ML20195J669
| ML20195J669 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 06/17/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20195J671 | List: |
| References | |
| NUDOCS 8806290188 | |
| Download: ML20195J669 (2) | |
See also: IR 05000382/1988017
Text
,' .
,
JUN I 71988
In Reply Refer To:
Docket: 50-382/88-17
Louisiana Power & Light Company
ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
317 Baronne Street
New Orleans, Louisiana 70160
Gentlemen:
This refers to the inspection conducted by Messrs. H. F. Cundy and T. O.
McKernon of this office during the period May 31 through June 3, 1988, of
activities authorized by NRC Operating License NPF-38 for the Waterford Steam
Electric Station, Unit 3, and to the ciscussion of our findings with Mr. N. S.
Carns, and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included startup testing. Within this
area, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordt o.a with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part
, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
l
l
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
A. B. Beach
l
L. J. Callan, Director
l
Division of Reactor Projects
Enclosures:
(see next page)
/
l
RIV:RI *
RI:TPS *
C:TPS *
mDI RS1
C:DRP/A
D:DfP
HFBundy:gb
TOMcKernon
WCSeidle
L
hoan DDChamberlain LJCallan
/ /88
/ /88
/ /88
6/p/88
(. //$/88
G /l7/88
Reconcur
+previously concurred
WCSeidle
\\ \\
$/lll88
!
t
8806290100 880617
[]/
'
gDR
ADOCK 05000302
t
,
.
Louisiana Power & Light Company
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix - NRC Inspection Report
50-382/88-17
cc w/ enclosures:
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P.O. Box B
Killona, Louisiana 70066
Louisiana Power & Light Company
ATTN:
N. S. Carns, Plant Manager
P.O. Box B
Killona, Louisiana 70066
Middle South Services
ATTN:
Mr. R. T. Lally
P.O. Box 61000
New Orleans, Louisiana 70161
Louisiana Power & Light Company
ATTN:
R. F. Burski, Acting Manager
Nuclear Safety and Regulatory
Affairs
317 Baronne Street
P.O. Box 60340
New Orleans, Louisiana 70160
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bcc distrib. by RIV:
- RRI
R. D. Martin, RA
- Section Chief (DRP/A)
- DRP
- RPSB-DRSS
- MIS System
- Project Engineer, DRP/A
- RSTS Operator
- RIV File
- D. Wigginton, NRR Project Manager
- DRS
- H.
Bundy
Lisa Shea, R*i/ALF
G. F. Sanborn, E0
- W. C. Seidle
J. P. Clausner, DRP
- T.
O. McKernon
^w/766