Interim Deficiency Rept 55-84-13 Re Suppression Pool Temp Monitoring Sys.Addl 30 Days Needed to Complete Analysis & Evaluation & Provide Final Rept on Issue
ML20112F536
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/31/1984
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
55-84-13, U-10234, NUDOCS 8501150399
Download: ML20112F536 (1)


Text

5 A rn Al

/LLINDIS POWER DOMPANY 1A.120 CLINTON POMR STATION. P.O. BOX 678. CLINTON. ILLINOIS 61727 U-10234 December 31, 1984 Docket No. 50-461 Mr. James G. Keppler Regional Administrator Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyv, IL 60137

Subject:

Potential 10CFR50.55(e) Deficiency 55-84-13:

Suppression Pool Temperature Monitoring System

Dear Mr. Keppler:

In Illinois Power Company letter dated November 2, 1984 (Ref:

Letter D. P. Hall to J. G. Keppler, U-10217) your office was provided an interim report addressing the status of the subject 10CFR50.55(e) investigation.

It was anticipated at the time that a final report would be provided in approximately sixty (60) days.

Illinois Power Company has identified additional information which is pertinent to the safety significance evaluation of this issue.

It is anticipated that approximately thirty (30) additional days will be necessary to complete our analysis and evaluation of this information and provide a final report on the issue.

If you have any questions or comments regarding the status of actions taken on this issue, please contact Illinois Power Company.

Sincerely yours, '

t D.

Hall Vice President RLC/gs (NRC2) cc: