Category:DEFICIENCY REPORTS (PER 10CFR50.55E & PART 21)
MONTHYEARML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals ML20236E7991998-05-26026 May 1998 Final Part 21 Rept Re W Dhp Circuit Breaker Auxillary Switch Operating Assembly Anomalies.Caused by Loss of Breaker Safety Function.Dhp Circuit Will Be Inspected ML20248F3531998-05-21021 May 1998 Part 21 Rept Re Electronic Equipment Repaired or Reworked by Integrated Resources,Inc from Approx 930101-980501.Caused by 1 Capacitor in Each Unit Being Installed W/Reverse Polarity. Policy of Second Checking All Capacitors Is Being Adopted U-603004, Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable1998-05-15015 May 1998 Part 21 Rept Re 980107 Determination That Itt Barton Model 580A Series Differential Pressure Indicating Switches Operating Forces Too Low.Manufacturing Sys Allowed Switches to Be Mixed.Evaluation Concludes Issue Not Reportable ML20216A9601998-05-0808 May 1998 Part 21 Rept Re Failure of 12 Volt DC Inverter Power Supply. Caused by Inadequately Sized Output Transistor Pair Combined W/Degraded Capacitors.Licensee Plans to Replace All Output Transistors & Degraded Capacitors U-602995, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts1998-05-0505 May 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps During Use of Portable Metal Analyzer.Util Identified Discrepancies Which Are Acceptable W/Some Exception of Some Replacement Parts U-602994, Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable1998-04-29029 April 1998 Part 21 Rept Re Final Rept 21-98-008,on 980113,reliance Electric Motors Supplied by Rockwell International for Hydrogen Recombiner Cooling Fans Do Not Have nameplate- Specified High Temperature Bearings.Fan Motors Acceptable U-602979, Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable1998-04-0707 April 1998 Final Part 21 Rept 21-97-059 Re Discrepancies Found During Receipt Insp of Three Refurbished safety-related W Dhp Circuit Breakers.Util Completed Evaluation,Per 10CFR21 & Concludes That Condition Is Not Reportable U-602968, Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue1998-03-24024 March 1998 Interim Part 21 Rept 21-97-055 Re Westinghouse Dhp Circuit Breaker Auxiliary Switch Operating Assembly Anomalies. Initially Reported on 980116.Util Currently Evaluating Suppliers Response to Questions Re Issue U-602960, Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 9804111998-03-12012 March 1998 Part 21 & Deficiency Rept Re Commerical Grade Dedication Program of Sentry Equipment Corp.Initially Reported on 980217.IP Performed an Addl Assessment at Sentry Facility on 980226.Next Rept Will Be Submitted by 980411 U-602954, Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 9805131998-03-0909 March 1998 Interim Part 21 rept,21-98-008 Re Identification That Bearings Installed in Hydrogen Recombiner B Cooling Fan Motor 0HG04CB Were Not Same as Bearings Specified on Motor Nameplate.Will Complete Evaluation of Issue by 980513 U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 9805301998-03-0606 March 1998 Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 U-602939, Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 9804041998-02-17017 February 1998 Part 21 Interim Rept 21-97-060 Re Sentry Equipment Corp Commercial Grade Dedication Program Deficiencies.Evaluation of Issue Will Be Completed by 980404 U-602932, Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment1998-02-13013 February 1998 Interim Part 21 Rept 21-97-059 Re Several Discrepancies Found During Receipt Insp of Three safety-related W Dhp Circuit Breakers.Sent Subject Circuit Breakers to Nuclear Logistics Inc for Refurbishment U-602925, Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor1998-02-0606 February 1998 Part 21 Rept 21-97-058 Re Oil Leaking Around Diaphragm of Replacement Pressure Reducing/Dump Valve Installed on Itt Barton Hydromotor Actuator.Caused by Poor Workmanship of Valve at Time of Manufacture.Valves Sent to Vendor U-602920, Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 9802171998-01-28028 January 1998 Part 21 Interim Rept 21-97-044/047/048 Re 970929 Failure of safety-related