u                                    EVAfrATION RESEARCF CORPCFt. TION CONTROL.EJ COPY CONTROL NO.A=-ool COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE NO.: 001 PROCEDURE NO.: CPP-007 REVISION: 2 ISSUE DATE: 02/21/86 O                        PREPARATION OF CHECKLISTS AND DATA BASE REPORTS Prepared by:                                            Date:  b NO!h Approved by:                                  'b        Date:  I!ZO[Oh
                                                                                ~
On-SiteQARepresentativeJ Approved by:                                            Date:      2# Y 8
* QA/ C Review Team Leader O
8607170078 860711            S PDR  ADOCK 0500 A
 
  '_'                                                          Change Notice: 001 f.
T                                                            CPP-007 Revisien:  2 O
V      Pe'.fse'Section 5.3, in part, to read:
: 1.                                                      ,
            "*  List all of the Verification Packages associated with the affected population and accepted previously by the QA/QC Lead Discipline Engineer, as indicated on the Verification Package Contents form.
Specify what effect the change will have on each Verification Package accepted previously,    e.g., no effect, requires reinspection, etc."
O l-O 2}}

Latest revision as of 10:02, 1 January 2021

Change Notice 001 to Rev 2 to Procedure CPP-007, Preparation of Checklists & Data Base Repts
ML20202J424
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/21/1986
From: Hansel J
EVALUATION RESEARCH CORP.
To:
Shared Package
ML20202J051 List: ... further results
References
CPP-007, CPP-7, NUDOCS 8607170078
Download: ML20202J424 (2)


Text

.

Page 1 of 2

-j i

f}

u EVAfrATION RESEARCF CORPCFt. TION CONTROL.EJ COPY CONTROL NO.A=-ool COMANCHE PEAK RESPONSE TEAM PROJECT PROCEDURE FOR ISSUE-SPECIFIC ACTION PLAN VII.c CHANGE NOTICE NO.: 001 PROCEDURE NO.: CPP-007 REVISION: 2 ISSUE DATE: 02/21/86 O PREPARATION OF CHECKLISTS AND DATA BASE REPORTS Prepared by: Date: b NO!h Approved by: 'b Date: I!ZO[Oh

~

On-SiteQARepresentativeJ Approved by: Date: 2# Y 8

  • QA/ C Review Team Leader O

8607170078 860711 S PDR ADOCK 0500 A

'_' Change Notice: 001 f.

T CPP-007 Revisien: 2 O

V Pe'.fse'Section 5.3, in part, to read:

1. ,

"* List all of the Verification Packages associated with the affected population and accepted previously by the QA/QC Lead Discipline Engineer, as indicated on the Verification Package Contents form.

Specify what effect the change will have on each Verification Package accepted previously, e.g., no effect, requires reinspection, etc."

O l-O 2