Zion Nuclear Power Station Units 1 and 2 Detailed Control Room Design Review -
Zion Nuclear Power Station Units 1 and 2 Detailed Control Room Design Review -
NUREG-0737, Item I.D.1 NRC Docket Nos. 50-295 and 50-304 References (a): April 14, 1983 letter from Cordell Reed to H. R. Denton.
NUREG-0737, Item I.D.1 NRC Docket Nos. 50-295 and 50-304 References (a): {{letter dated|date=April 14, 1983|text=April 14, 1983 letter}} from Cordell Reed to H. R. Denton.
(b): November 15, 1983 letter from Cordell Reed to H. R. Denton.
(b): {{letter dated|date=November 15, 1983|text=November 15, 1983 letter}} from Cordell Reed to H. R. Denton.
H                            (c): June 12, 1984 letter from S. A. Varga t.
H                            (c): {{letter dated|date=June 12, 1984|text=June 12, 1984 letter}} from S. A. Varga t.
D. L. Farrar.
D. L. Farrar.



Latest revision as of 20:18, 9 December 2021

Forwards Dcrdr Final Summary Rept,Program Implementation, Vol 1 & Dcrdr Final Summary Rept,Review Findings,Vol 2, Per 830414 & 1115 Commitments & 840612 Order.Listed Info Corrects Page 8-2 of Vol 1 Re Currently Planned Outages
ML20155G914
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/01/1986
From: Leblond P
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20155G918 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.D.1, TASK-TM 1639K, NUDOCS 8605070240
Download: ML20155G914 (2)


Text

(

s

. Commonwealth Edison W t one First National Plaza. Chicago Ithno.s

' Address Repty to Post Othee Box 767

, Chicago. Ilknois 60090 May 1, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Nuclear Power Station Units 1 and 2 Detailed Control Room Design Review -

NUREG-0737, Item I.D.1 NRC Docket Nos. 50-295 and 50-304 References (a): April 14, 1983 letter from Cordell Reed to H. R. Denton.

(b): November 15, 1983 letter from Cordell Reed to H. R. Denton.

H (c): June 12, 1984 letter from S. A. Varga t.

D. L. Farrar.

Dear Mr. Denton:

Enclosed are 13 copies of the Detailed Control Room Design Review (DCRDR) Final Summary Report for Commonwealth Edison Company's Zion Station including a single, unbound copy. This report meets the commitment made by Commonwealth Edison in references (a) and (b), which was confirmed by the Order transmitted by reference (c). Also included is a single, four volume set of photographs of Zion's control room.

Volume 1 of this report summarizes how each phase of the review was conducted and identifies the individuals involved in the review along with their qualifications. Volume 2 of this report includes all Human Engineering Discrepancy (HED) findings, responses, and proposed schedule for implementation of the respective corrective actions.

This proposed schedule, as discussed in reference (a), is predicated upon NRC approval of Ceco's disposition of each of the HED's included in Volume 2. Reference (a) also stated that this schedule is subject to equipment availability, available outage time and engineering design lead time. In addition, some issues may affect more than one emergency response activity and thus would require additional evaluation to assure that an integrated corrective action is taken.

g 9 Cd> - f @

8605070240 860501 PDR ADOCK 05000295 k

P PDR

,h..

Mr. H. R. Denton May 1, 1986 The proposed schedule is expressed in terms of the first or second refueling outage following NRC approval. The information below corrects information supplied on page 8-2 of Volume 1. The currently planned outages are as follows:

Unit 1 ist outage October 1987 2nd outage March 1989 Unit 2 1st outage September 1988 2nd outage January 1990 Note that an approximate nine month lead time is required to adequately plan for these outages. Thus, the October 1987 Unit 1 outage would require NRC approval before January of 1987 in order for it to be considered as the first refueling outage for implementation purposes.

If any questions arise concerning this matter, please contact this F office.

Very truly yours,

p. C. LeBlond Nuclear Licensing Administrator la Enclosure cc: Region III Inspector - Zion J. A. Norris - NRR 1639K