Interim Deficiency Rept 81-04 Re Inconsistencies in Certification of HVAC Matls Supplied by Zack Co.Addl Rept Received from Zack Co Indicating Purchase Order Packages Still to Be Confirmed
ML20040G548
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 02/03/1982
From: Koch L
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 1605-L, 1665-L, U-0413, U-413, NUDOCS 8202160242
Download: ML20040G548 (1)


Text

1605-L

/LLINDIS POWER COMPANY y f3f_ (9,_93y_L 500 SOUTH 27TH STREET, DECATUR, ILLINolS 62525 February 3, 1982 i-Mr. James G. Keppler Director,-Region III e liS Office of Inspection and Enforcement p 9 .g US Nuclear Regulatory Commission f -

799 Roosevelt Road  %

Glen Ellyn, IL 60137  % k %, 9 2 e ,p V -

Dear Mr. Keppler:

c- /go

, 4  :;p,h ;g O Deficiency 81-04 W cf 10CFR50.55(e) g/ AfN[z'V' Certifications HVAC Materials On November 4, 1981, Illinois Power submitted an interim-report for a potential reportable deficiency'per 10CFR50.55(e) concerning inconsistencies in the certification for Clinton HVAC Materials supplied by Zack Company.

Our investigation of this matter is still'in progress, and this is to serve as an-interim report per 10CFR50.55(e)(3).

Since the_last interim report, we have received an additional report from Zack Co. which indicate's there are still a number of purchase order packages requiring substantiation and confirmation of correctness. It is anticipated that we will need approximately 90 days to complete our investigation of this potential deficiency and the determination of reportability.

-Sincerely, 0

L.J. Koch Vi e President GWB/clh(w/p) cc: H.H. Livermore, NRC Resident Inspector Director, Office..of I&E, USNRC Washington, DC 20013 Director - Quality Assurance 8202160242 820203 PDR ADOCK 05000461 FEB <d M C