ML19344B079

From kanterella
Jump to navigation Jump to search
Provides Addl Info to 800728 Deficiency Rept Re RHR Heat Exchanger Lateral Support Provisions.Design Change to Lateral Support Steel Attachments Completed.Undersize Embeds Not Changed
ML19344B079
Person / Time
Site: Clinton Constellation icon.png
Issue date: 08/15/1980
From: Koch L
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, L14-80(08-15)-9, U-0166, NUDOCS 8008250537
Download: ML19344B079 (2)


Text

'

y- . -'

U-0166 L14-80(08-15)-9 ILLING/S POWER COMPANY .m I E 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 August 15, 1980 Mr. James G. Keppler Director, Region III office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Clinton Power Station Unit 1 Docket 50-461 Construction Permit CPPR-137 This letter amplifies Illinois Power Company's letter of July 28, 1980, which reported a deficiency under the provisions of 10CFR50.55 (e), concerning RHR heat exchanger lateral support provisions. .

The statement in paragraph two of the Corrective Action section, " Subsequently, the repairs were made,", was misleading and requires amplification to fully and accurately explain the actions that were taken, The engineering solution selected to correct this non-con-forming condition involved redesign of the lateral support steel connection details, It did not req.uire change of the embeds which were undersize. Therefore, the " repair d of the undersize embeds consisted of a design change to'the support steel. At the time of the July 28, 1980 report, the design change of the attachments had been made, and the " repair" of the undersize embeds was c;mplete.

However, it would have been more correct to have stated " Subsequently,

! redesign of the attachments was completed."

The action to correct the reported undersize embeds will con-form to the revised design of the lateral support system for the RUR heat exchangers. The undersize embeds will not be changed, i

l

)3"'f S<o L 8008250 _

6%7

1 U-0166 c4 -

- L14-8 0 (08-15) -9 James G. Keppler August 15, 1980 We trust that this amplifying information is satisfactory and will permit completion of your analysis and evaluation of the deficiency and corrective action.

Sincerely, L . Koch Vice President cc: Director, Office of I&E, NRC, Wash 3ngton D.C.

H. H. Livermore, NRC Resident Inspector e