ML19341B798
| ML19341B798 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 02/20/1981 |
| From: | Koch L ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 1605, 81-01, 81-1, U-0218, U-218, NUDOCS 8102270613 | |
| Download: ML19341B798 (1) | |
Text
.
{r,\\
/ n ' )l 3 '
'. G 1605
_-,. U-0218 ILLINOIS POWER COMPANY
.Ll4-81(02-20)-L 500 SOUTH 27TH $TREET, DECATUR, ILUNolS 62525
~~
February 20, 1981 Mr. James G. Keppler Dir ector, Region III Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Dear Mr. Keppler:
Potential Deficiency 81-01 10 CFR 50.55(e)
Preheat Control-for M.F. Closure Scools Illinois Power withdraws the subject potential deficiency reported _ to the Nuclear Regulatory Commission on December 31, 1980.
The -basis for this action may be found in an internal report which may be~ reviewed by the NRC at Clinton.
If you have any questions regarding this letter, please feel free to contact Mr. A. J. Budnick, Director - Quality Assurance.
Sincerely, sV L.
J. Kcch Vice President rij cc:
H. H. Livermore, NRC Resident Inspector Director, Office of I&E, USNRC, Washington, DC 20013-Di cor - Quality Ass.1rance y
5
/ O t
810227046
--