Pages that link to "U-602305, Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay"
Jump to navigation
Jump to search
The following pages link to U-602305, Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay:
Displayed 3 items.
- ML20070C318 (redirect page) (← links)
- ML19305C020 (← links)
- ML19325C952 (← links)
- ML19321B262 (← links)
- ML19321B180 (← links)
- ML19321A492 (← links)
- ML19320C343 (← links)
- ML19320C330 (← links)
- ML19320C320 (← links)
- ML19320C308 (← links)
- ML19351F840 (← links)
- ML19344E011 (← links)
- ML19344B079 (← links)
- ML19341B798 (← links)
- ML19339A306 (← links)
- ML19338G149 (← links)
- ML19337A616 (← links)
- ML19331C570 (← links)
- ML19330B747 (← links)
- ML19330B681 (← links)
- ML19330B566 (← links)
- ML20010C934 (← links)
- ML20009C584 (← links)
- ML20004F716 (← links)
- ML20003H339 (← links)
- ML20003G467 (← links)
- ML20003B128 (← links)
- ML20002B965 (← links)
- ML20024F646 (← links)
- ML20024A503 (← links)
- ML20024A489 (← links)
- ML20028C283 (← links)
- ML20028C178 (← links)
- ML20028C128 (← links)
- ML20027D001 (← links)
- ML20052J068 (← links)
- ML20052H979 (← links)
- ML20052E810 (← links)
- ML20052E491 (← links)
- ML20042C494 (← links)
- ML20041E290 (← links)
- ML20040G548 (← links)
- ML20054J498 (← links)
- ML20040A024 (← links)
- ML20054G604 (← links)
- ML20054G185 (← links)
- ML20054F250 (← links)
- ML20054F025 (← links)
- ML20054E985 (← links)
- ML20064K859 (← links)
- ML20062K475 (← links)
- ML20062K340 (← links)
- ML20062J601 (← links)
- ML20062D170 (← links)
- ML20062C982 (← links)
- ML20062C639 (← links)
- ML20071B722 (← links)
- ML20071B676 (← links)
- ML20071B447 (← links)
- ML20071B441 (← links)
- ML20070V803 (← links)
- ML20070T349 (← links)
- ML20070N041 (← links)
- ML20070M371 (← links)
- ML20070C146 (← links)
- ML20069N277 (← links)
- ML20069H185 (← links)
- ML20069H031 (← links)
- ML20069H023 (← links)
- ML20067A837 (← links)
- ML20066H130 (← links)
- ML20066E139 (← links)
- ML20087K638 (← links)
- ML20087G120 (← links)
- ML20087A836 (← links)
- ML20086P168 (← links)
- ML20086P162 (← links)
- ML20085H694 (← links)
- ML20084L295 (← links)
- ML20084L148 (← links)
- ML20084F849 (← links)
- ML20084F579 (← links)
- ML20084F526 (← links)
- ML20084F314 (← links)
- ML20084B340 (← links)
- ML20084B007 (← links)
- ML20083Q769 (← links)
- ML20083K956 (← links)
- ML20083K477 (← links)
- ML20083K448 (← links)
- ML20083K409 (← links)
- ML20083J727 (← links)
- ML20083J342 (← links)
- ML20083J307 (← links)
- ML20083G834 (← links)
- ML20083G022 (← links)
- ML20083D995 (← links)
- ML20083D797 (← links)
- ML20082D334 (← links)
- ML20082D004 (← links)
- ML20081H692 (← links)
- ML20081H538 (← links)
- ML20081G038 (← links)
- ML20080S848 (← links)
- ML20080S806 (← links)
- ML20080Q484 (← links)
- ML20080P855 (← links)
- ML20080M673 (← links)
- ML20080M566 (← links)
- ML20080B282 (← links)
- ML20080B020 (← links)
- ML20079S166 (← links)
- ML20079S137 (← links)
- ML20079H097 (← links)
- ML20079F896 (← links)
- ML20078B871 (← links)
- ML20077Q590 (← links)
- ML20077Q413 (← links)
- ML20077G222 (← links)
- ML20076K838 (← links)
- ML20076K630 (← links)
- ML20076K556 (← links)
- ML20076C952 (← links)
- ML20076A818 (← links)
- ML20076A640 (← links)
- ML20073R540 (← links)
- ML20073E810 (← links)
- ML20102A432 (← links)
- ML20101U485 (← links)
- ML20101Q227 (← links)
- ML20101P317 (← links)
- ML20101D697 (← links)
- ML20101B854 (← links)
- ML20101B656 (← links)
- ML20101B632 (← links)
- ML20100J730 (← links)
- ML20100J670 (← links)
- ML20100G119 (← links)
- ML20100F918 (← links)
- ML20100F900 (← links)
- ML20100E635 (← links)
- ML20100E613 (← links)
- ML20099M129 (← links)
- ML20099F042 (← links)
- ML20099E681 (← links)
- ML20099E051 (← links)
- ML20099E041 (← links)
- ML20099B644 (← links)
- ML20097B155 (← links)
- ML20097B037 (← links)
- ML20096G018 (← links)
- ML20096F169 (← links)
- ML20095L385 (← links)
- ML20095L339 (← links)
- ML20095K887 (← links)
- ML20095K704 (← links)
