U-600146, Deficiency Rept 55-84-01 Re Design Change Control.Addl 30 Days Requested to Complete Review & Provide Interim or Final Rept

From kanterella
Jump to navigation Jump to search
Deficiency Rept 55-84-01 Re Design Change Control.Addl 30 Days Requested to Complete Review & Provide Interim or Final Rept
ML20126B134
Person / Time
Site: Clinton Constellation icon.png
Issue date: 06/03/1985
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
55-84-01, 55-84-1, U-600146, NUDOCS 8506140008
Download: ML20126B134 (1)


Text

_ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _

U-600146 OM L14-85(06-03)-L 1A.120 ILLIN018 POWER COMPANY CLINTON PCWER STATION. P.O. 80X 678. CLINTON. ILLINOIS 61727 June 3, 1985 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 61037

Subject:

Potential 10CFR50.55(e) Deficiency 55-84-01 Design Change Control (NCRs/FCRs)

Dear Mr. Keppler:

In Illinois Power Company letter, date March 21, 1985 (Reft Letter D. P. Hall to J. G. Keppler, U-10257), your office was provided an interim report addressing the status of the subject 10CFR50.55(e) inves ti gation. It was anticipated at the time that a final report would be provided in approximately 45 days.

Illinois Power Com)any has identified additional information which is pertinent to tie safety significance evaluation of this issue. It is anticipated that approximately thirty (30) additional days will be necessary to complete our review and evaluation of this information and provide an interim or final report, depending on the reaults of our evaluation.

If you have any questions or comments regarding the status of actions taken on this issue, please contact Illinois Power Company.

S r- yours,

. . Hall Vice President RLC/ lab

, cci NRC Resident Offico .

Director - Office of I&E, USNRC, Washington, DC 20555 Illinois Department of Nucioar Safety INP0 Records Center JUN 6 085 L