1605-L U
ILLIN0/S POWER COMPANY
. f 73 73 (94_33y_7 500 SOUTH 27TH STREET, DECATUR, ILUNOiS 62525 i
l April 13, 1982 1
m O
Mr. James G. Keppler 9
Director, Region III
.9 RECEIVED Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission APR 2619825 C 199 Roosevelt Road V-na m ugam, %
~
Glen Ellyn, Illinois 60137
"*8,**mec a 11
Dear Mr. Keppler:
4 4
Deficiency 80-02 i
10 CFR 50.55(e)
S&L Soil Characteristics error in the Clinton Power Station design The purpose of this letter is to update you on the status of the potential reportable deficiency concerning the S&L soil characteristics error in the Clinton Power Station design.
The analytical work by the architect engineer and the NSSS supplier has been completed.
The final determina-tion of reportability will be determined after receipt of the report and a complete review has been completed.
We anticipate that an additional 90 days will be required to perform the review and make final determination of reportabi-lity.
If you have any further questions concerning this matter, please do not hesitate to bring them to my attention.
Y d
W.C. Gerstner Executive Vice President GWB/prh/wp cc:
H. Livermore, URC Resident Inspector Director, Office of I&E, URC, Washington, D.C.
Director-Quality Assurance 8204270 504 APR 2 21982 9