Battery Charger.Caused by Inadequate Soldered Wire Connections.Util Will Issue Rept of Issues IAW Provisions of 10CFR21 & 10CFR50.73 by 980217 U-602910, Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution1998-01-16016 January 1998 Part 21 Interim Rept 21-97-055,identified Adverse Trend in Auxiliary Switch Operating Assembly Anomalies in W Dhp Circuit Breakers on 971120.Condition Rept 1-97-11-388 Initiated to Track Investigation & Resolution U-602894, Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept1997-12-18018 December 1997 Final Part 21 Rept Re Discrepancies Between GE BWR Reactor Design Requirements Documents & Sys Vendor Manuals.Util Completed Evaluation & Concluded That Issue Is Not Reportable Per 10CFR21 as Reported in 971029 Rept U-602876, Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 9801291997-12-0303 December 1997 Interim Part 21 Rept Re 970929 Discovery of Deviations in safety-related Battery Chargers.Evaluation of Conditions Under Part 21 Continuing.Update on Resolution Progress Will Be Provided by 980129 U-602855, Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 9712181997-10-29029 October 1997 Part 21 Rept Re Discrepancies Between GE BWR Design Requirements Documents & Sys Vendor Manuals.Util Does Not Have Firm Date for Resolving Issue But Will Provide Update on Resolution Progress by 971218 U-602823, Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes1997-08-28028 August 1997 Part 21 Rept Re Improper Clearance for W Model 50DHP350 Circuit Breaker Arc Chute Rear Arc Horn.Caused by Installation of Arc Chute Having Potential to Cause Line Pole to Deflect.Replace Deficient Arc Chutes ML20149F6031997-07-18018 July 1997 Part 21 Rept Re R47 Incorrectly Installed on Electric Power Assembly.Recommends Evaluation of Timing Delay Requirements Applicable to Reactor Protective Sys ML20136D5641997-03-0707 March 1997 Part 21 Rept Re Transformer Not Being Stable in No Load Condition & Tripping When Lightly Loaded U-602704, Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys1997-02-27027 February 1997 Part 21 Rept Re Regulated Power Transformer 1AP75ERT Tripping Several Times.Caused by Addition of Step Load from Low or No Load Condition.Will Disconnect Four Potentially Affected Transformers from Div 2 Electrical Sys ML20133E8001997-01-0808 January 1997 Deficiency Rept Re Nonconformance Related to Masterflow 713 Grout,Which Master Builders,Inc Has Supplied as Nuclear SR Product to 18 Npps.Cause Unknown.Requests That Listed Info Be Provided to Gain Insight as to Scope & Possible Cause U-602677, Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker1996-12-20020 December 1996 Part 21 Rept Re Failure of Westinghouse Dhp Circuit Breaker to Close on Demand During Surveillance Test.Inspected, Cleaned,Adjusted & Lubricated Motor cut-off Switch & Spring Charge Indicator Mechanism in Subject Breaker U-602634, Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul1996-09-20020 September 1996 Part 21 Rept Re Failure of Itt Barton Hydramotor Actuator Pump to Develop Hydraulic Pressure During Testing.Initially Identified on 960306.Pump Withdrawn from Stores & Installed During Actuator Overhaul ML20116B9251996-07-25025 July 1996 Part 21 Rept Re Failure Analysis Concerning Pump Assembly NS109761EQX07 U-602580, Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly1996-05-0808 May 1996 Part 21 Rept Re Itt Barton Hydramotor Actuator Pump Assembly Failed to Develop Hydraulic Pressure During Testing.Caused by Pump Not Being Fitted Properly U-602579, Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept1996-05-0202 May 1996 Part 21 Rept Re Ideal Generators Installed W/Edgs Having Greater Generator Rotor Mass than Originally Calculated. Evaluated Impact of Issue of Generator Frequency & Torsional Vibration Prior to Interim Rept ML20108D1441996-05-0101 May 1996 Part 21 Rept Re Failure of Pump Assembly for Itt Barton Series NH95 Hydramotor Actuator.Did Not Develop Pressure Because Was Not Fitted Properly.Pump Assembly Has Been Returned to Itt Barton for Insp U-602564, Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia1996-03-13013 March 1996 Interim Part 21 Rept 21-96-001 Re Egds Rotor Mass Greater than Originally Calculated.Revised Calculation Shows Larger Rotor Mass & Rotational Inertia U-602532, Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers1995-12-20020 December 1995 Final Part 21 Rept 21-95-018 Re Failure of Power Shield Type SS-13 Solid State Trip Devices (Sstd) Mfg by Asea Brown Boveri,Ite,Gould & Brown Boveri.Util Inspected & Reworked,As needed,12 Type SS-13 Sstds in safety-related Breakers ML20094P5671995-11-20020 November 1995 Part 21 Rept Re ABB Power Shield Trip Units (Pstu),Type SS-13.On 951006,util Reported to NRC That Two Pstus,Type SS-13 Tripped VC & Vx Sys Circuit Breakers.Recommends Insp of Power Shield SS Trip Units Prior to Serial 80,000,in Svc U-602502, Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker1995-10-0606 October 1995 Interim Part 21 Rept 21-95-018 Re Failure of Solid State Trip Devices Type SS-13 Mfg by Gould/Ite (Now Abb,Asea Brown Boveri).Investigation Found Return Air Fan Circuit Breaker in Tripped Condition.Breaker Replaced W/Spare Breaker U-602497, Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity1995-09-26026 September 1995 Part 21 Rept Re Inverter Pwm Drive Logic Card Failure. Inverter Out of Svc to Replace Logic Card W/Revised Card in Accordance W/Scheduled Maint Activity U-602466, Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 9509271995-07-12012 July 1995 Follow-up to 10CFR21 Interim Rept 21-95-010 Re Elgar Inverter Pwm Drive Logic Card (J4) Failure.Elgar Performed Addl Testing of Cards at CPS & Developing Schedule for Evaluating Test Results.Update Will Be Provided by 950927 ML20084B0071995-05-22022 May 1995 Part 21 Rept Re Failure of Elgar Inverter Pwm Drive Logic Card on 950324.Cause of Failure Unknown.Subsequent Replacement Logic Card Identified as Deficient.Both Logic Cards Returned to Mfg for Analysis ML20072S0051994-08-18018 August 1994 Part 21 Rept Re Failure of Motor Operated Potentiometer Mfg by Basler Electric.Qualification Testing of Units Revised & Mkw Power Sys Will Perform Site Visit at Basler Electric to Verify Adequacy of Basler Electric C/A U-602305, Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay1994-06-27027 June 1994 Part 21 Rept Re Incorrect Size Telephone Coil Current Limiting Resistor in Westinghouse/Asea Brown Boveri CV-2 Voltage Relay U-602299, Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram1994-06-0606 June 1994 Part 21 Defect 21-94-010 Re Incorrect Internal Wiring of Basler Electric motor-operated Potentiometer (Mop) by Mkw Power Sys.Correct Wiring Scheme Determined & Mop Rewired in Accordance W/Vendor Wiring Diagram JSP-007-94, Part 21 Rept Defect 21-93-028 Re Failure of Instantaneous Trip Function on Ite Gould/Telemecanique Type He Molded Case Circuit Breaker.Deficient Breaker Placed on Hold Pending Disposition Through Plant Corrective Action Program1994-01-11011 January 1994 Part 21 Rept Defect 21-93-028 Re Failure of Instantaneous Trip Function on Ite Gould/Telemecanique Type He Molded Case Circuit Breaker.Deficient Breaker Placed on Hold Pending Disposition Through Plant Corrective Action Program JSP-006-94, Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition1994-01-0707 January 1994 Part 21 Rept Re Westinghouse 4160 Volt Alternating Current Breakers Incorrectly Configured & Poorly Constructed. Initially Reported on 931111.Affected Assemblies Placed on Hold Pending Disposition U-602227, Part 21 Rept 21-93-029 Re Potential for Motor Pinion Key Failure in Limitorque Actuators Due to Excessive Torque During Valve Backseating & Movats Testing.Initially Reported on 931210.Description of Actuator Should Be Model Sb..1993-12-22022 December 1993 Part 21 Rept 21-93-029 Re Potential for Motor Pinion Key Failure in Limitorque Actuators Due to Excessive Torque During Valve Backseating & Movats Testing.Initially Reported on 931210.Description of Actuator Should Be Model Sb.. JSP-552-93, Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced1993-12-10010 December 1993 Part 21 Defect 21-93-029:on 931007,discovered Broken Motor Shaft Pinion Key in Limitorque Actuator of motor-operated HPCS Sys Injection & Outboard Containment Isolation Valve 1E22-F004.Broken Motor Pinion Key Replaced 1999-09-22
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEAR05000461/LER-1999-010-01, Inoperability of Div 2 EDG Caused by Fuel Leaking Into Lube Oil, Cancelled1999-10-0707 October 1999 Inoperability of Div 2 EDG Caused by Fuel Leaking Into Lube Oil, Cancelled U-603277, Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Clinton Power Station,Unit 1.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers 05000461/LER-1998-020, :on 980609,inadequate Flow Balancing of Shutdown Water Sys Resulted in Less than Required Flow to Water Sys Loads.Caused by Inadequate Initial Design.New SX Min Flow Path for Div I & II SX Pumps Has Been Established1999-09-14014 September 1999
- on 980609,inadequate Flow Balancing of Shutdown Water Sys Resulted in Less than Required Flow to Water Sys Loads.Caused by Inadequate Initial Design.New SX Min Flow Path for Div I & II SX Pumps Has Been Established
05000461/LER-1996-010, :on 960906,plant Shutdown Occurred Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit.Procedures Will Be Revised, Failed Seal Will Be Replaced & Seal Design Will Be Improved1999-09-13013 September 1999
- on 960906,plant Shutdown Occurred Due to Unidentified RCS Leakage from Degraded Reactor Recirculation Pump Seal Greater than TS Limit.Procedures Will Be Revised, Failed Seal Will Be Replaced & Seal Design Will Be Improved
05000461/LER-1999-011, :on 990816,improper Restoration of a APRM Caused Monitor to Not Meet Seismic Qualification Requirements.Caused by Lack of Knowledge.Page Latches for Other APRMs Were Inspected & No Anomolies Were Found1999-09-10010 September 1999
- on 990816,improper Restoration of a APRM Caused Monitor to Not Meet Seismic Qualification Requirements.Caused by Lack of Knowledge.Page Latches for Other APRMs Were Inspected & No Anomolies Were Found
05000461/LER-1999-010, :on 990809,declared Div 2 EDG Inoperable Due to Fuel Leaking Into Lube Oil.Replaced Fuel Return Line from Engine Number 12 Cylinder on Div 2 Edg.With1999-09-0808 September 1999
- on 990809,declared Div 2 EDG Inoperable Due to Fuel Leaking Into Lube Oil.Replaced Fuel Return Line from Engine Number 12 Cylinder on Div 2 Edg.With
U-603267, Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Clinton Power Station,Unit 1.With U-603245, Monthly Operating Rept for Jul 1999 for CPS Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for Jul 1999 for CPS Unit 1.With ML20211C9621999-07-26026 July 1999 ISI Summary Rept 05000461/LER-1999-009, :on 990617,failure to Satisfy Secondary Containment Bypass Leakage Rate TS Was Noted.Caused by Failure to Properly Classify Containment Penetrations. Procedures Revised.With1999-07-15015 July 1999
- on 990617,failure to Satisfy Secondary Containment Bypass Leakage Rate TS Was Noted.Caused by Failure to Properly Classify Containment Penetrations. Procedures Revised.With
U-603232, Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted1999-07-0909 July 1999 Special Rept:On 990531 Lpms Was Declared Inoperable Due to Receipt of High Vibration & Loose Parts Alarm Which Did Not Clear.Lpms Was Restored to Operable Status on 990707 After Alignment & Tension on Recorder Tape Drive Was Adjusted U-603233, Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Clinton Power Station,Unit 1.With U-603222, Monthly Operating Rept for May 1999 for Clinton Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Clinton Power Station.With 05000461/LER-1999-006, :on 990419,values Used for Containment & Drywell Free Vols Found to Be Smaller than Originally Analyzed Due to Inadequate Calculation Control During Initial Plant Const.With 9905517 Ltr1999-05-17017 May 1999
- on 990419,values Used for Containment & Drywell Free Vols Found to Be Smaller than Originally Analyzed Due to Inadequate Calculation Control During Initial Plant Const.With 9905517 Ltr
05000461/LER-1998-014-01, Design Failure Analysis for FW Piping Does Not Match Fatigue Analysis for FW Nozzles Resulting in Condition Outside of Design Basis for Plant, Has Been Cancelled1999-05-13013 May 1999 Design Failure Analysis for FW Piping Does Not Match Fatigue Analysis for FW Nozzles Resulting in Condition Outside of Design Basis for Plant, Has Been Cancelled ML20210K8391999-05-11011 May 1999 British Energy Annual Rept & Accounts 1998-99 ML20206H1231999-05-0505 May 1999 Illinois Power Co CPS Main CR Simulator Certification Rept U-603204, Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR211999-04-30030 April 1999 Final Part 21 Rept 21-99-003 Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier Trentec for Westinghouse Breaker 1AP05EH.Issue Determined Not Reportable Per 10CFR21 U-603210, Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Cps,Unit 1.With 05000461/LER-1998-030-01, Insufficient Suppression Pool Makeup Volume to Meet Design Basis Suppression Pool Level Requirements Following LOCA, Has Been Cancelled1999-04-19019 April 1999 Insufficient Suppression Pool Makeup Volume to Meet Design Basis Suppression Pool Level Requirements Following LOCA, Has Been Cancelled U-603192, Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Clinton Power Station,Unit 1.With ML20205D3861999-03-26026 March 1999 Safety Evaluation Supporting Amend 122 to License NPF-62 U-603182, Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue1999-03-12012 March 1999 Part 21 Rept Re Deficiency in Commercial Grade Dedication Process Used by Circuit Breaker Refurbishment Supplier, Trentec.Condition Rept 1-99-01-136 Was Initiated to Track Investigation & Resolution of Issue ML20207H0201999-03-0808 March 1999 Safety Evaluation Supporting Amend 121 to License NPF-62 U-603176, Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Clinton Power Station,Unit 1.With 05000461/LER-1999-004, :on 990126,plant Was Operating Outside Design Basis.Caused Because Design for CR Operator Dose Calculation Did Not Consider Single Failure of CR Ventilation Sys. Revised CR Operator Dose Calculation.With1999-02-25025 February 1999
- on 990126,plant Was Operating Outside Design Basis.Caused Because Design for CR Operator Dose Calculation Did Not Consider Single Failure of CR Ventilation Sys. Revised CR Operator Dose Calculation.With
ML20207F2031999-02-10010 February 1999 Rev 1 to CPS COLR for Reload 6 Cycle 7 05000461/LER-1999-002, :on 990106,loss of Offsite Power to SR Electrical Buses Was Noted.Caused by Offsite Fault on in Service Offsite Electrical Supply Line.Repairs Were Made to Faulted Line & Leaning Support Structure.With1999-02-0404 February 1999
- on 990106,loss of Offsite Power to SR Electrical Buses Was Noted.Caused by Offsite Fault on in Service Offsite Electrical Supply Line.Repairs Were Made to Faulted Line & Leaning Support Structure.With
ML20202J0181999-02-0303 February 1999 SER Accepting Changes in Quality Assurance Program,Which Continues to Meet Requirements of App B to 10CFR50 ML20199L3581999-01-20020 January 1999 Safety Evaluation Supporting Amend 120 to License NPF-62 ML20199L3871999-01-20020 January 1999 Safety Evaluation Supporting Amend 119 to License NPF-62 U-603223, Illinova Corp 1998 Annual Rept. with1998-12-31031 December 1998 Illinova Corp 1998 Annual Rept. with U-603144, Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Clinton Power Station,Unit 1.With U-603115, Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components1998-12-0404 December 1998 Part 21 Interim Rept 21-98-021 Re Deficiencies in Matl Dedication Process Used by Goulds Pumps in Supplying SR Parts to Npps.Issue Is Not Reportable Under 10CFR21. Dedication Process Did Not Affect Ability of Components U-603124, Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Clinton Power Station,Unit 1.With U-603114, Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor1998-11-25025 November 1998 Part 21 Rept 21-98-049 Re W Dhp Circuit Breaker Refurbished by Nuclear Logistics,Inc Which Failed to Operate.Caused by Trip Latch out-of-adjustment & Incorrectly Sized Ratchet Lever Assembly Bushing.Breakers Were Returned to Vendor 05000461/LER-1998-036, :on 981018,loss of Shutdown Cooling Was Noted. Caused by Personnel Opening Incorrect Electrical Cubicle Door.Learning Opportunities Re Incorrect Cubicle Door Were Communicated to Personnel & Training Will Be Improved1998-11-17017 November 1998
- on 981018,loss of Shutdown Cooling Was Noted. Caused by Personnel Opening Incorrect Electrical Cubicle Door.Learning Opportunities Re Incorrect Cubicle Door Were Communicated to Personnel & Training Will Be Improved
U-603103, Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Clinton Power Station,Unit 1.With U-603101, Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site1998-10-28028 October 1998 Special Rept:On 980918,discovered That Triaxial Seismic Accelerometers Had Not Been Properly Calibrated.Caused by Inadequate Calibration Procedure.Calibration to Be Performed off-site ML20154J0001998-10-0909 October 1998 Safety Evaluation Supporting Amend 117 to License NPF-62 ML20154F8701998-10-0606 October 1998 Safety Evaluation Authorizing Proposed Alternative to Requirements of OMa-1988,Part 10,Section 4.2.2.3 for 21 Category a Reactor Coolant Sys Pressure Isolation Valves U-603091, Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Clinton Power Station,Unit 1.With ML20153F9871998-09-17017 September 1998 Safety Evaluation Accepting 980225 Proposed Rev 26 to Illinois Power Nuclear Program Qam ML20151U1391998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Clinton Power Station,Unit 1 ML20237E3991998-08-27027 August 1998 SER Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode, for Clinton Power Station ML20237D7041998-08-13013 August 1998 Safety Evaluation Supporting Amend 115 to License NPF-62 ML20237A1521998-08-0707 August 1998 SER Re Mgt Services Agreement at Clinton Power Station. Approval Under 10CFR50.80 Not Required ML20151Y6591998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Clinton Power Station,Unit 1 U-603033, Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals1998-07-20020 July 1998 Part 21 Rept 21-98-039 Re Shrinkage of Medium & High Density Silicone Seals Designed & Installed by Bisco Using Dow Corning Sylgard 170 Matl.Caused by Coefficient of Thermal Expansion.Will Inspect & Rework/Repair Suspected Seals 1999-09-08
[Table view] |
Text
_ _ _
b-b
~
g ILLIN018 POWER COMPANY ggy 199 CLINTON POWER STATION. P.O. BOX E78, CLINTON ILLINOIS 61727 September 30 1983 Docket No. 50-461 Mr. James G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Deficiency 83-04 10CFR50.55(e)
Document Control of Design Change Documents
Dear Mr. Keppler:
On February 15, 1983, Illinois Power Company verbally notified Mr. F. Jablonski, U.S. Nuclear Regulatory Commission, Region III (ref: IP memorandum Y-14166, 1605-L, dated February 15, 1983) of a potentially reportable deficiency per 10CFR50.55(e) concerning document control of General Electric Company (CPS NSSS Supplier) Field Deviation Disposition Requests (FDDRs) and Field Disposition Instructions (FDIs).
This initial notific'ation was followed by two (2) interim reports (Ref: IP letter U-10041, 1605-L, D. P. Hall to J. G. Keppler, dated March 22, 1983 and IP letter U-10067, D. P. Hall to J. G. Keppler dated July 6, 1983).
Our investigation has determined that this concern is a reportable deficiency per 10CFR50.55(e).
This letter represents a final report in accordance with 10CFR50.55(e)(3).
Statement of Reportable Deficiency Document ecntrol of some design change documents did not ensure that drawings properly identified all outstanding changes.
General Electric FDDRs and FDIs received at the Clinton site were not always properly " posted" or identified as outstanding against affected General Electric (G.E.) drawings.
Background
An Illinois Power quality assurance surveillance of the IP Startup organization was conducted in February, 1983, and
- resulted in two (2) findings regarding document control practices.
One finding identified a lack of implementation of a section of Baldwin Associates' (BA) (CPS Constructor) procedure 1.10, " Control of G.E. Items / Material / Activities affected by FDDRs/FDIs".
The procedure requires Baldwin Associates Document Control Center to post FDDRs and FDIs as " outstanding" against k
8310120077 830930 PDR ADOCK 05000461
/
f S
PDR
i
=
James G. Kcppler 2-September 30, 1983 the affected drawings until the G.E. drawing is revised to incorporate the FDDR/FDI.
