Ack Receipt of Providing Addl Info Re Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06.Util Justification for Denial of Violation Ii.B Not Adequate as Discussed in Encl.Encl Withheld (Ref 10CFR2.790(d) & 73.21)
ML20212R610
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/17/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: James O'Reilly
GEORGIA POWER CO.
References
EA-86-069, EA-86-69, NUDOCS 8704270277
Download: ML20212R610 (2)


See also: IR 05000321/1986006

Text

- - _ _

"

SAFEGUARDS INFORMATION

APR 171987

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

EA 86-69

Georgia

ATTN: Mr.Power

James P.Company'Reilly

O

Senior Vice President-

Nuclear Operations

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06

Thank you for your response of January 27, 1987, to our request for additional

information concerning violations II.B, II.D, and II.E. We have evaluated your

corrective actions for violations II.D and II.E and found that they meet the

requirements of 10 CFR 2.210. We will examine the implementation of these

actions during future inspections.

For the reasons presented in the enclosure to this letter, your stated basis

for denial of violation II.B is not considered to be adequate justification for

withdrawal of this violation. Therefore, in accordance with 10 CFR 2.210(a),

please submit to this office within 30 days of the date of this letter your

written statement describing steps which have been taken to correct the

the results achieved, corrective steps which will be taken to avoid

violation,

further vio lations, and the date when full compliance will be achieved.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosure

to this letter will not be placed in the NRC Public Document Room.

The responses directed by this letter are not subject to the clearance

procedure of the Office of Management and Budget as required by the Paperwork

Reduction Act of 1980, PL 96-511.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosure:

Staff Assessment of Licensee Response

(Safeguards Information)

ct w/ enc 1: (See page 2)

'

SAFEGU ARDS IN FORM ATlhestnt C

8704270277 870417 pAgg is DECONTgoLLID.

PDR ADOCK 05000321 _

1

0 PDR .- g

_ _ - _ - _ - - _ _ _ _ - - - - - - - - _ _ - _- - . _ _ _ - - _ -

-

SAFEGUARDS INFORMATION

Georgia Power Company 2

cc w/ enc 1:

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix, Site Operations General

Manager

A. Fraser, Acting Site QA Supervisor

L. Gucwa, Manager, Nuclear Safety

and Licensing

bcc w/ encl:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/o encl:

NRC Resident Inspector

State of Georgia

Document Control Desk

1b lin 'J o tntis AW

p 87

4g 87 04////87 /87 0//f/8 4/j/87

/

RII RII RI ,

RII RII

VBrownlee LRe es ins RGoddard t

04/t 7 87 04/1/87 / 04/ /87

04///87 [ 04/G /87

\

t

,,

ENCLOSUan CCHT

UPON SEPA

PAGE IS DECONT

.

i

'

,.e

.

,, Georg a Power Comca v

.p 333 P ecmcet Ave %e

o At'a-'a Georg a 103CS

e 1 *e+ct'cre 4C4 525 7W

.

S$3d"y

v Ad3'933

Na"Sf,;'aNc2 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

UPUN SEPARATION THIS PAGE DECONTROLLED

James P. o'ReiHy

3+ cr V ce P

uear coe,'es: cent

at e s SL-1865

0061b

u

January 27, 1987 *

c

.7

m

l

.. '

U.S. Nuclear Regulatory Commission w U

ATTN: Document Control Desk  ?. ( >

"

7

Washington, D.C. 20555

- o]

NRC DOCKETS 50-321, II 50-366 '

P7

OPERATING LICENSES DPR-57, II NPF-5 A pl

EDWIN I. HATCH NUCLEAR PLAN UNITS 1, 2 '8"

INSPECTION REPORT 86-06

Gentlemen:

This letter is in response to Inspection Report Nos. 50-321/86-06 and

50-366/86-06 and the Notice of Violation, dated May 28, 1986, and the request

for additional information dated December 23, 1986. The referenced report

relates to an NRC inspection conducted on February 24-28 and March 18-19, 1986.

As noted in the response to Inspection Report 86-37, and as indicated in

previous correspondence and meetings, Georgia Power Conpany (GPC) has

urkrtaken numerous security improvements at both Plant Hatch and Plant

Vogtle, and at our Corporate office to further enhance the Nuclear Security

Program. We specifically wish to note that GPC has created and fully staffed

a corporate nuclear security organization that monitort and provides

assistance and direction to Plant Security Operations. The recent Regulatory

Effectiveness Review of Plant Hatch, which concentrated on actual physical

security issues, resulted in a favorable preliminary report on the security

operation of the plant. We believe this review is but another confirmation of

our efforts to achieve excellence and the exemplary results accomplished in

the past year. .

The Georgia Power Company does not wish to pursue our request for

mitigation on problems identified in early 1986 any further even though our l

view has not changed. The Georgia Power Company has focused its attention on

excellence in 1987 and plans not only to fully meet NRC security

interpretations and standards but to exceed them in areas and matters

important to our circumstances and needs.

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

UPUN 5EPAHAfl0N IHIb PAGE ULCUNTRULLEU

_

-

3

-

.

.*

.* .

.

U.S. Nuclear Regulatory Commission

January 27, 1987

Page two

The enclosure addresses additional information related to Violations II.8,

II.D. II.E in Inspection Report 86-06. The enclosures contain safeguards

information and should be withheld from public disclosure in accordance with

the requirements of 10 CFR 2.790(d) and 10 CFR 73.21.

GEORGIA POWER COMPANY

By: m k. U')' k . 1.

Ja s P. O'Reilly

MJB/sjb

Enclosure

c: w/o Enclosure

Geortfa Power Company U.S. Nuclear Regulatory Commission

tir. V. T. Beckham, Jr. Regfonal Administrator, Region II

Plant Hatch Senior Resident Inspector

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION

urun straxmilun IMis est Id utcuRTRUI.TEU

.