Forwards AEOD Assessment of Selected LERs from 851001 to Present,For Info,Prior to Issuance of SALP 6 Board Rept. Assessment Performed Per Guidelines Contained in Nureg/ CR-4178.LERs Above Average & Very High in Quality
ML20203K933
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 08/15/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
References
RTR-NUREG-CR-4178 NUDOCS 8608220269
Download: ML20203K933 (45)


Text

. .

,, As UNITED ST ATES f p sYuq g NUCLEAR REGULATORY COMMisslON g l; E REGION 111 5 'j 7ss moosEvtLT nono O cLEN ELLYN, ILLINO15 60137

....+

AUG 151986 Docket No. 50-373 Docket No. 50-374 Commonwealth Edison Company ATTN: Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

The NRC's Office for Analysis and Evaluation of Operational Data (AE0D) has recently completed an assessment of your Licensee Event Reports (LERs) from LaSalle 1 and 2 as part of the NRC's Systematic Assessment of Licensee Performance (SALP). We are providing you a copy of AE00's assessment prior to the issuance of the SALP 6 Board Report so that you might be aware of their findings and to also provide you a basis by which future submittals should be patterned.

In general, the reports for this period were found to be above average and of very high quality. This is a significant improvement over the last period in which the reports were considered average.

The evaluation of the content and quality of a representative sample of LERs submitted by LaSalle 1 and 2 from October 1,1985 to the present was performed using a refinement of the basic methodology presented in NUREG/CR-4178. This is the second time that the LaSalle LERs have been evaluated using this methodology.

The results of this evaluation indicate that the LaSalle 1 and 2 LERs now have an overall average score of 8.9 out of a possible 10 points, compared to their previous overall average score of 8.0 and a current industry average of 7.9.

One weakness that still remains in the LaSalle LERs, in terms of their description of safety significance, involves the requirement to provide the manufacturer and model number (or other appropriate identification) for those components that fail or whose design contributes to the event. The failure to provide information concerning the identification of failed components prompts concerns that others in the industry may not obtain information that might enable them to identify and correct generic problems prior to having a similar failure at their facility.

A strong point of the LaSalle LERs is that information concerning root cause, 8608220269 86001S PDR ADOCK 0D000373 0 PDP

$5 V i

AUG 151906 safety assessment, and the mode, mechanism, and effect of the failed component was well written for the LERs that were evaluated.

The basis for these findings can be found in the enclosed document.

Sincerely, Charles E. Norelius, Director Division of Reactor Projects i

Enclosure:

AE0D Assessment cc w/ enclosure:

D. L. Farrar, Director of Neri licensing C. J. Dieaerich, Plant Manager DCS/RSB (RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Phyllis Dunton, Attorney _

j General's Office, Environmental Control Division 1

l t

i RIII RIII RLII RIII R RII e /qg Sc w nz e Gu d nd ypg t

/7/86 &'VA ,py[4 f 7

6i C 1

.~ ..

AE00 INPUT TO SALP REVIEW FOR LASALLE 1.AND 2 Introduction In order to evaluate the overall quality of the contents of the Licensee Event Reports (LERs) submitted by LaSalle 1 and 2 during the October 1, 1985 to August 31, 1986 Systematic Assessment of Licensee Performance (SALP) assessment oeriod, a representative sample si the station's LERs was evaluated using = refinement cf the basic methodology presented in NUREG/CR-4178. The sample consists of a total of 10 LERs (i.e., 6 LERs for LaSalle 1 and 4 for LaSalle 2), which is 60% of the LERs on file at the time the sample was selected. The laSalle LERs were

~

evaluated as one sample for this SALP period because it was determined that their LERs are both written and formally reviewed at the station, rather than unit, level. See Appendix A for a list of the LER numbers in the sample.

It was necessary to start the evaluation before the end of the SALP assessment period because the input was due such a short time after the end of the SALP period. Therefore, all of the LERs prepared during the SALP assessment period were not available for review, Methodology The evaluation consists of a detailed review of each selected LER to determine how well the content of its text, abstract, and coded fields meet the requirements of NUREG-1022 , and Supplements 1 and 2 to NUREG-1022.

The evaluation process for each LER is divided into two parts. The first part of the evaluation consists of documenting comments specific to the content and presentation of each LER. The second part consists of determining a score (0-10 points) for the text, abstract, and coded fields of each LER.

The LER specific comments serve two purposes: (1) they point out what the analysts considered to be the specific deficiencies or observations concerning the inf ornation pertaining to the event, and (2) they provide a basis for a count of general deficiencies for the overall sample of LERs that was reviewed. Likewise, the scores serve two purposes: (1) they serve to illustrate in numerical terms how the analysts perceived the content of the infornation that was presented, and (2) they provide a basis for determining an overall score for each LER. The overall score for each LER is the result of combining the scores for the text, abstract, and coded fields (i.e., 0.6 x text score + 0.3 x abstract score + 0.1 x coded fields score overall LER score).

The results of the LER quality evaluation are divided into two categories: (1) detailed information and (2) sunmary information. The detailed infornation, presented in Appendices A through D, consists of LER sample information (Appendix A), a table of the scores for each sample LER

( Appendix B), tables of the number of deficienrics and observations for the text, abstract and coded fields (Appendix C), and comment sheets containing narrative statements concerning the contents of each LER (Appendix D).

