ML20009C584
| ML20009C584 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 07/09/1981 |
| From: | Koch L ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, L14-81(07-09)-L, L14-81(7-9)-L, U-0254, U-254, NUDOCS 8107210245 | |
| Download: ML20009C584 (1) | |
Text
-
'/h0fg -
1605-L lLLINDIS POWER COMPANY f1
~~
(07-09)-L i_ 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 July 9, 1981 St/
Mr. James G. Keppler
/
/c
[ yC Director Region III N
Office of Inspection and Enforcement
!67 U.S. Regulatory Commission fy ( O
[
799 Roosevelt Road i
y ',
- /
Glen Ellyn, Illinois 60137
<[/
Dear Mr. Keppler,
b/>x E s/ /ggg Deficiency 80-09
~~
Inadequate Construction Controls Concerning Electrical Raceway Hanger Installation Please reference my letter U-0231, Ll4-81(05-06)-L dated May 6, 1981 concerning progress in corrective action associated with the electrical hanger installation at Clinton Power Station.
Since my last letter, we have issued aad implemented procedures for the drafting and review of as-built drawings, defined the construction to ensure that travelers are developed for each hanger, and ensured that changes are made to travelers only after an engineering approval.
In addition, we are continuing the l
development and implementation of the computer tracking system which will ensure that affecting documents (i.e., ECN's, FCR's, etc.) are listed and incorporated as applicable.
We expect to submit a final report on this matter by the end of August 1981.
Sincerely, g")
-,/
.s
).*j L.J.'Ko'ch '
/O l
Vice President GWB/prh cc:
H.H. Livermore, NRC Resident Inspector Director, Office of I&E, USNRC, Washington, DC 20013
-Director-Quality Assurance i
n 13 WN 8107210245 810709 PDR ADOCK 05000461 S
._.