Advises of Insp Initiative Implemented for All Operating Reactors.Insp Evaluates Licensee Maint Performance,Both safety-related & Balance of Plant,Against Existing Regulations,Industry Stds & Accepted Industry Practice
ML20204G417
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/13/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8810240111
Download: ML20204G417 (2)


Text

=- .

e ,

% + r 2/. r Ed r. e, OCT I 3.1988 In Reply Refer To:

Docket: 50-382 Louisiana Power & Light Company '

ATTN: J. G. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street New Orleans, Louisiana 70160 Gentlemen:.

This is to advise you of an inspection initiative that has been implemented NRC wide for all operating reactors. Periodically, one or more subject areas (e.g., plant configuration control, maintenance, emergency operating procedures) will be selected for specific team inspection emphasis in the fundamental inspection program. Maintenance has been selected as an area of emphasis by the Director of Nuclear Reactor Regulation, after consultation with the Regional Administrators, and with input from various NRC offices.

Maintenance team inspections will be scheduled at each of the Region IV facilities within the next two years.

The purpose of the inspection is to evaluate each licensee's maintenance performance, both safety related and balance of plant, against existing regulations, industry standards, and accepted good industry practices. The inspection will address all aspects of maintenance performance including preventive and corrective maintenance, its scheduling, planning, performance, parts acquisition, and engineerinj support.

To accomplish this task, Region IV has selected two team leaders and formed a multidisciplined inspection team. The team leaders are Dennis L. Kelley and Raymond P. Mullikin. The teams engineering discipline areas are: mechanical, electrical, instrument / control, health physics, and management evaluation.

The inspections will consist of two on-site inspection weeks separated by a week of off-site inspection. Several weeks prior to the inspection you will receive a letter identifying the team members, specifying the schedule dates of the inspection, a request for specific information, and identifying a one or two day site visit by the team leader to discuss in detail the scope of the inspection.

RIV:C:0PS

(

DI Sp D:. d s

  • JEGagliardo JLM lhoan LJt la

/ /88 #/3 /88 to /n /88

  • previously concurred i \

\O e

8810240111 8G1013 Y

PDR ADOCK 05000382 O PDC

.. 1. -

Louisiana Power & Light' Company '

-If you have questions regarding this inspection, the Region IV team leader designated for your. site (Ray Mullikin, 817-860-8250) will be pleased to answer your questions.

Sincerely, Qdps1 El thedi By IN. B. Ench 4.. J. Callan, Director Division of Reactor Projects s cc:

Louisiana Power & Light Company ATTN: G. E. Wuller, Onsite t Licensing Coordinator

, P.O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company  ;

i ATTN: N. S. Carns, Plant Manager P.O. Box B Killona, Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally  ;

P.O. Box 61000 New Orleans, Louisiana 70161

'f Louisiana Power & Light Company ATTN: R. F. Burski, Acting Manager '

, Nuclear Safety and Regulatory i i Affairs

! 317 Baronne Street i P.O. Box 60340 j

' New Orleans, Louisiana 70160 j Louisiana Radiation Control Program Director

) bec to DMB (IE01) i l bec distrib by RIV:

i RRI R. D. Martin, RA i i

SectionChief(ORP/A)- DRP i RPB-DRSS HIS System

! Project Engineer, DRP/A RSTS Operator RIV File D. Wigginton, NRR Project Manager DRS Lisa Shea, RM/ALF J. Gagliardo J. Gagliardo Reading File D. Kelley R. Mullikin j

, A. Gody, NRR J. Roe, NRR

l

. .