ML20004F716
| ML20004F716 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 06/12/1981 |
| From: | Koch L ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 114-81(06-12)-1, 1605-L, U-0246, U-246, NUDOCS 8106220220 | |
| Download: ML20004F716 (1) | |
Text
p--
l i
i.605-L
/LL/NOIS POWER COMPANY f
U{g_246 0
t gt(os.52)_t
[Lt 500 SOUTH 27TH STREET, DECATUR, ILUNOIS C2525 Jude 12, 1981 I
(b sfe(([j,y['R Mr. James G. Keppler JU.i.'] g IS8/ w ;
Director, Region III C
y Office of Inspection and Enforcement (Gm 4.g*%umpg U.S. Nuclear Regulatory Commission s/
779 Roosevelt Road Glen Ellyn, IL.60137 tfj/',
M u~
Dear Mr. Keppler:
Potential Deficiency 81-03 10 CFR 50.55(e)
%" S/S (.065" Wall) Pipe Illinois Power withdraws the subject potential deficiency reported to the Nuclear Regulatory Commission on May 6, 1981.
The basis for this action may be found in an internal report which may be reviewed by the NRC at Clinton.
If you have any questions regarding this letter, please feel free to contact Mr. A.J. Budnick, Director, Quality Assurance.
Sincerely, W
- .J.
Koch Vice President cc:
H.H. Livermore, NRC Resident Inspector Director, Office of I&E, USNRC, Washington, DC 20013 Director-Quality Assurance fSJf 31 0 8106 22 0 Q90