When referring to these appendices, the reader is cautioned not to try to directly correlate the number of comments on a comment sheet with the LER scores, as the analysts has flexibility to consider the magnitude of a deficiency when assigning scores.

Discussion of Results A discussion of the analysts' conclusions concerning LER quality is presented below. These conclusions are based solely on the results of the evaluation of the contents of the LERs selected for review and as such represent the analysts' assessment of the station's performance (on a scale of 0 to 10) in submitting LERs that meet the requirements of 10 CFR 50.73(b). Again, LaSalle LERs were evaluated as one sample, rather than two separate samples (by unit), because it was determined that the LaSalle LERs are both written and formally reviewed at the station, rather than the unit, level.

Table 1 presents the average scores for the sample of LERs evaluated for the station. The reader is cautioned that the scores resulting from the methodology used for this evaluation are not directly comparable to the scores contained in NUREG/CR-4178 due to refinements in the methodology.

In order to place the scores provided in Tdble 1 in perspective, the distribution of the overall average score for all licensees that have been evaluated using the current methodology is provided on Figure 1.

Additional scores are added to Figure 1 each month as other licensees are evaluated. Table 2 and Appendix Table B-1 provide a summary of the information that is the basis for the average scores in Table 1. For example, LaSalle's average score for the text of the LERs that were evaluated is 8.8 out of a possible 10 points. From Table 2 it can be seen that the text score actually results from the review and evaluation of 17 different requirements ranging from the discussion of plant operating conditions before the event [10 CFR 50.73(b)(2)(ii)(A)] to text presentation. The percentage scores in the text summary section of Table 2 provide an indication of how well each text requirement was addressed by the station for the 10 LERs that were evaluated.

Discussion of SDecific Deficiencies 4

A review of the percentage scores presented in Table 2 will quickly point out where the station is experiencing the most difficulty in preparing LERs. For example, requirement percentage scores of less than 75 incicate that the station probably needs additional guidance concerning 4

these requirements. Scores of 75 or above, but less than 100, indicate that the station probably understands the basic requirement but has either: (1) excluded certain less significant information from most of the discussion concerning that requirement or (2) totally failed to address the requirement in one or two of the selected LERs. The station should review the LER specific comments presented in Appendix D in order to determine why it received less than a perfect score for certain requirements. The text requirements with a score of less than 75 are discussed below in their order of importance. In addition, the primary deficiencies in the abstract and coded fields are discussed.

.. . ._ __ .- - . =_ -_

TABLE 1. SUMARY 0.F SCORES FOR LASALLE 1 AND 2 Average High Low Text 8.8 9.5 7.6 Abstract 9.0 10.0 7.6 Coded Fields 9.0 9.8 8.5 Overall 8.9 9.3 8.0

a. See Appendix 8 for a summary of scores for each LER that was evaluated.

s

s e

r

- - - - - - - - - - - - 0 6

o ,

c ,

s '

R 5

,. 6 .

E i

L '

e g '

a r

l

, 0 7

e >

s e

v a

h r o

c 5 s ai 7 e

r '

g e ' a v '

r e

o v a

i f

0 .

o i

l 8 l a

r n >

2 e

o' v O

i - 1 t ' e u i l

l a  : d' V2 5

8 b

i S

r a .

t L i

s m rdy2k D '

r 0 9

1

. i e

r u ,

_7 5 g;-

9 i

F1 5 4 3 2 1 1 1 1

1 0 9 8 7 G 5 4 3 2 1

o

' ', ,' ,  ! i

4 TABLE 2. LER REQUIREMENT PERCENTAGE SCORES FOR LASALLE 1 AND 2 TEXT Percentage Reautrements ISO.73(b)1 - Descriptions Scores ( J a

(2)(ii)(A) - - Plant condition prior to event 100 (10)

(2)(11)(B) - - Inoperable equipment that contributed b (2)(ii)(C) - - Date(s) and approximate times 97 (10)

(2)(1)}(D) - - Root cause and intermediate cause(s) 96 (10)

(2)(ii)(E) - - Mode, mechanism, and effect 96 (6)

(2)(ii)(F) - - EIIS Codes 60 (10)

(2)(11)(G) - - Secondary function affected b (2)(11)(H) - - Estimate of unavailability 80 (5)

(2)(11)(I) - - Method of discovery 80 (10)

(2)(ii)(J)(1) - Operator actions affecting course 100 (2)

(2)(11)(J)(2) - Personnel error (procedural deficiency) 81 (4)

(2)(ii)(K) - - Safety system responses 100 (3)

(2)(ii)(L) - - Manufacturer and model no. information 50 (6)

(3) -----

Assessment of safety consequences 90 (10)

(4) -----

Corrective actions 84 (10)

(5) -----

Previous similar event information' 100 (10)

(2)(i) - - - - Text presentation 86 (10)

ABSTRACT Percentage Reauirements I5O.73(b)(111 - Descriptions Scores ( )'

- Major occurrences (Immediate cause and effect 92 (10) information)

- Description of plant, system, component, and/or 100 (3) personnel responses

- Root cause information 92 (10)

- Corrective Action information 91 (10)

- Abstract presentation 81 (10)

TABLE 2. (continued)

CODED FIELOS Percentage Item Number (s) - Description Scores ( )

1, 2, and 3 - Facility name (unit no.), docket no. and 100 (10) page number (s) ,

4 - - - - - - Title 73 (10) 5, 6, and 7 - Event date, LER No., and report date 99 (10) 8 - - - - - - Other facilities involved 84 (10) 9 and 10 - - Operating mode and power level 100 (10) 11 - - - - - Reporting requirements 93 (10) 12 - - - - - Licensee contact information 88 (10) 13 - - - - - Coded component failure information 86 (10) 14 and 15 - - Supplemental report information 95 (10)

a. Percentage scores are the result of dividing the total points for a requirement by the number of points possible for that requirement.

(Note: Some requirements are not applicable to all LERs; therefore, the number of points possible was adjusted accordingly.) The number in parenthesis is the number of LERs for which the requirement was considered applicable.

b. A percentage score for this requirement is meaningless as it is not possible to determine from the infornation available to the analyst whether this requirement is applicable to a specific LER. It is always given 100%

if it is provided and is always considered "not applicable" when it is not.

The manufacturer and/or model number (or other identification) was not provided in the text of three of the six LERs that involved a component failure, Requirement 50.73(b)(2)(11)(L). Components that fail or whose design contributes to the event should be identified in the text so that others in the industry can be made aware of possible generic problems. An event at one station can often lead to the identification of a generic problem that can be corrected at other plants or stations before they experience a similar event.

The Energy Industry Identification System component function identifier and system name codes were not consistently provided in the text.

Three LERs partially provided these codes, and three LERs failed to provide them at all.

The EIIS codes are required to be provided for each system and component referred to in the LER

[ Requirement 50.73(b)(2)(ii)(F)].

The main deficiency in the area of coded fields involves the title, Item (4). Seven of the titles failed to indicate root cause, and three failed to include the result. While the result is considered to be the most important part of the title, cause and link information must be included to make a title complete. An example of a title that only addresses the result might be " Reactor Scram". This is inadequate in that the cause and link are not provided. A more appropriate title might be

" Inadvertent Relay Actuation During Surveillance Test LOP-1 Causes Reactor S'c r am" .

From this title the reader knows the cause involved either personnel or procedures and that testing linked the personnel / procedure error and the scram.

Another area of coded fields contained a minor deficiency; six of the ten LERs evaluated failed to include the Licensee Contact position title (Item 12, NRC Form 366).

Table 3 provides a summary of the areas that still requirement improvement for the LaSalle LERs. For additional and more specific infornation concerning deficiencies, the reader should refer to the

specific information presented in Appendix D. General guidance concerning these requirements can be found in NUREG-1022, Supplement No. 2.

It should be noted that this is the second time that the LaSalle LERs have been evaluated using this same methodology. The previous evaluation, which was reported in September of 1985, was performed on the unit, rather than the station, level; however, after averaging the individual units scores from the previous evaluation, a direct comparison of scores for both evaluations was made, see Table 4. As can be seen, LaSalle LERs have improved significantly since the previous evaluation and are now well above the current industry overall average of 7.9. (Note: The industry overall average is th! result of averaging the current overall average scores for each unit / station that has been evaluated using this methodology.)

l' q

-. , - - - , , - ----r-,, ,-- - , - - -

TABLE 3.

AREAS MOST NEEDING IMPROVEMENT FOR LASALLE 1 AND 2 LERs Areas Comments failed component identification Component identification information such as manufacturer and model number, must be included in the text for each component that fails or is suspected of contributing to the event because of its design.

EIIS codes EIIS codes should be provided in the text for all systems and/or components discussed in the text.

Coded fields

a. Ti t'les All titles should include the result of the event (i.e., why the event was reportable) as well as root cause information. The link between the cause and result should be provided when it is not readily apparent how the root cause led to the result.
b. Licensee contact The position title of the Licensee Contact should be provided. See NUREG-1022, page 24, Item 12.

- - - - - - - _ , ~ - .- --

TABLE 4. COMPARISON OF LER SCORES FROM PREVIOUS EVALUATIONS Report Oate September-85 Auaust-85 Text average 8.0a 8.8 Abstract average 7.9a 9.0 Coded fields average 8.6a 9,o Overall average 8.0a 8.9

a. These average scores are the result of weight averaging the <

September-85 scores for the two LaSalle units to produce a station average.

l l

l I

l l

l

REFERENCES 1.

B. S. Anderson, C. F. Miller, B. M. Valentine, An Evaluation of Selected Licensee Event Reports Prepared Pursuant to 10 CFR 50.73 10 RAFT), NUREG/CR-4178, March 1985.

2.

Of fice for Analysis and Evaluation of Operational Data, Licensee Event Repor t System, September 1983.NURE G-1022, U.S. Nuclear Regula tory Commis sion, 3.

Office for Analysis and Evaluation of Operational Data, Licensee Event Report System, NUREG-1022 Supplement No. 1 U.S. Nuclear Regulatory Commission, February 1984.

4. Office for Analysis and Evaluation of Operational Data, licensee Event Report System, NUREG-1022 Supplement No. 2. U.S. Nuclear Regulatory Commission, September 1985.

s APPENDIX A LER SAMPLE SELECTION INFORMATION FOR LASALLE 1 and 2

TABLE A-1. LER SAMPLE SELECTION FOR LASALLE 1 AND 2 Sample Number Unit Number LER Number Comments 1 1 85-063-01 ESF 2 1 85-066-00 3 1 85-069-00 4 1 86-002-00 5 1 86-003-00 6 1 86-004-00 ESF 7 2 85-044-00 SCRAM 8 2 85-046-00 9 2 85-047-00 10 2 85-048-00 i

I J

t

APPENDIX B EVALUATION SCORES Of INDIVIDUAL LERs FOR LASALLE 1 and 2

1,ntE B-1.

EVALUATION SCORES OF INDIYiDUAL IERs FOR LASALLE 1 AND 7 LER Sample Number

  • 1 2 3 4 5 6 7 8 9 10 11 12 13' 14 15 16 I"it 9.0 8.9 8.6 8.7 9.3 8.7 9.1 9.5 7.6 8.9 -- -- -- -- -- --

Al" tract 9.1 9.? 9.4 8.0 9.7 7.6 9. 7 ' 8. 8 H.5 10.0 -- -- -- -- -- --

, 0-fert i I alds 8.6 9.2 8.8 8.5 9.4 9.8 -g 9.0 9.0 8.6 9.0 -- -- -- -- -- -- 3*

j Os"rall 9.0 9.0 8.8 8.1 9.3 i 8.5 9.3 9.2 8.0 9.3 -- -- -- -- --

LER Sample Number a 17 18 19 70 21 72 73 24 75 26 77 28 29 30 AVERAGE tc t -- -- -- -- -- -- -- -- -- -- -- -- -- --

8.8 Ab. tract -- -- -- -- -- -- -- -- -- -- -- -- -- --

9.0 4

a Cn fod I i.. icts i

9.0 ov. rail -- -- -- -- -- -- -- -- -- --

i 8.9

  • . See Appendix A for a list of the corresponeting LER numbers.

new 1

J

)

6 1

APPENDIX C DEFICIENCY AND OBSERVATION COUNTS FOR LASALLE 1 and 2

1 TABLE C-1. TEXT DEFICIENCIES AND OBSERVA110NS FOR LASALLE 1 AND 2 Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals' Totals ( )

50.73(b)(2)(ii)(A)--Plant operating 0 (10) conditions before the event were not included or were inadequate.

50.73(b)(2)(ii)(B)--Discussion of the status 0 (3) of the structures, components, or systems that were inoperable at the start of the event and that contributed to the event was not included or was inadequate.

50.73(b)(2)(ii)(C)--Failure to include 1 (10) sufficient date and/or time infornation.

a. Date infornation was insufficient. O
b. Time information was insufficient. 1 50.73(b)(2)(ii)(D)--The root cause and/or 2 (10) intermediate failure, system failure, or personnel error was not included or was inadequate.
a. Cause of component failure was not 1 included or was inadequate
b. Cause of system failure was not 1 included or was inadequate
c. Cause of personnel error was not 0 included or was inadequate.

50.73(b)(2)(ii)(E )--The f ailure mode, 1 (6) mechanism (immediate cause), and/or effect (consequence) for each failed component was not included or was inadequatre,

a. Failure mode was not included or was 0 inadequate
b. Mechanism (immediate cause) was not 0 included or was inadequate
c. Effect (consequence) was not included 1

or was inadequate.

TABLE C-1. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals # Totals ( )

50 73(b)(2)(11)(F1--The Energy Industry

]dentification System component function 6 (10) identifier for each component or system was not included.

50.73(b)(2)(ii)(G)--For a failure of a 0 (0) component with multiple functions, a list of systems or secondary functions which were also affected was not included or was inadequate.

50.73(b)(2)(ii)(H)--For a failure that 1 (5) rendered a train of a safety system inoperable, the estimate of elapsed time from the discovery of the failure until the train was returned to service was not included.

50.73(b)(2)(ii)(I)--The method of discover 2 (10) of each component failure, system failure,y personnel error, or procedural error was not included or was inadequate,

a. Method of discovery for each 0 component failure was not included or was inadequate
b. Method of discovery for each system 0 failure was not included or was inadequate
c. Method of discovery for each 2 personnel error was not included or was inadequate
d. Method of discovery for eacn 0 procedural error was not included or was inadequate.

TABLE C-1. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals a

Totals ( )

50.73(b)(2)(ii)(J)(1)--Operator actions that 0 (2) affected the course of the event including operator errors and/or procedural deficiencies were not included or were inadequate.

50.73(b)(2)(ii)(J)(2)--The discussion of 3 (4) each personnel error was not included or was inadequate.

a. OBSERVA110N: A personnel error was 1 implied by the text, but was not explicitly stated.
b. 50.73(b)(2)(ii)(J)(2)(i)--Discussion 2 as to whether the personnel error was cognitive or procedural was not included or was inadequate.
c. 50.73(b)(2)(ii)(J)(2)(ii)--Discussion 0 as to whether the personnel error was contrary to an approved procedure, was a direct result of an error in an approved procedure, or was associated with an activity or task that was not covered by an approved procedure was not included or was inadequate.
d. 50.73(b)(2)(ii)(J)(2)(iii)--Discussion 0 of any unusual characteristics of the work location (e.g., heat, noise) that directly contributed to the personnel error was not included or was inadequate.
e. 50.73(b)(2)(ii)(J)(2)(iv)--Discussion 0 of the type of personnel involved (i.e., contractor personnel, utility licensed operator, utility nonlicensed operator, other utility personnel) was not included or was inadequate.

TABLE C-1. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description cf Deficiencies and Observations Totals a

Totals ( )

50.73(b)(2)(ii)(K)--Automatic and/or manual 0 (3) safety system responses were not included or were inadequate.

50.73(b)(2)(ii)(L)--The manufacturer and/or 3 (6) model number of each failed component was not included or was inadequate.

50.73(b)(3)--An assessment of the safety 3 (10) consequences and implications of the event was not included or was inadequate.

a. OBSERVATION: The availability of other systems or components capable of mitigating the consequences of the event was not discussed. If no other systems or components were available, the text should state that none existed.
b. OBSERVATION: The consequences of the event had it occurred under more severe conditions were not discussed. If the event occurred under what were considered the most severe conditions, the text should so state.

50.73fb)(4)--A discussion of any corrective 6 (10) actions planned as a result of the event including those to reduce the probability of similar events occurring in the future was not included or was inadequate.

TABLE C-1. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals a

Totals ( )

a. A discussion of actions required to 1 correct the problem (e.g., return the component or system to an operational condition or correct the personnel error) was not included or was inadequate,
b. A discussion of actions required to 4 reduce the probability of recurrence of the problem or similar event (correct the root cause) was not included or was inadequate.
c. OBSERVATION: A discussion of actions 1 required to prevent similar failures in similar and/or other systems (e.g.,

correct the faulty part in all components with the same manufacturer and model number) was not included or was inadequate.

50.73(b)(5)--Information concerning previous 0 (10) similar events was not included or was inadequate.

TABLE C-1. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph a

Description of Deficiencies and Observations Totals Totals ( )

50.73(b)(2)(1)--Text presentation 3 (10) inadequacies,

a. OBSERVATION: A diagram would have 0 aided in understanding the text discussion.
b. Text contained undefined acronyms 2 and/or plant specific designators.
c. The text contains other specific 3 deficiencies relating to the readability,
a. The "sub-paragraph total" is a tabulation of specific deficiencies or observations within certain requirements. Since an LER can have more than one deficiency for certain requirements (e.g., an LER can be deficient in the area of both date and time information), the sub-paragraph totals do not necessarily add up to the paragraph total.
b. The " paragraph total" is the number of LERs that have one or more requirement deficiencies or observations. The number in parenthesis is the number of LERs for which the requirement was considered applicable.

1 i

TABLE C-2. ABSTRACT DEFICIENCIES AND OBSERVATIONS FOR LASALLE 1 AND 2 Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals # lotals ( )

A summary of occurrences (immediate cause 4 (10) and effect) was not included or was inadequate A summary of plant, system, and/or personnel 0 (3) responses was not included or was inadequate.

a. Summary of plant responses was not included or was inadequate.
b. Summary of system responses was not included or was inadequate.
c. Summary of personnel responses was not included or was inadequate.

A summary of the root cause of the event 3 (10) was not included or was inadequate.

A summary of the corrective actions taken or 3 (10) planned as a result of the event was not included or was inadequate.

S 4

- --, , ---- - - ------ r ~-,n-- , -- ,

TABLE C-2. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph a

Description of Deficiencies and Observations Totals Totals ( )

Abstract presentation inadequacies 4 (10)

a. OBSERVATION: The abstract contains 2 information not included in the text.

The abstract is intended to be a summary of the text, therefore, the text should discuss all information summarized in the abstract.

b. The abstract was greater ther. 0 1400 characters
c. The abstract contains undefined 0 acronyms and/or plant specific designators.
d. The abstract contains other specific 2 deficiencies (i.e., poor summarization, contradictions, etc.)
a. The "sub-paragraph total" is a tabulation of specific deficiencies or observations within certain requirements. Since an LER can have more than one deficiency for certain requirements, the sub-paragraph totals do not necessarily add up to the paragraph total.
b. The " paragraph total" is the number of LERs that have one or more deficiency or observation. The number in parenthesis is the number of LERs for which a certain requirement was considered applicable.

TABLE C-3.

CODED FIELDS DEFICIENCIES AND OBSERVATIONS FOR LASALLE 1 AND 2 Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals' Totals ( )

Facility Name 0 (10)

a. Unit number was not included or incorrect,
b. Name was not included or was incorrect.
c. Additional unit numbers were included but not required.

Docket Number was not included or was 0 (10) incorrect.

Page Number was not included or was t r.c or r ec t .

0 (10)

Title was left blank or was inadequate 9 (10)

a. Root cause was not given in title 7
b. Result (effect) was not given in title 3
c. Link was not given in title 0 Event Date 0 (10)

> a. Date not included or was incorrect.

b. Discovery date given instead of event date.

LER Number was not included or was incorrect 0 (10)

Report Date 1 (10)

a. Date not included 0
b. OBSERVATION: Report date was not 1 within thirty days of event date (or discovery date if appropriate).

Other Facilities information in field is 3 (10) inconsistent with text and/or abstract.

Operating Mode was not included or was inconsistent with text or abstract. 0 (10)

TABLE C-3. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph Description of Deficiencies and Observations Totals' Totals ( )

Power level was not included or was 0 (10) inconsistent with text or abstract Reporting Requirements 2 (10)

a. The reason for checking the "0THER" 0 requirenent was not specified in the abstract and/or text.
b. OBSERVATION: It may have been more 0 appropriate to report the event under a different paragraph.
c. OBSERVATION: It may have been 2 appropriate to report this event under an additional unchecked paragraph.

Licensee Contact 6 (10)

a. Field left blank 0
b. Position title was not included 6
c. Name was not included 0
d. Phone number was not included. O Coded Component failure Infornation 7 (10)
a. One or more component failure i sub-fields were left blank.
b. Cause, system, and/or component code 1 is inconsistent with text.
c. Component failure field contains data 5 when no component failure occurred.
d. Component failure occurred but entire 0 field left blank.

TABLE C-3. (continued)

Number of LERs with Deficiencies and Observations Sub-paragraph Paragraph a

Description of Deficiencies and Observations Totals Totals ( )D Supplemental Report 1 (10)

a. Neither "Yes"/"No" block of the 0 supplemental report field was checked.
b. The block checked was inconsistent 1 with the text.

Expected submission date inf ormation is 0 (10) inconsistent with the block checked in Item (14).

a. The "sub-paragraph total" is a tabulation of specific deficiencies or observations within certain requirements. Since an LER can have more than one deficiency for certain requirements, the sub-paragraph totals do not necessarily add up to the paragraph total.
b. The " paragraph total" is the number of LERs that have one or more requirement deficiencies or observations. The number in parenthesis is the number of LERs for which a certain requirement was considered applicable.

APPENDIX D LER COMMENT SHEETS FOR LASALLE 1 and 2

TABLE D-1.

SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

1. LER Nur, 85-063-01 Scores: Teat - 9.0 Abstract = 9.1 Coded Fields - 8.6 Overall = 9.0 Text 1. 50.73(b)(2)(ii)(D)--The root and/or intermediate cause discussion concerning the clogged orifice is not included.
2. 50.73(b)(4)--Discussion of corrective actions taken or planned is inadequate. The text should discuss whether or not anything needs to be done to prevent

, the orifice from clogging again.

Abstract 1. No comments.

Coded Fields 1. Item (4)--Title: Root cause is not included. It is best not to use acronyms in the title. A better title might be " Spurious Trip of the Control Room Chlorine Detector due to a Clogged Detector Orifice".

2. Item (8)--Infornation in field is inconsistent with text and/or abstract. The text and abstract do not clarify how Unit 2 was affected. Is the control room a common facility to both units?
3. Item (12)--Position title is not included.

l

TABLE D-1. SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

2. LER Number: 85-066-00 Scores: Text 8.9 Abstract -9.2 Coded Fields 9.2 Overall - 9.0 Text 1. OBSERVATION: Scores for this LER are based on the assumption that the supplemental report will contain all the necessary information.
2. 50.73(b)(2)(ii)(F)--EIIS codes are required for each component and system referred to in the text. Codes should be provided for the valves mentioned in the text.
3. 50.73(b)(2)(ti)(L)--Identification (e.g. manufacturer and model no.) of the failed component (s) discussed in the text is not included.
4. The use of an outline format is very good.

Abstract 1. 50.73(b)(11--Summary of occurrences [immediate cause(s) and effects (s)] is inadequate. The abstract should state that the leak rate is in excess allowed by Technical Specifications.

Coded Fields 1. Item (41--Title: Root cause is not included. "Cause Unknown" can be included in the title.

2. Item (ll)--0BSERVATION: It appears it would have been appropriate to also report this event under paragraph (s) 50.73(a)(2)(1)(B).
3. Item (12)--Position title is not included.
4. Item (131--Cause, system, and/or component code is inconsistent with text. Since the cause of the failure is not known at this time, X nay be a more appropriate cause code.

TABLE D-1.

SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

3. LER Number: 85-069-00 Scores: Text - 8.6 Abstract - 9.4 Coded Fields = 8.8 Overall = 8.8 Text 1. 50.73(b)(2)(ii)(C)--Time information for major occurrences is inadequate. The time that the uninspected fire hose stations were declared inoperable should have been provided, given that T.S. 3.7.5.4 has a 1-hour Action Statement.
2. 50.73(b)(2)(ii)(I)--Discussion of the method of discovery of the overdue surveillance is not included. Who notified the Station Fire Marshall and the Unit 1 Operating Engineer?
3. 50.73(b)(2)(ii)(J)(21--Discussion of the personnel error is inadequate.

50.73(b)(2)(ii)(J)(2)(i)--Discussion as to whether the persoanel error was cognitive or procedural is not included.

4. 50.73(b)(3)--Discussion of the assessment of the safety consequences and implications of the event is inadequate. If all required fire equipment had not been at the fire hose station as required, was there any other system or method of providing fire protection to those areas that would nnrmally be protected by the hose stations?
5. 50.73(b)(4)--Discussion of corrective actions taken or planned is inadequate. Given the four previous occurrences of a similar nature, is the/e a need for some procedure changes involving the General Surveillance Program? Will all future personnel (required to schedule, perform, or ensure turnover) receive the necessary training to prevent recurrence of this event?
6. Some conclusions reached are inconsistent witt, the facts presented. It is not clear why the temporary surveillance foreman decided his manpower wa's insufficient, given he had a crew of 12 instead of the normal of 6.

TABLE D-1.

SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

3. LER Number: 85-069-00 (continued)

Abstract 1.

The abstract should contain the "date" information that was presented in the text so that the reader will have an idea of the time-history of the event.

Coded Fields 1.

Item (4)--The title should indicate that the missed surveillance is a Technical Specification violation.

2. Item (8)--It is not apparent f rom the inf ormation provided in the text why LaSalle Unit 2 was named as another facility that was directly affected by (involved in) the event.

3.

Item (12)--Position title is not included.

4. Item (13)--Component failure field contains data Lt no component failure occurred.

TABLE D-1. SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

4. LER Number: 86-002-00 Scores: Text - 8.2 Abstract - 8.0 Coded Fields - 8.5 Overall = 8.1 Text 1. 50.73(b)(2)(ii)(F)--The text did not include the Ells component codes for each component referred to in the text.
2. 50.73(b)(2)(ii)(H)--A time estimate of the unavailability of the failed system is not included.
3. 50.73(b)(3)--Discussion of the assessment of the safety consequences and implications of the event is inadequate. The assessment should indicate whether or not the 14 SRV's, which would open before SRV 1821-F013U, are adequate to handle any possible pressure transient. If the 14 valves are not sufficient protection, then the assessment should assess the effect of the late opening of SRVs 1821-F013U, E, and H.
4. 50.73(b)(4)--Discussion of corrective actions taken or planned is inadequate.

A discussion of actions required to reduce the probability of recurrence (i.e, correction of the root cause) is not included or is inadequate. Could anythingbedoneto,)inimizetheforeignmaterial, dirt, and rust in the system? Could surveillance be done with less pressure differential across the valves?

Abstract 1. 50.73(b)(1)--Summary of root cause is inadequate.

The foreign material, dirt, and rust, as well as, the high differential pressure during surveillance cycling should be mentioned.

2. OBSERVATION: The abstract contains information not included in the text. The abstract is intended to be a summary of the text; therefore, the text should discuss all information summarized in the abstract.

The third paragraph in the abstract addresses the text deficiency discussed in text comment 3.

TABL E D-1.

SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

4. LER Number: 86-002-00 (continued)

Coded Fields 1. Item (4)--Title: Root cause is not included.

2. Item ill)--0BSERVATION: It appears it would have been appropriate to also report this event under paragraph (s) 50.73(a)(2)(1) and 50.73(a)(2)(vii).
3. Item (13)--Where all three valves are identical and in identical systems only one line needs to be filled in for the three valves.

l

TABLE D-1.

SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

5. LER Number: 86-003-00 Scores: Text - 9.3 Abstract - 9.2 Coded Fields - 9.4 Overall - 9.3 Text 1. Since the initiating problem that led to the missed Technical Specification surveillance was the no flow condition through the sample line, the cause and corrective action for this should be discussed.

Abstract 1. 50.73(b)(1)--See text comment 1.

Coded Fields 1. Item (4)--Title: Result is not included. The title should indicate the missed surveillance was required by the Technical Specifications.

2. Item (13)--Cause, system, and/or component code is inconsistent with text. The text does not indicate the sample panel failed due to personnel error.

i

l l

1

TABLE D-1. SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

6. LER Number: 86-004-00 Scores: Text = 8.7 Abstract = 7.6 Coded Fields = 9.8 Overall = 8.5 Text 1. 50.73(b)(2)(ti)(E)--The effect discussion of each failed component is inadequate. The ESF actuation should have been described in the first sentence of Section I.Section III implies that the ammonia alarm resulted in the "A" HVAC train going to the recirculation mode but Section I implies that the "A" HVAC train was already in the recirculation mode at the time of the event (i.e., at 1917 on February 5, 1986). It is also not clear whether the trip of the chlorine detector causes only an alarm or would also cause an ESF actuation (had the signal not already been present from the ammonia detector).
2. 50.73(b)(2)(ii)(F )--The Energy Industry Identification System component function identifier (s) and/or system name of each component or system referred to in the LER is not included.
3. 50.73(b)(2)(ii)(J)(2)--It appears that personnel error is involved in this event, but it is not discussed. It appears that the non-licensed operator reset the wrong detector by mistake.
4. 50.73(b)(4)--Discussion of corrective actions taken or planned is inadequate.

A discussion of actions required to reduce the probability of recurrence (i.e, correction of the root cause) is not included or is inadequate.

What will the warning sign on the four chlorine detectors say? If the reader knew this, he would probably have the answer to the concern expressed in text comment number 1.

5. Some ideas are not presented clearly (hard to  !

follow). For example, the second paragraph in I Section II states that " Optical equipment compares the exposed tape portion to an exposed section of the tape - ".

1

,- ,,n -

-w--n,,-.,-. - ,- - - - - -- - , , - - , - , , -,e-,-,-- , - - ,v-- ----n , - - - - , . -

,,-,---,--,,,,-y--e----

TABLE D-1. SPECIFIC LER COMMENTS FOR LASALLE 1 (373)

Section Comments

6. LER Number: 86-004-00 (continued)
6. A logical transition does not exist between all ideas. "0 dor eaters" are introduced in Section I but not defined until Section III.
7. Acronym (s) and/or plant specific designator (s) are undefined. What is AIR 373-200-86-01200?
8. It is not apparent which system the ammonia detector is associated with, (i.e., "VI", "VC", or "VE").

Abstract 1. 50.73(b)(1)--Summary of occurrences [immediate cause(s) and effects (s)) is inadequate. The chlorine detector occurrence should have been mentioned.

2. 50.73(b)(1)--Summary of the root cause of the tape breakage is not included.
3. 50.73(b)(1)--Summary of corrective actions taken or planned as a result of the event is inadequate. See text comment number 4.
4. Abstract contradicts the text. The " hour" of the ammonia detector trip is different in the abstract.

In addition see the second sentence of text comment number 1.

Coded Fields 1. Item (8)--It is not apparent from the text how Unit 2 is directly affected by the event; (it is assumed that the control room is common to both units, but this is not stated in the text).

2. Item (13)--One or more component failure sub-fields are blank; namely the manufacturer of the detector.

TABLE D-1.

SPECIFIC LER COMMENTS FOR LASALLE 2 (374)

Section Comments

7. LER Number: 85-044-00 Scores: Text = 9.1 Abstract = 9.7 Coded Fields - 9.0 Overall = 9.3 Text 1. 50.73(b)(2)(ii)(F)--The EIIS component codes for each component referred to in the text were not included.

The presentation of plant acronyms and EIIS system codes together is confusing.

2. 50.73(b)(2)(11)(L)--Identification (e.g. manufacturer and model no.) of the failed component (s) discussed in the text is not included. The manufacturer and model number of the timer are not included.

Abstract 1. No comments.

Coded Fields 1. Item (4)--Title: Root cause is not included. It is

' best not to use acronyms in the title.

2. Item (121--Position title is not included.
3. Item (13)--The first line is appropriate, but the partially filled in second line should be left out.

TABLE 0-1.

SPECIFIC LER COMMENTS FOR LASALLE 2 (374)

Section Comments

8. LER Number: 85-046-00 Scores: Text = 9.5 Abstract = 8.8 Coded Fields = 9.0 Overall = 9.2 lext 1. No comment.

Abstract 1. 50.73(b)(1)--Summary of occurrences [immediate cause(s) and effects (s)] is inadequate. The abstract should state that this was a condition prohibited by the Technical Specificatiols.

2. OBSERVATION: The abstract contains information not included in the text. The abstract is intended to be a summary of the text; therefore, the text should discuss all infornaticn summarized in the abstract.

The information in last sentence is not included in the text.

Coded Fields 1. Item (4)--Title: Root cause is not included.

2. Item (71--0BCERVATION: Report date is not within thirty days of event date (or discovery date if appropriate).

, 3. Item (121--Position title is not included.

4. Item (13)--Component failure field contains data when no component failure occurred.

J

TABLE D-1. SPECIFIC LER COMMENTS FOR LASALLE 2 (374)

Section Comments s

9. LER Number: 85-047-00 Scores: Text 7.6 Abstract = 8.5 Coded Fields = 8.6 Overall = 8.0 Text 1. 50.73(b)(2)(ii)(F)--The Energy Industry Identification System component function identifier (s) and/or system name of each component or

! system referred to in the LER is not included. No code is provided for the components referred to in the text.

2. 50.73(b)(2)(ii)(I)--Discussion of the method of discovery of the missed samples is not included.

When and how was it determined that the samples had not been taken as required?

3. 50.73(b)(2)(ii)(J)(2)--Discussion of the personnel error is inadequate. Was it a cognitive or procedural error (or a part of the work request) that resulted in the decision by the Shift Foreman to leave the RHR SW system running.
4. 50.73(b)(3)--Discussion of the assessment of the safety consequences and implications of the event is inadequate. What would have been the consequences, if any, of the system.becoming contaminated (radioactively) during the period that the system was not monitored?
5. 50.73(b)(4)--Discussion of corrective actions taken or planned is inadequate.

A supplemental report appears to be needed to describe the corrective actions that result from AIR 374-200-85-13100 and 13101. Without a commitment to submit a supplemental report, this LER must be considered incomplete. What interim corrective actions were taken? Is there a need to provide all operators with additional information concerning the use of the time clock easel?

6. Acronym (s) and/or plant specific designator (s) are undefined; (NS0).

e TABLE D-1. SPECIFIC LER COMMENTS FOR LASALLE 2 (374)

Section Comments

9. LER Number: 85-047-00 (continued)

Abstract 1. 50.73(b)(1)--Summary of occurrences [immediate cause(s) and effects (s)] is inadequate. The tie between the test failure and the decision to leave the RHR SW system running should be provided. See text comment number 3.

2. 50.73(b)(1)--Summary of corrective actions taken or planned as a result of the event is inadequate.

AIR 374-200-85-13101 should have been mentioned.

Coded Fields 1. Item (4)--Title: Root cause (inadequate shift turnover procedures) and end result (Technical Specification violation) are not included.

2. _ Item (12)--Position title is not included.
3. Item fl3)--Component failure field contains data when no component failure occurred.
4. Item (14)--The block checked is inconsistent with information in the text. See text comment number 5.

TABLE D-1.

SPECIFIC LER COMMENTS FOR LASALLE 2 (374)

Section _.

Comments

10. LER Number: 85-048-00 Scores: Text - 8.9 Abstract = 10.0 Coded Fields - 9.0 Overall = 9.3 Text 1.

_50.73f b)(2)(ii)(F )--The Energy Indus try Identification System component function identifier (s) and/or system name of each component or system referred to in the LER is not included.

2.

50.73(b)(2)(ii)(L)--Identification (e.g. manufacturer and model no.) of the failed component (s) discussed in the text is not included.

Abstract 1. No comments.

Coded Fields 1. Item (41--Title: Root cause (unknown is not included. It is best not to use acron)yms in the title.