% power, the reactor was manually tripped due to an automatic trip of the `B' main feedwater pump turbine. The reactor trip was uncomplicated with all systems responding normally post trip. Operations stabilized the plant in mode 3. Decay heat removal is being accomplished by the steam dumps to the condenser.
Emergency feedwater actuated due to low-low steam generator (water) level, as expected.
This event is being reported pursuant to 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A).
The NRC resident inspector has been notified.
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The cause of the 'B' main feedwater pump trip is under investigation. There was maintenance involving the 'B' main feedwater pump at the time of the scram. |
ENS 57432 | Seabrook | 19 November 2024 18:50:00 | Manual Reactor Trip | The following information was provided by the licensee via phone and email:
At 1350 (EST) on 11/19/2024, with Unit 1 in mode 1 at 100 percent power, the reactor was manually tripped due to an automatic trip of the `B' main feedwater pump turbine. The reactor trip was uncomplicated with all systems responding normally post trip. Operations stabilized the plant in mode 3. Decay heat removal is being accomplished by the steam dumps to the condenser.
Emergency feedwater actuated due to low-low steam generator level, as expected.
This event is being reported pursuant to 10 CFR 50.72(b)(2)(iv)(B) and 10 CFR 50.72(b)(3)(iv)(A).
The NRC resident inspector has been notified.
The following additional information was obtained from the licensee in accordance with Headquarters Operations Officers Report Guidance:
The cause of the 'B' main feedwater pump turbine trip is under investigation. |
IR 05000259/2024003 | Browns Ferry | 4 November 2024 | Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 | |
IR 05000369/2024003 | Mcguire McGuire | 4 November 2024 | Integrated Inspection Report 05000369/2024003 and 05000370/2024003 | |
ML24151A384 | Limerick | 31 October 2024 | – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 | |
ML24305A288 | Abilene Christian University | 31 October 2024 | Nuclear Energy Experimental Testing Lab. (Next) - Abilene Christian University - Molten Salt Research Reactor Regulatory Engagement Plan, Revision 2 | |
ML24254A463 | | 31 October 2024 | Sdaa FSER Chapter 14 - ITAAC | |
ML22199A246 | | 30 October 2024 | DG-5074 - Access Authorization Program for Commercial Nuclear Plants | |
ML22203A131 | | 30 October 2024 | DG-5076 - Guidance for Technology-Inclusive Requirements for Physical Protection of Licensed Activities at Commercial Nuclear Plants | |
ML24304B046 | 05200050 | 30 October 2024 | LLC, Reply to a Notice of Violation, EA-24-057 | |