Interim Deficiency Rept 55-85-15 Re Classification of Instrument Lines Connected to Rcpb.Initially Reported on 851227.Sargent & Lundy Performing Evaluation.Final Rept Expected within 30 Days
ML20151U043
Person / Time
Site: Clinton Constellation icon.png
Issue date: 01/25/1986
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
55-85-15, U-600422, NUDOCS 8602100449
Download: ML20151U043 (3)


Text

v- ;w i; ;s * :

-.: }/)$

U- 600422

~ L14-86 ( 01-25 )-L _

IA.120 NLLINOl8' POWER COMPANY

^

CLINTON POWER STATION, P.O. BOK 678. CLINTON. ILLINOIS 61727 .

~

Docket No. 50-461-Mr.! James':G. Keppler Regional' Administrator-Region III U.S.: Nuclear Regulatory Commission

799 Roosevelt Road
Glen Ellyn, Illinois 60137

. Subj ect : Potentially Reportable 10CFR50.55(e)

Deficiency 55-85-15: Classification of Instrument Lines Connected to the ,

Reactor Coolant Pressure Boundary De'ar Mr. Keppler:

On December 27, 1985, Illinois Power Company (IP)-

notified Mr. Guldenmond, NRC Region III (Ref: _IP Record'of.

Coordination.Y-32700 dated December-27, 1985) of a

-potentially reportable deficiency _under~the provisions.of

.10CFR50.55(e):concerning the_ instrument-lines connected to the reactor coolant pressure boundary that are ASME Class 3 instead.of ASME~ Class 2 as= required by the Final Safety.

Analysis Report (FSAR). Our investigation of.this issue is-continuing. This letter represents an' interim report in accordance with the" requirements of110CFR50.55(e).

~ Attachment A:provides the-details'of our investigation to date.

'We-: trust that this. interim. report provides you sufficient. background information to perform a general .

assessment of'this potentially reportable' deficiency and adequately describes our overall approach to resolve ~tiis

-issue.

Sincerel yours, 1

.- . Hall Vice President RLC/ckc Attachment-cc: NRC Resident Office

~ Director, Office of I&E, US NRC, Washington, DC 20555 Illinois Department of Nuclear Safety INPO Records Center l

8602100449 e60123 5" JAN 2 8.1986 #

'PDR ADOCK 05000461 1

-- S PDR 2 ,

w l__ - - _ _ - - -_ - _ - - _ _'_ - _ _ __ _ - k_ A

e a v .

Ll4-86( 01-25 )-L -

1A.120 ATTACHMENT A3 Illinois' Power Company Clinton Power Station Docket No. 50-461

Potentially Reportable 10CFR50.55(e) Deficiency 55-85-15 cClassification of Instrument. Lines Connected-to the~ Reactor Coolant Pressure Boundary Interim Report Statement of Reportable Deficiency / Background

' Illinois Power. Company Nuclear Station Engineering Department--(NSED): identified a deficiency with the design

classification'of instrument.. lines connected to the reactor coolant-pressure boundary.- The instrument' lines are

-classified as ASME Class 3.instead of ASME Class 2 as required by-the Final: Safety Analysis Report (FSAR).

Investigation Results/ Corrective Action IllinoisLPower (IP) prepared,and implemented an.

.itwestigation plan to determina .tha axtent ef ' thic preblem at-the.Clinton Power Station (CPS). 13ue results' of our

~ investigation to date are discussed below.-

A review'was performed by-NSED and Illinois. Power

_ Quality Assurance (IPQA)--to determine the differences in

. requirements regarding the two ASME Classes. The results of this review determined that nondestructive examinations l(NDE) would~havesto be performed on the instrument line-

? welds'in order'to upgrade these lines-to ASME Class.2..

A review was performed of the line lists, P& ids, and

. isometric drawings-to. identify'the. instrument lines.which

'had been incorrectly. classified. As a result of this review.

2,702 instrument line welds were identified which. require

' nondestructive examination for upgrading to ASME Class 2.

The NDE is currently being performed and identified

-deficiencies-are being documented on nonconformance reports

.(NCRs) for resolution in accordance with approved site procedures.

Sargent & Lundy (S&L) has reviewed the design requirements and issued necessary design documentation that provides for upgrading of the instrument lines to ASME Class 2.

Page 1 of 2

1 U 600422 :

L14-86( 01-25 )-L 1A.120 ATTACHMENT A (continued)

Root Cause-A review and evaluation is being performed by S&L of the design activity associated with classification of instrument lines. Following completion of S&L's review and evaluation, a determination will be made concerning the root cause_and_ required. corrective action needed to preclude recurrence.

Safety Implications / Significance Illinois Power's investigation of this matter is continuing. The safety implications and significance will be addressed after further background information and NDE

r'esults have been obtained'and evaluated. It is_ anticipated that approximately thirty (30) days will ie required to complete our investigation, determine reportability and submit a final report on the matter.