1605-L ILLIN0/S POWER COMPANY ffy y.1gys9 CLINTON POWER STATION, P.O. BOX 678. CLINTON. ILLINOIS 61727 June 21, 1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Potential 10CFR50.55(e) Deficiency 55-84-02:

Material Traceability

Dear Mr. Keppler:

In Illinois Power Company letter dated February 14, 1984 (Ref:

Letter D. P. Hall to J. G. Keppler, U-10124), your office was provided an interim report addressing the status of tha subject 10CFR50.55(e) investigation.

It was anticipated at the time that an interim report would be provided in approximately ninoty (90) days.

Illinois Power Company is presently involved in evaluating the need to expand its investigation associated with the Material Traceability issue.

It is anticipated that approximately thirty (30) additional days will be necessary to complete our evaluation and provide an interim report on the issue.

If you have any questions or comments regarding the status of actions taken on this issue, please contact Illinois Power Company.

Sincerely yours, 8406290298 e40621 DR ADOCK 05000461 D.

P. Hall 3

PDR Vice President RLC/cbs cc:

NRC Resident Office Director - Office of I&E, US NRC, Washington, DC 20555 Illinois Department of Nuclear Safety INPO Records Center j@ 25 MN