Contrary to this, the FDDR/FDI was sometimes deleted as outstanding again3c the affected document when the physical work associated with the FDDR/FDI was completed.
The second finding identified a deficiency concerning FDDRs/FDIs that affect Sargent & Lundy (S&L) (CPS Architect / Engineer) schematic and wiring diagrams (E-02 and E-03 series drawings).
It was identified that procedures did not require postings of FDDRs/FDIs against affected S&L schematic and wiring diagrams.
Therefore, changes to design drawings were not being distributed and used at the locations where the prescribed activities are performed.
Investigation Results An investigation of this issue was performed and is summarized below:
1.
The present practice cf performing construction work changes as a result of FDDRs and FDIs is through the use of controlled revisions to the work traveler (package of instructions and drawings required to explain and perform the work).
The construction work resulting from the FDDR/FDIs has progressed correctly and in a controlled manner under the direction of a G.E. site representative.
Therefore, this 10CFR50.55(e) deficiency concerns the documentation changes to affected file documents and the potential use of these documents for startup testing.
2.
BA's practices for posting FDDRs and FDIs against G.E.
drawings were evaluated.
It was determined that the posting was deleted on completion of the field work specified by the FDDR/FDI.
This resulted in a situation where some drawings erroneously reflected the pre-modified design conditions and work control travelers reflected the hardware in the post-modified configuration.
3.
A review of IP Startup document control nrocedures revealed that the mechanics of posting design change documents to G.E. drawings were unclear and did not assure that all unincorporated design change documents were known and evaluated at the time of testing.
However, there is no impact on testing at this time since pre-operational tests have not yet been performed.
4.
The posting of FDDRs and FDIs against S&L design drawings was evaluated.
It was confirmed that FDDRs and FDIs were not being posted to these drawings.
a
\\
Jam c G. Keppler September 30, 1983 5.
The investigation determined the main causes contributing to the occurrence were:
document control instructions for handling FDDRs/
FDIs were not, in all cases, sufficiently
- detailed, training of personnel in the use and inter-relationship of various G.E. documents was not
- adequate, administrative support staffing of the document control center was not adequate to support planning and development work.
This problem was found to be unique to the handling of G.E.
design changes.
BA's design change methods for other drawings used at CPS were reviewed and found to be adequately controlled by procedures.
Corrective Action The following actions have been or are being taken to correct this deficiency and to prevent recurrence:
1.
Baldwin Associates has revised their procedures and instructions to incorporate revised methods of posting design changes.
BA then performed a complete review of G.E. drawings and ensured that the current design change status was indicated.
2.
Illinois Power Startup has revised their procedures and instructions to clarify how design change documents shall be received, reviewed, and issued in a controlled manner.
3.
Training has been performed for affected Illinois Power and Baldwin Associates personnel on processing of FDDRs/FDIs and in the use/ interrelationship of the various G.E. documents.
4.
The FDDRs and FDIs that have not yet been incorporated into S&L design drawings have been identified.
S&L is issuing Field Engineering Change Notices (FECNs) for posting against their design drawings, until the changes are incorporated.
5.
Illinois Power has established improved methods to identify the incorporation of G.E. design changes into affected drawings and provide status information regarding superseded drawings.
6.
The Baldwin Associates Document Control Center was reorganized under a new manager and additional
.....s Jemas G.-Keppler september 30, 1983 supervision is being recruited.
A management audit of the Document Control Center is also being performed to review present methods and procedures and to plan for future development.
Safety Implications / Significance The investigation of the FDDR/FDI posting problem found that the inadequate document control practices did not have an adverse impact on construction work'or testing activities at this time.
However, certain drawings did not reflect the approved design changes and the potential existed that future tests and test evaluations may not have accounted for the effects of the design changes.
Had this occurred, it could be postulated that design change errors would not have been identified during testing, which may have affected the safety of operations of Clinton Power Station.
Although this assumes several unlikely events, this deficiency is considered significant, and reportable under 10CFR50.55(e).
We trust that this final report provides sufficient background information to perform a general assessment of this reportable deficiency, and adequately describes our investigation and resolutions.
Sincerely yours,
/
. Hall Vice President REC /ldf cc: