ML20154J973: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20154J973
| number = ML20154J973
| issue date = 09/16/1988
| issue date = 09/16/1988
| title = Forwards FEMA 880728 Ltr Containing Offsite Emergency Preparedness Findings of State of Il for 871014 Exercise. No Deficiencies & Two Weaknesses Identified,Involving Corrective Actions Determined Acceptable
| title = Forwards FEMA Containing Offsite Emergency Preparedness Findings of State of Il for 871014 Exercise. No Deficiencies & Two Weaknesses Identified,Involving Corrective Actions Determined Acceptable
| author name = Shafer W
| author name = Shafer W
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8809230189
| document report number = NUDOCS 8809230189
| title reference date = 07-28-1988
| package number = ML20154J977
| package number = ML20154J977
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
Line 21: Line 22:
SEP 161988 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690                                                                  ;
SEP 161988 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690                                                                  ;
Gentlemen:
Gentlemen:
We have received the enclosed Federal Emergency Management Agency (FEMA) letter dated July 28, 1988, containing the offsite emergency preparedness findings for the State of Illinois, Ogle County and five municipalities for the Byron Nuclear Power Station exercise conducted on October 14, 1987. No deficiencies were observed by FEMA during the exercise. However, two weaknesses were identified requiring corrective action. FEMA Region V evaluated the corrective actions for the exercise weaknettes submitted by          l the State of Illinois and determined that they were acceptable. Based              '
We have received the enclosed Federal Emergency Management Agency (FEMA) {{letter dated|date=July 28, 1988|text=letter dated July 28, 1988}}, containing the offsite emergency preparedness findings for the State of Illinois, Ogle County and five municipalities for the Byron Nuclear Power Station exercise conducted on October 14, 1987. No deficiencies were observed by FEMA during the exercise. However, two weaknesses were identified requiring corrective action. FEMA Region V evaluated the corrective actions for the exercise weaknettes submitted by          l the State of Illinois and determined that they were acceptable. Based              '
on the performance of the offsite agencies during this exercise, and the corrective actions implemented, FEMA has determined that offsite radiological      l
on the performance of the offsite agencies during this exercise, and the corrective actions implemented, FEMA has determined that offsite radiological      l
,        emergency preparedness is adequate to protect the health and safety of the public. Therefore, the approval of offsite plans for the Byron Nuclear Power Station granted under 44 CFR 350 remains in effect.
,        emergency preparedness is adequate to protect the health and safety of the public. Therefore, the approval of offsite plans for the Byron Nuclear Power Station granted under 44 CFR 350 remains in effect.

Latest revision as of 06:35, 10 December 2021

Forwards FEMA Containing Offsite Emergency Preparedness Findings of State of Il for 871014 Exercise. No Deficiencies & Two Weaknesses Identified,Involving Corrective Actions Determined Acceptable
ML20154J973
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/16/1988
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20154J977 List:
References
NUDOCS 8809230189
Download: ML20154J973 (2)


Text

. ._

. 4 b

SEP 161988 Docket No. 50-454 Docket No. 50-455 Commonwealth Edison Company ATTN: Mr. Cordell Reed Senior Vice President Post Office Box 767 Chicago, IL 60690  ;

Gentlemen:

We have received the enclosed Federal Emergency Management Agency (FEMA) letter dated July 28, 1988, containing the offsite emergency preparedness findings for the State of Illinois, Ogle County and five municipalities for the Byron Nuclear Power Station exercise conducted on October 14, 1987. No deficiencies were observed by FEMA during the exercise. However, two weaknesses were identified requiring corrective action. FEMA Region V evaluated the corrective actions for the exercise weaknettes submitted by l the State of Illinois and determined that they were acceptable. Based '

on the performance of the offsite agencies during this exercise, and the corrective actions implemented, FEMA has determined that offsite radiological l

, emergency preparedness is adequate to protect the health and safety of the public. Therefore, the approval of offsite plans for the Byron Nuclear Power Station granted under 44 CFR 350 remains in effect.

We fully recognize that remedial actions implemented involve other agencies and political institutions which are not under your direct control.

Nonetheless, we do expect the subject of offsite emergency preparedness for

, the area around the Byron Nuclear Power Station to continue will be addressed by your staff.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.

Sincerely, 8807230109 080916' 4 DR ADDCK 0500 4 W. D. Shafer, Chicf Emergency Preparedness and Radiological Protection Branch

Enclosure:

As stated See Attached Distribution b RAII RIII YRIII RI h@h3irer PioT4 W

,M Mw.. A 'l

. 4 t.

Commonwealth Edison Company 2 SEP 161998 Distribution cc w/ enclosure:

T. J. Maiman, Vice President, PWR Operations H. Bliss, Nuclear Licensing Manager R. Plentewicz, Station Manager DCD/DCB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Byron Resident Inspector, RIII l

Braidwood '

O. W. Cassel, Jr. , Esq.

Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division i Diane Chavez DAARE/ SAFE L. 01shan, NRR LPM j

H. S. Taylor, Quality Assurance Division

! cc w/o enclosure:

W. Travers, EPB, NRR W. Weaver, FEMA, RV

- - - - - - - - - - - -