Text
.
),, [
c.
8/r1O L
1605-L
- /LLIN0/8 POWER COMPANY U-10183 CLINTON POWER STATION, P.O. BOX 678, CLINTON, ILLINOIS 61727 July 26, 1984
- Docket No. 50-461 Mr. James G. Keppler-Regional Administrator Region III U.S. Nuclear Regulatory Commission
'799 Roosevelt Road
" Glen Ellyn, IL 60137
~
~
Subject:
Potential 10CFR50.55(c) Deficiency 55-84-15:
Skewed Auxiliary Steel Connections b-
Dear Mr'. Keppler:
-On June 29, 1984, Illinois Pnwer Conpany notified Mr. F.
?Jablonski,ENRC. Region III,-(Ref:
IP Memorandum Y-20708 dated
' June 29, 1984) of a potentially reportable deficiency concerning theLfabrication and installation of skewed auxiliary steel connections without the required approved design details.
Our
- investigation of this issue is continuing, and this letter is submitted as an interim report in accordance with the requirements of 10CFR50.55(e) (3).
-Statement of Potentially Reportable Deficiency / Background The Clinton, Power Station (CPS) Constructor generated 13 LField Change Requests (FCRs) which indicate that 37 cable tray h_
~
- support and~221 conduit support hangers were installed in Seismic I areas utilizing skewed auxiliary steel connections.
LCategory wed auxiliary steel connections were' fabricated and (These'see
-installed without approved design details.
The Constructor used La. standard ~90*,
double angle connection detail from Sargent &
Lundy (S&L) drawing E05-1912 as a guide in bending the clip angles tolthe angle required.co suit the configuration of the auxiliary steel in the field.
The final as-built skewed connection,:neither conforms to approved design details, nor to
-standard suggested skewed connection details of the AISC Manual.
Investigation Results/ Corrective Action Illinois Power has prepared and is implementing an
- investigation plan.to determine the extent of this problem at L CPS. - The investigation plan includes
1.
A~ review will be performed to identify all conduit and cable
- tray supports, utilizing skewed auxiliary steel connections that were installed-without approved design details.
9 D
i 8408080540 840726 bfL t
,t PDR ADOCK 05000461 gg(0i S-PDR
C
~
I6T' *
~
}]
- Mr.iJcmes1G. Keppler
. Page 2 July 26, 1984 m
+
w
' 2 ~. ;
- Nonconformance. Reports-(NCRs) will be generated to document da Ethose nonconforming or. indeterminate connections identified 1
lbyLitem #1.
These NCRs will be resolved:in accordance with
=
- approved. site. procedures.
1' 13.
(S&Lwillianalyze'andevaluateeachas-builtconnection, f
. identified'in item fl, for adequacy.to carry design loads.
~
J4..
- Baldwin Associates Quality Assurance Group will evaluate "thisipotential problem with respect to similar skewed connections which may have been installed by other l
disciplines.
1
. Corrective action taken on this issue to date includes the tissuing of Field Engineering Change Notice l(FECN) No. 4986 covering generic skewed.connectionLdetails.that will be. utilized 2
>for;all future installations of cable tray supports.
S&L-is also f
(preparing another generic 1FECN covering skewed connection details
.for. future installation-of. conduit-supports.
u xu
? Safety Implica'tions/ Significance Illinois-Power Company's-investigation of this potentially
" reportable deficiency is continuing.
The safety implications and
~ -
- significance.of the' issue.will be assessed after further ibackground;information.is: evaluated._ It is anticipated that
- tapproximatelyfninety;(90) days'will be necessary toicomplete our w-
. 1 investigation and to file a final' report on the matter.
MWe trust ~that thisLinterim' report _provides you sufficient
. background information.to perform-a general assessment of this potentially'. reportable deficiency and~ adequately describes our overall'approachcto resolve the problem.
Sincerely yours, x
~
P. Hall Vice President f'
!.RLC/cah-Lc'c: ~ NRC; Resident Office-
. Director, Office ofDI&E,-US NRC, Washington, DC 20555 Illinois Department of. Nuclear Safety
.INPO Records Center.