- ML20095F602 (← links)
- ML20094Q812 (← links)
- ML20094P567 (← links)
- ML20094G186 (← links)
- ML20094D830 (← links)
- ML20094B289 (← links)
- ML20094A703 (← links)
- ML20093P177 (← links)
- ML20093K183 (← links)
- ML20093J002 (← links)
- ML20093H996 (← links)
- ML20093H892 (← links)
- ML20093G427 (← links)
- ML20093G109 (← links)
- ML20093F858 (← links)
- ML20093E641 (← links)
- ML20093A366 (← links)
- ML20093A006 (← links)
- ML20092L254 (← links)
- ML20092L249 (← links)
- ML20092D982 (← links)
- ML20090H059 (← links)
- ML20107K567 (← links)
- ML20107J287 (← links)
- ML20107D725 (← links)
- ML20106B569 (← links)
- ML20106B444 (← links)
- ML20117N396 (← links)
- ML20117C722 (← links)
- ML20116M001 (← links)
- ML20116J104 (← links)
- ML20116H680 (← links)
- ML20116H485 (← links)
- ML20116H477 (← links)
- ML20116H459 (← links)
- ML20116H263 (← links)
- ML20116B925 (← links)
- ML20115C594 (← links)
- ML20114B660 (← links)
- ML20114B647 (← links)
- ML20113B128 (← links)
- ML20112J392 (← links)
- ML20112J351 (← links)
- ML20112G534 (← links)
- ML20112G371 (← links)
- ML20112F536 (← links)
- ML20112C864 (← links)
- ML20112B682 (← links)
- ML20108D144 (← links)
- ML20107K881 (← links)
- ML20107K786 (← links)
- ML20072S005 (← links)
- ML20072P836 (← links)
- ML20072P809 (← links)
- ML20072N261 (← links)
- ML20072M986 (← links)
- ML20072M880 (← links)
- ML20072F309 (← links)
- ML20072A445 (← links)
- ML20072A319 (← links)
- ML20071P447 (← links)
- ML20071P062 (← links)
- ML20071N940 (← links)
- ML20071N060 (← links)
- ML20071M910 (← links)
- ML20071M867 (← links)
- ML20071M313 (← links)
- ML20071M206 (← links)
- ML20071K159 (← links)
- ML20071J229 (← links)
- ML20136D564 (← links)
- ML20127L848 (← links)
- ML20127H520 (← links)
- ML20149F603 (← links)
- ML20236E799 (← links)
- ML20216A960 (← links)
- U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 (← links)
- U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable (← links)
- U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts (← links)
- U-601443, Part 21 Rept Re Failure of Solenoid Operated Air Pilot Valves for Main Steam Sys Safety/Relief Valves to Meet Environ Qualification Requirements.Following Rev of Vendor Manual,Util Will Install Raychem Heat Shrink Sleeves (← links)
- U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable (← links)
- U-601463, Part 21 Rept Re Incorrectly Sized Stem Nut for Actuator of Anchor/Darling Gate Valve.Initially Reported on 890609.Stem Nut for Valve 1E22-FO15 Replaced (← links)
- U-601030, Part 21 Rept Re HPCS (Div III) Diesel Generator Exciter Leads Built by Beloit Power Sys & Supplied by Ge.Initially Reported on 870729.Temporary Repair Completed on 870813. Detailed Repair Plan Being Developed by GE (← links)
- U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals (← links)
- U-601078, Advises That Part 21 Defect 21-87-03 Re Damaged High Pressure Core Spray Diesel Generator Exciter Leads Will Be Replaced During Dec 1987 Instead of During Fall Maint Outage Due to Schedule Constraints (← links)
- U-601100, Amended Part 21 Rept Re Addl Damage to Div III Diesel Generator Discovered During Implementation of Corrective Actions.Initial Damage Reported on 870729.Reworking of Diesel Generator Complete.Damaged Exciter Leads Replaced (← links)
- U-602823, Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes (← links)
- U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue (← links)
- U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 (← links)
- U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable (← links)
- U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 (← links)
- U-600721, Interim Deficiency Rept 55-86-06 Re Watertight Seals & Openings in Vital Area Boundaries.Initially Reported on 860828.Screenhouse Walked Down to Identify Floodproofing Deficiencies.Final Rept Due Prior to Initial Criticality (← links)
- U-600724, Potentially Reportable Interim Deficiency Rept 55-86-08 Re Improper Installation of Raychem Insulation on Splices in Class 1E Circuits.Initially Reported on 860902.Splice Installations Will Be Inspected & Reworked (← links)
- U-600778, Final Deficiency Rept 55-86-08 Re Improper Installation of Raychem Insulation on Splices in Class 1E Circuits.Initially Reported on 860902.Defective Splices Reworked & Repaired (← links)
- U-600765, Final Deficiency Rept 55-86-06 Re Openings in Vital Area Boundaries That Exceeded Personnel Access Criteria.Initially Reported on 860828.Plant Mod A-047 Issued to Resolve All Vital Area Boundary Deficiencies (← links)
- U-600767, Final Deficiency Rept 55-86-07 Re Broken Tack Welds on Valves 1G33-F042A & 1G33-F042B.Initially Reported on 860828. Caused by Valve Throttling Between 0-20% of Open Position. Valves Will Be Designed for Extreme Throttling Applications (← links)
- U-600653, Part 21 Rept 21-86-03 Re Bbc Brown Boveri K600/K800 Circuit Breakers That May Have Cut Harness Wires Caused by Contact W/Racking Gear Inside Breakers.Evaluation Continuing (← links)
- U-600686, Deficiency Rept 55-86-05 Re Unsealed Gaps in 3-h Rated Fire Wall.Initially Reported on 860717.Investigation Continuing. Addl Fire Watches Established.Final Rept Will Be Submitted in Approx 30 Days (← links)
- U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 (← links)
- U-600750, Final Deficiency Rept 55-86-05 Re Unsealed Gaps in 3 H Rated Fire Wall.Initially Reported on 860717.Maint Standing Orders 23 & 25 Issued to Identify Mechanism for Proper Control of Fire Seals & to Eliminate Future Seal Violations (← links)
- U-600824, Amended Final Deficiency Rept 55-86-09 Re Broken Tack Welds Between Valve Disc & Disc Nut.Initially Reported on 860828. Caused by Vibration Created by Extreme Throttling.Valves Will Be Replaced W/Valves Designed for Extreme Throttling (← links)
- U-600722, Interim Deficiency Rept 55-86-07 Re Broken Tack Welds on Valves 1G33F042A & B.Initially Reported on 860828.Anchor/ Darling Valves Found to Fail from Vibration Caused by Extreme Throttling Conditions.Investigation Continuing (← links)
- U-600480, Amend to Final Deficiency Rept 55-82-09 Re Small Bore/ Instrumentation Piping & Conduit Support Design Calculations.Reviews of Conduit Support Calculations Reduced to 20 Calculations Per Quarter (← links)
- U-600825, Amended Final Deficiency Rept 55-86-06 Re Watertight Seals & Openings in Vital Area Boundaries.Initially Reported on 860828.Deficiencies Identified During Verification Activities Corrected (← links)
- U-600829, Final Deficiency Rept 55-86-10 Re Plant Mods Performed W/O Adequate Specification of Required Testing & Test Acceptance Criteria.Initially Reported on 860919.Revised Mod Process to Incorporate in-line QA Review Initiated (← links)
- U-600701, Interim Deficiency Rept 55-86-04 Re Mod of Limiter Plates on Limitorque Valve Operators.Review of Deficiencies Re motor- Operated Valves Continuing.Addl 15 Days Required Prior to Submittal of Final Rept (← links)
- U-600651, Final Deficiency Rept 55-86-02 Re Electrical Lugs Installed on Vendor Leads of Limitorque Operators.Initially Reported on 860508.Affected safety-related motor-operated Valves Verified Acceptable or Reworked Using Listed Methods (← links)
- U-600642, Final Deficiency Rept 55-86-03 Re Fire Pumps OFP01PA & OFP01PB Not Meeting Requirements of Spec K-2830.Initially Reported on 860613.Condition Investigated & Found Not Reportable Under 10CFR50.55(e) (← links)
- U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 (← links)
- U-600608, Potentially Reportable Deficiency 55-86-02 Interim Rept Re Electrical Lugs Installed on Vendor Leads of Limitorque Operators.Initially Reported on 860508.Leads W/Unacceptable Size Lugs Will Be Reworked (← links)
- U-600594, Amended Final Deficiency Rept 55-80-10 Re Welding of Temporary & Permanent Nonsafety Attachments to safety-related Structures & Components.Internal Repts, Documenting Investigation Provided to Region III (← links)
- U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue (← links)
- U-600685, Interim Deficiency Rept 55-86-04 Re safety-related Limitorque Valve Sys Operators That Could Not Achieve Required Thrust as Recommended by Mfg.Initially Reported on 860715.Investigation Continuing (← links)
- U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 (← links)
- U-602932, Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment (← links)
- U-602876, Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 980129 (← links)
- U-602925, Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor (← links)
- U-602920, Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 980217 (← links)
- U-600590, Part 21 & Deficiency Rept 21-85-18 Re Anchor/Darling,Velan, Atwood-Morill & Walworth Valve Cos 410 Stainless Steel Valve Stem Corrosion Failures.Valves Tested for Stem Hardness & Cracks & Hard Stems Replaced (← links)
- U-602910, Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution (← links)
- U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components (← links)
- U-602894, Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept (← links)
- U-600733, Interim Deficiency Rept 55-86-10 Re Plant Mods Performed W/O Adequate Spec & Required Testing & Test Criteria. Initially Reported on 860919.Mods Affecting Structures,Sys or Components Reviewed (← links)
- U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor (← links)
- U-601113, Part 21 Rept Re Beloit Power Sys HPCS Div III Diesel Generator Rear Bearing & Rotor Shaft Damage.Shaft Repaired & Bearings Replaced (← links)
- U-600524, Part 21 Rept 21-86-02 Re Bbc Brown Boveri,Inc Eight Pole K-1600 or K-2000 Auxiliary Switch Control Wire Insulation. Insulation May Be Cut by Top Edge of Dust Shield When Circuit Breaker Racked Out to Full Disconnect Position (← links)
- U-600465, Part 21 Rept (21-85-06) Re Potential Failure of Sway Strut & Snubber Pipe Clamps Supplied by Basic Engineers.Caused by Loose Clamp Bolts.Revised Clamp Load Capacity Data Sheets & Installation Instructions Encl (← links)
- U-600520, Part 21 Rept Re Missing Lock Welds on Anchor/Darling Check Valve Hinge Pin Setscrews,Per 860117 Agreement.Evaluation Being Performed & Appropriate Corrective Action Will Be Taken.Anchor/Darling Valve Co Notified (← links)
- U-600466, Part 21 Rept (21-83-05) Re Possible Failure of Baldwin Assoc Welds DV-10 & DV-15 During Seismic Event.Initially Reported on 860214.Failure Could Cause Cable Tray Hangers to Collapse Resulting in Damage to Safety & Nonsafety Cables (← links)
- U-600422, Interim Deficiency Rept 55-85-15 Re Classification of Instrument Lines Connected to Rcpb.Initially Reported on 851227.Sargent & Lundy Performing Evaluation.Final Rept Expected within 30 Days (← links)
- U-600427, Final Deficiency Rept 55-85-14 Re Torquing of Cover Plate Screws on Namco EA170 & EA180 Limit Switches.Initially Reported on 851227.Field Engineering Change Notices 13714 & 13715 Issued to Provide Addl Engineering Instructions (← links)
- U-600462, Final Deficiency Rept 55-85-15 Re Classification of Instrument Lines Connected to Rcpb.Initially Reported on 851227.Review Determined That Deficiency Not Reportable Per 10CFR50.55(e) (← links)
- U-600449, Part 21 Rept (21-85-05) Re Loose Stem Clamp Collars on Anchor/Darling motor-operated Valve Stems.Failure Caused by Faulty Set Screws on Stem Clamp Collar.Util Will Restake & Test 36 Set Screws Listed on Encl by 860330 (← links)
- U-600391, Final Potential Deficiency Rept 55-85-13 Re Use of Unqualified Model HX4 Daniel Crimping Tools for Class 1E/safety-related Applications.Initially Reported on 851120. Issue Not Reportable Per 10CFR50.55(e) (← links)
- U-600415, Part 21 Rept Re Adjustment of Low Voltage Shut Off & Turn on for GE Dedicated Topaz Class 1E Inverters.Rev 3 to Drawing 184C4723 Issued to Correct Trip Voltages.Item Inapplicable to Facility (← links)
- U-602704, Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys (← links)
- U-600357, Final Deficiency Rept 55-85-09 Re Inadequate Implementation of Design Change Documents by Baldwin Assoc & Improper Use of Field Interference Notice by Zack Co.Initially Reported on 850816.Condition Not Reportable Under 10CFR50.55(e) (← links)
- U-600301, Final Deficiency Rept 55-85-06 Re Wiring & Workmanship Defects in safety-related Electrical Panels.Initially Reported on 850626.Panels Reworked & Engineering Drawings Corrected (← links)
- U-600074, Amended Final Deficiency Rept 55-83-06 Re Inadequate Vendor Shop Welding on Rockwell Engineering Structural Steel Members.Initially Reported on 830427.Condition Not Reportable Per 10CFR50.55(e) (← links)
- U-600352, Part 21 & Deficiency Rept (21-85-15) Re Bar Stock Matl Heat Code 3876 Used by Yarway Corp to Mfg Valve Stems for 1/2 & 3/4 Inch Welbond Valves.Evaluation Being Conducted (← links)
- U-600349, Final Deficiency Rept 55-85-07 Re Omission of Lateral Supports on American Sprinkler Co Fire Protection Sys in Seismic Category I Bldgs.Initially Reported on 850813. Installation of Addl Supports Will Be Completed by 851215 (← links)
- U-600269, Final Potential Deficiency Rept 55-85-05 Re Inadequate Design Change Control by Zack Co.Initially Reported 850807. Field Const Procedure 3.0 Addressing Retroactive Design Changes Revised.Issue Not Acceptable Per 10CFR50.55(e) (← links)
- U-600426, Final Deficiency Rept 55-85-10 Re Broken Neck Seals & Hollow Screws on Installed Rosemount Transmitters.Initially Reported on 851120.Electric Conductor Seal Assemblies Inspected & Work Requests Submitted (← links)
- U-600230, Potential Part 21 Rept (21-85-11) Re Quality Deviation in Component of Technology for Energy Corp Model 914-1 Flow Monitor Modules Which Could Result in Failure of Indicator to Reset.Corrective Action Under Evaluation (← links)
- U-600387, Interim Deficiency Rept 55-85-10 Re Broken Rosemount Transmitter Neck Seals & Possible Damaged Hollow Screws on Installed Transmitters.Initially Reported on 851120. Investigation Will Be Completed in 30 Days (← links)
- U-600315, Deficiency Rept 55-85-07 Re Seismic Design & Const of Automatic Sprinkler Co of America (Ascoa) Fire Protection Sys.Meeting Held on 850923.Approx 30 Addl Days Needed to Provide Final Rept (← links)
- U-600259, Part 21 & Interim Potentially Reportable Deficiency Rept 55-85-07 Re Seismic Design & Const of Automatic Sprinkler Corp of America,Inc Fire Protection Sys.Initially Reported on 850813.Investigation Continuing (← links)
- U-600212, Final Part 21 & Deficiency Rept 55-84-23 Re Ruskin Interlocking Blade Fire Dampers.Initially Reported on 841203.Ruskin Test Rept Evaluated.Installation of Heat Detectors & Larger Springs to Be Completed by 851112 (← links)
- U-600148, Part 21 Rept Re Observation Rept 51 Concerning Installation of Gap for Battery Cells.Sargent & Lundy Calculation Adequately Addresses Safety Significance of Rept 51.Item Not Reportable Per 10CFR21 (← links)
- U-600240, Interim Potential Deficiency Rept 55-85-05 Re Inadequate Design Change Control by Zack Co.Sargent & Lundy,Inc Requires Addl Time to Perform Safety Significance Evaluation.Final Rept Will Be Submitted in Approx 30 Days (← links)
- U-600239, Interim Potential Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl.Interim Repts Submitted on 850401 & 0703.Safety Significance Evaluation Completed.Addl 30 Days Needed to Finalize Investigation & Submit Final Rept (← links)
- U-600209, Part 21 Rept (21-85-03) Re Failure of Actuator to Valve Stem Coupling During Testing of Hammel-Dahl 2500 Valve (GE PRC 89-14).Caused by Improper Test Startup.Evaluation Underway (← links)
- U-600208, Part 21 & Deficiency Rept (21-85-06) Re Potential Defect in Natl Valve & Mfg Co Sway Strut & Snubber Pipe Clamps. Evaluation Being Conducted (← links)
- U-600198, Final Deficiency Rept 55-85-04 Re Indeterminate Quality of Pipe Mounted Butterfly Dampers.Initially Reported on 850404. Procedure P.2 Will Note That Vendor Items Will Be Inspected Upon Receipt (← links)
- U-600260, Interim Potentially Reportable Deficiency Rept 55-85-09 Re Inadequate Implementation of Design Document Review Process. Initially Reported on 850816.Investigation Plan to Determine as-built Condition of Hardware Implemented (← links)
- U-600204, Interim Deficiency Rept 55-85-06 Re Internal Wiring & Workmanship Defects in vendor-supplied safety-related Electrical Equipment.Initially Reported on 850626.Next Rept Will Be Submitted within 90 Days (← links)
- U-600202, Final Potentially Reportable Deficiency Rept 55-84-01 Re Control of Field Design Changes.Initially Reported on 840111.Investigation Identified No Hardware Deficiencies. Issues Not Reportable Per 10CFR50.55(e) (← links)
- U-602677, Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker (← links)
- U-600192, Final Deficiency Rept 55-84-02 Re Matl Traceability. Initially Reported on 840111.Caused by Lack of Adherence to Procedures.Condition Not Reportable Under 10CFR50.55(e) (← links)
- U-600252, Final Deficiency Rept 55-84-18 Re Yield & Tensile Strength of ASTM-A-36 Plate Matl Less than Required by Matl Spec. Initially Reported on 840803.Item Not Reportable Per 10CFR50.55(e) (← links)
- U-600180, Interim Deficiency Rept 55-84-18 Re ASTM A-36 Plate Matl. Addl Info Re Safety Significance Identified.Approx 30 Addl Days Necessary to Complete Review & Provide Final Rept (← links)
- U-600222, Final Deficiency Rept 55-85-03 Re Firewalls Constructed w/8-inch Hollow Core Concrete Masonry Units That May Not Meet 3 H Fire Resistance Rating.Initially Reported on 850404.Item Not Reportable Per 10CFR50.55(e) (← links)
- U-600185, Interim Deficiency Rept 55-85-03 Re Firewall Structures Fabricated Using Unqualified Matl.Approx 30 Addl Days Necessary to Complete Testing of Concrete Masonry Units (← links)
- U-600186, Deficiency Rept 55-84-23 Re Ruskin Interlocking Blade Fire Dampers.Detailed Review of Results & Corrective Actions in Progress.Addl 30 Days Necessary to Complete Review & Provide Final Rept (← links)
- U-600150, Interim Deficiency Rept 55-85-05 Re Inadequate Design Change Control by Zack Co.Initially Reported on 850507.Sargent & Lundy Issued Procedural Revs.Approx 60 Days Required to Complete Investigation (← links)
- U-600146, Deficiency Rept 55-84-01 Re Design Change Control.Addl 30 Days Requested to Complete Review & Provide Interim or Final Rept (← links)
- U-602580, Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly (← links)
- U-602634, Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul (← links)
- U-602579, Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept (← links)
- U-102142, Interim Potential Deficiency Rept 55-84-12 Re Installation of Concrete Expansion Anchors in Floors W/Finishing Slabs. Initially Reported on 840604.Investigation Continuing.Next Rept Will Be Submitted within 90 Days (← links)
- U-602564, Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia (← links)
- U-101988, Interim Part 21 & Deficiency Rept Re ASTM A-36 Plate Matl. Initially Reported on 840803.Investigation Plan Implemented as Listed.Next Rept Will Be Provided in Approx 90 Days (← links)
- U-602532, Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers (← links)
- U-120203, Final Deficiency Rept 55-84-05 Re Incorrect Matl Substitutions of Large Bore Pipe.Initially Reported on 840127.Applicant Determined Substitution Issue Not Reportable Under 10CFR50.55(e) (← links)
- U-602502, Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker (← links)
- U-602497, Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity (← links)
- U-602466, Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 950927 (← links)
- U-101112, Interim Deficiency Rept 82-12 Re Binding of Sway Strut/ Snubber Piping Component Supports.Initially Reported on 821021.Defective Parts Tagged & Segregated to Prevent Inadvertent Use.Final Rept Will Be Submitted in 90 Days (← links)
- U-602305 (redirect page) (← links)
- JSP-552-93, Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced (← links)