Interim Deficiency Rept 81-04 Re Inconsistencies in Certification for HVAC Matls,Initially Reported 811002.Zack Co Attempting to Resolve Deficiencies in 53 Matl Certification Packages & Will Submit Final Rept by 820521
ML20052E810
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 05/03/1982
From: Gerstner W
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 1605-L, U-0474, U-474, NUDOCS 8205110445
Download: ML20052E810 (2)


Text

-

U-0474 1605-L L14-82(05-03)-L

/LLINDIS POWER COMPANY ffy gyg CLINTON POWER STATION, P.O. BOX 3FK CLINTON, ILLINOIS 61727 NI May 3, 1982 n -06v

@ lq Mr. James C. Keppler

'[,)g 4 Director,. Region III D

Office of Inspection and Enforcement

'I '[#g'h d

$d-U.S. Nuclear Regulatory Commission L

799 Roosevelt Road

.?

c 7

c Glen Ellyn, Illinois 60137 g

j;]p 9

Dear Mr. Keppler:

(

Deficiency 81-04 10 CFR 50.55(e)

Certifications HVAC Materials On October 2, 1981, Illinois Power verbally notified Mr. H.M. Wescott, NRC Region III, of a potential reportable deficiency per 10 CFR 50.55(e) concerning inconsistencies in the certification for Clinton Project HVAC Materials (ZACK).

On February 3, 1982, Illinois Power submitted an interim report (ref: IP letter, U-0413 dated February 3, 1982) wherein Illinois Power requested an additional 90 days to complete our investigation of this potential deficiency.

Our investigation of this matter is still in progress, and this serves as an interim report per 10 CFR 50.55(e)(3).

Zack Company has been providing Baldwin Associates / Illinois Power periodic reports of the status of their efforts in resolving this matter.

As of April 29, 1982, a total of three hundred ninety-eight (398) Material Certification packages applicable to the Clinton Project have been reviewed for acceptability, of which fifty-three (53) presently contain discrepancies.

Zack is methodically attempting to resolve these discrepancies and is preparing a final report on this matter for submittal to

[

i Baldwin Associates / Illinois Power on or before May 21, 1982.

Upon receipt of this report, an evaluation will be made of any nonconforming conditions identified, and a detailed analysis of safety implications will be accomplished.

We hope this letter provides you sufficient information I

to give an overall status of this potential reportable deficiency.

8205110445 820503 PDR ADOCK 05000461 S

PDR L

Z~55'h

Mr. J.C. Keppler:

May-3, 1982 NRC Page 2 We' expect to complete our evaluation and investigation within ninety (90) days and will advise you of the.results.

Very truly yours, O

v/-

W.C. Gerstner Executive Vice President cc:

H.H. Livermore, NRC Resident Inspector Director, Cffice of I&E, US NRC, Washington, DC 20013 Illinois Department of Nuclear Safety Director-Quality Assurance b