ML20071K159

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re S&L Soil Characteristics Error in Station Design.Ae & NSSS Supplier Analytical Work Completed. Final Determination Re Reportability Should Be Available in 90 Days
ML20071K159
Person / Time
Site: Clinton  
Issue date: 04/13/1982
From: Gerstner W
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, U-0460, U-460, NUDOCS 8204270504
Download: ML20071K159 (1)


Text

1605-L U

ILLIN0/S POWER COMPANY

. f 73 73 (94_33y_7 500 SOUTH 27TH STREET, DECATUR, ILUNOiS 62525 i

l April 13, 1982 1

m O

Mr. James G. Keppler 9

Director, Region III

.9 RECEIVED Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission APR 2619825 C 199 Roosevelt Road V-na m ugam, %

~

Glen Ellyn, Illinois 60137

"*8,**mec a 11

Dear Mr. Keppler:

4 4

Deficiency 80-02 i

10 CFR 50.55(e)

S&L Soil Characteristics error in the Clinton Power Station design The purpose of this letter is to update you on the status of the potential reportable deficiency concerning the S&L soil characteristics error in the Clinton Power Station design.

The analytical work by the architect engineer and the NSSS supplier has been completed.

The final determina-tion of reportability will be determined after receipt of the report and a complete review has been completed.

We anticipate that an additional 90 days will be required to perform the review and make final determination of reportabi-lity.

If you have any further questions concerning this matter, please do not hesitate to bring them to my attention.

Y d

W.C. Gerstner Executive Vice President GWB/prh/wp cc: