l h) G U-0681 0
~
/LLIN0/S POWER DOMPANY
_93
_gy _7 I CLINTON POWER STATION, P.O. box 678. CLINTON ILLINOIS 61727 December 22, 1983 Docket tb. 50-461 1
Mr. James G. Keppler Rrginnal Mntinistrator, Region III U. S. Nuclear Regulatory Ccmnission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
10TR Part 21 Defect Electroswitch Series 20K (bntrol Switches
Dear Mr. Keppler:
Our letter of April 7,1983 indicated that we expected to ocrnplete the re-placanent of the safety related Electroswitch Series 20K switches by Decenber 31, 1983.
Due to unexpected delays in procurenent of the replace 7ent switches, we now expect to have the engineering and the procurenent completed by April 1, 1984. At that time we will begin the physical replacanent of the switches on panel-by-panel basis. Replacanent of the switches will be coardinated with the control roan testing and canpleted prior to turn-over of the safety systens.
' cere
- yours,
/
. I Hall Vice President l
l JP0/1jb l