ML20107K567
| ML20107K567 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 10/22/1984 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 55-84-14, U-L-208, U-L0-208, NUDOCS 8411130195 | |
| Download: ML20107K567 (1) | |
Text
bind
Y'130 ILLINOIS POWER COMPANY
[jfF U-10208 CLINTON POWER STATION. P.O. BOX 678. CLINTON ILLINOIS 61727 October 22, 1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nucle ar Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Potential 10CFR50.55(e) Deficiency 55-84-14:
BAQA Vendor Surveillance
Dear Mr. Keppler:
In Illinois Power Company letter dated July 20, 1984 (Ref:
Letter D. P. Hall to J. G. Keppler, U-10181) your office was provided an interim report addressing the status of the subject 10CFR50.55(e) investigation.
It was anticipated at the time that an interim report would be provided in approximately ninety (90) days.
Illinois Power Company is presently involved in evaluating the need to expand its investigation associated with the BAQA Vendor Surveillance issue.
It is anticipated that approximately thirty (30) additional days will be necessary to complete our evaluation and provide an interim report on the issue.
If you have any questions or comments regarding the status of actions taken on this issue, please contact Illinois Power Company.
Sincerely yours, D. P. Hall Vice President RLC/cbs (NRC) cc:
NRC Resident Office, Director - Office of I&E, US NRC, Washington, DC 20555 Illinois Department of Nuclear Safety INP0 Records Center 8411130195 841022 PDR ADOCK 05000461 S
PDR 007 2 0 1984 40 nctu 7