ML20195J669: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:,  ,' .
                                        JUN I 71988
    In Reply Refer To:
    Docket: 50-382/88-17
    Louisiana Power & Light Company
    ATTN:    J. G. Dewease, Senior Vice President
              Nuclear Operations
    317 Baronne Street
    New Orleans, Louisiana 70160
    Gentlemen:
    This refers to the inspection conducted by Messrs. H. F. Cundy and T. O.
    McKernon of this office during the period May 31 through June 3, 1988, of
    activities authorized by NRC Operating License NPF-38 for the Waterford Steam
    Electric Station, Unit 3, and to the ciscussion of our findings with Mr. N. S.
    Carns, and other members of your staff at the conclusion of the inspection.
    Areas examined during the inspection included startup testing. Within this
    area, the inspection consisted of selective examination of procedures and
    representative records, interviews with personnel, and observations by the NRC
    inspectors.    The inspection findings are documented in the enclosed inspection
    report.
    During this inspection, it was found that certain of your activities were in
    violation of NRC requirements. Consequently, you are required to respond to
    this violation, in writing, in accordt o.a with the provisions of Section 2.201
    of the NRC's "Rules of Practice," Part      , Title 10, Code of Federal
    Regulations. Your response should be based on the specifics contained in the
    Notice of Violation enclosed with this letter.
    The response directed by this letter and the accompanying Notice is not subject
    to the clearance procedures of the Office of Management and Budget as required
    by the Paperwork Reduction Act of 1980, PL 96-511.
l
l
    Should you have any questions concerning this inspection, we will be pleased to
    discuss them with you.
                                                Sincerely,
                                                Original Signed By
                                                    A. B. Beach
                                                L. J. Callan, Director
l
l
                                                Division of Reactor Projects
    Enclosures:    (see next page)                /
l    RIV:RI *          RI:TPS *        C:TPS * mDI RS1        C:DRP/A      D:DfP
    HFBundy:gb        TOMcKernon      WCSeidle    L    hoan DDChamberlain LJCallan
        / /88            / /88          / /88    6/p/88 (. //$/88        G /l7/88
    Reconcur        +previously concurred
    WCSeidle
!                                                                                      \ \
      $/lll88
                                                                                    []/
t
'
      8806290100 880617
    gDR    ADOCK 05000302
t                        PDR
 
,    .
  Louisiana Power & Light Company        -2-
  Enclosures:
  1.    Appendix A - Notice of Violation
  2.    Appendix - NRC Inspection Report
          50-382/88-17
  cc w/ enclosures:
  Louisiana Power & Light Company
  ATTN:  G. E. Wuller, Onsite
            Licensing Coordinator
  P.O. Box B
  Killona, Louisiana 70066
  Louisiana Power & Light Company
  ATTN:  N. S. Carns, Plant Manager
  P.O. Box B
  Killona, Louisiana 70066
  Middle South Services
  ATTN:  Mr. R. T. Lally
  P.O. Box 61000
  New Orleans, Louisiana 70161
  Louisiana Power & Light Company
  ATTN:  R. F. Burski, Acting Manager
          Nuclear Safety and Regulatory
            Affairs
  317 Baronne Street
  P.O. Box 60340
  New Orleans, Louisiana 70160
  Louisiana Radiation Control Program Director
  bec to DMB (IE01)
  bcc distrib. by RIV:
  *RRI                                      R. D. Martin, RA
  *Section Chief (DRP/A)                  *DRP
  *RPSB-DRSS                              * MIS System
  * Project Engineer, DRP/A              *RSTS Operator
  *RIV File                              *D. Wigginton, NRR Project Manager
  *DRS                                    *H. Bundy
  Lisa Shea, R*i/ALF                      G. F. Sanborn, E0
  *W.  C. Seidle                          J. P. Clausner, DRP
  *T. O. McKernon
  ^w/766
}}
}}

Latest revision as of 14:38, 13 November 2020

Forwards Insp Rept 50-382/88-17 on 880531-0603 & Notice of Violation
ML20195J669
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/17/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20195J671 List:
References
NUDOCS 8806290188
Download: ML20195J669 (2)


See also: IR 05000382/1988017

Text

, ,' .

JUN I 71988

In Reply Refer To:

Docket: 50-382/88-17

Louisiana Power & Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Messrs. H. F. Cundy and T. O.

McKernon of this office during the period May 31 through June 3, 1988, of

activities authorized by NRC Operating License NPF-38 for the Waterford Steam

Electric Station, Unit 3, and to the ciscussion of our findings with Mr. N. S.

Carns, and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection included startup testing. Within this

area, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

inspectors. The inspection findings are documented in the enclosed inspection

report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordt o.a with the provisions of Section 2.201

of the NRC's "Rules of Practice," Part , Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

l

l

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

A. B. Beach

L. J. Callan, Director

l

l

Division of Reactor Projects

Enclosures: (see next page) /

l RIV:RI * RI:TPS * C:TPS * mDI RS1 C:DRP/A D:DfP

HFBundy:gb TOMcKernon WCSeidle L hoan DDChamberlain LJCallan

/ /88 / /88 / /88 6/p/88 (. //$/88 G /l7/88

Reconcur +previously concurred

WCSeidle

! \ \

$/lll88

[]/

t

'

8806290100 880617

gDR ADOCK 05000302

t PDR

, .

Louisiana Power & Light Company -2-

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix - NRC Inspection Report

50-382/88-17

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite

Licensing Coordinator

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN: Mr. R. T. Lally

P.O. Box 61000

New Orleans, Louisiana 70161

Louisiana Power & Light Company

ATTN: R. F. Burski, Acting Manager

Nuclear Safety and Regulatory

Affairs

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

  • RRI R. D. Martin, RA
  • Section Chief (DRP/A) *DRP
  • RPSB-DRSS * MIS System
  • Project Engineer, DRP/A *RSTS Operator
  • RIV File *D. Wigginton, NRR Project Manager
  • DRS *H. Bundy

Lisa Shea, R*i/ALF G. F. Sanborn, E0

  • W. C. Seidle J. P. Clausner, DRP
  • T. O. McKernon

^w/766