Forwards Safety Insp Rept 50-454/85-43 on 851002-31. Violation Noted.Response to Violations Not Required Until Notification of Proposed Enforcement Actions Following 851127 Enforcement Conference
ML20137X202
Person / Time
Site: Byron Constellation icon.png
Issue date: 11/22/1985
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20137X208 List:
References
NUDOCS 8512100438
Download: ML20137X202 (2)


See also: IR 05000454/1985043

Text

,

)

NOV 2 21985

Docket No. 50-454

Coninonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. J. M. Hinds, Jr.,

P. G. Brochman, R. M. Lerch, and Ms. J. A. Malloy of this office on October 2 - 31,

1985, of activities at Byron Station Unit 1, authorized by NRC Operating

License NPF-37 and to the discussion of our findings with Mr. R. E. Querio and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in

apparent violation of NRC requirements.

We are releasing this report at this time for your information. Following the

Enforcement Conference scheduled for November 27, 1985, you will be notified

by separate correspondence of our decision regarding enforcement action based

on the findings of this inspection. No written response is required until you

are notified of the proposed enforcement action.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

NfgBT SfpH Vf.G.~Greenman'

B512100438 851122

PDR ADOCK 05000454

G PDR Charles E. Norelius, Director

Division of Reactor Projects

Enclosure: Inspection Report No.

50-454/85043(DRP)

cc w/ enclosure: See Distribution

RII RIII I RIII RII

gwl e% y)I p n o ( M' C gpl

Lerch/rl Forney reed Warnick (deV Norel us

11/ft/85 11/2o /85 11/J./8511/Ql/85 pffkf511/2$5 i

T

]

, ,

.

Comonwealth Edison Company -2-. NOV 221985

.

Distribution:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Byron Project

Construction Manager

R. E. Querio, Station Manager

.

DMB/ Document Control Desk (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W.-Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

S. Lewis, ELD

L. Olshan, NRR LPM

H. S. Taylor, Quality Assurance

Division

b