ML20245C302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 2
| page count = 2
| project = TAC:1228
| stage = Approval
}}
}}



Latest revision as of 22:06, 23 May 2023

Advises That Design & Schedule of Proposed Mods to Operational Status Alarms of Diesel Generators Acceptable
ML20245C302
Person / Time
Site: Beaver Valley
Issue date: 08/17/1978
From: Schwenneer A
Office of Nuclear Reactor Regulation
To: Dunn C
DUQUESNE LIGHT CO.
References
TAC-1228, NUDOCS 8710220093
Download: ML20245C302 (2)


Text

\  ? ;)

\

3r r.arg$ .[ Thlidi Ec gG UNITED STATES

.O3 ~% NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

+.... - August 17, 1978 Docket No. 50-334 Duquesne Light Company ATTN: Mr. C. N. Dunn, Vice President Operations Division 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 .

Gentlemen:

j After reviewing the information provided in your letter of March 28, 1977, for Beaver Valley Power Station, Unit No.1, and discussing that information with your staff on May 30 and June 5,1973, we have concluded that the design and schedule of the modifications you

plan to make to your operational status alarms of the diesel generators are acceptable, it is our understanding that these modifii
ations will be completed by not later than the startup after the next efueling (about December,1978).

Sincer ,

7 sh l

i A. Schw _r, Chief Operating Reactors Branch No.1 l

Division of Operating Reactors cc: See next page 1

l ..

i s

s 1

l i

8710220093 780917 -

PDR ADOCK OD( 00334 p PDR

i s.

i<

l Duquesne Light Company -2 - August 17, 1978 l

! 56

! cc: Gerald Charnoff, Esquire Mr. James A. Wdrling i Jay E. Silberg, Esquire Plant Superintendent Shaw, Pittman, Potts & Trowbridge Beaver Valley Power Station 1800 M Street, N.W. P. O. Box 4 Washington, D. C. 20036 Shippingport, Pennsylvania 15077 Karin Carter, Esquire Special Assistant Attorney General Bureau of Administrative Enforcement 5th Floor, Executive House Harrisburg, Pennsylvania 17120 Mr. J. M. Cumiskey Stone & Webster Engineering Corporation P. O. Box 2325 Boston, Massachusetts 02107 Mr. J. D. Woodward R&D Center i Westinghouse Electric Corporation Building 7-303 Pittsburgh, Pennsylvania 15230 Beaver Area Memorial Library' 100 College Avenue Beaver, Pennsylvania 15009 Mr. Jack Car Technical A sistant Duquesne Light Company P. O. Box 4 Shippingport, Pennsylvania 15077 Mr. R. E. Martin Duquesne Light Company 435. Sixth Avenue Pittsburgh, Pennsylvania 15219 Marvin Fein Utility Counsel l City of Pittsburgh 313 City-County Building Pi ttsburgh,Pennsyl vania 15219

/ ,

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ .