ML20154N267

From kanterella
Jump to navigation Jump to search
Confirmatory Action Ltr 88-23 Discussing NRC Understanding of Actions Licensee Will Take to Correct Weaknesses Noted in Insps Re Radiation Protection,Facility Operations & Mgt Controls,Per 880908 & 09 Telcons
ML20154N267
Person / Time
Site: 07001100
Issue date: 09/09/1988
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Brewer S
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
CAL-88-23, EA-88-193, NUDOCS 8809290254
Download: ML20154N267 (3)


Text

- ,

.., \. ,

N*

SEP 0 91933 l-Docket No. 70-1100 CAL No. 88-23 l EA No.88-193 ,

Combustion Engineering, Inc.

ATTN: Mr. Shelby T. Brewer Executive Vier "resident Nuclear Power .fstems Division 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Gentlemen:

Subject:

Confirmatory Action Letter 88-23 During NRC inspections conducted at the Combustion Engineering Fuel Manu-facturing facility in Windsor, Connecticut over the past 10 months, serious weaknesses were identified in the itplementation of your licensed program.

Weaknesses which require your immediate attention include those related to radiation protection, facility operations and management controls. Because of these weaknesses, Mr. Stewart Ebneter of my staff visited your facility or, August 15, 1988 and had a telephone discussion with you on September 8 ar.d 9, 1988, regarding the actions you will take to correct these weaknesses.

Although some program upgrades and improvements have been made during the past 10 months, Combustion Engineering recognizes the need for (1) acceleration of the pace at which the programmatic upgrades are occurring to rapidly bring the facility into compliance with NRC regulations and license requirements and (2) an independent assessment of the facility as daf f ned in your August 26, 1988 j letter by a task force independent of the fuel facility staff to identify the full scope of needed facility changes to preclude future regulatory violations.

Based on that meeting and the subsequent telephone discussions, we understand that you have undertaken, or will undertake, and complete the following actions:

1. You will prepare and document a Performance Improvement Plan (PIP) and submit it to the NRC Region I Regional Administrator, within 45 days of the date of this letter. The PIP will be reviewed and approved by ap-propriate Combustion Engin tering upper level managerrent. The PIP should identify and integrate into a si actions required to bring the Ia,ngle cility comprehensive into compliance plan with all significant regulatory requirements, including those to which you have 07eviously committed, with a scheduled completion date for each item. The deficiencies identified by the NRC include those which were the subject of Confirmatory Action Letter No. 87-14, Inspection Report No. 70-1100/87-05.- Inspection Report No.

70-1100/83-03, Inspection Report No. 70-1100/?8-05 and 70-1100/83-06, and the issues discussed during the December 1, 1937, May 10 and August 3, 19SS meetings at Region I.

8509290254 000909 PDR ADOCK 07001100 C pm tQ OFFICIAL RECORD COPY CAL 88 0001.0.0 08/26/88 g 3g

e 1 .. ..  ;

i Combustion Engineering, Inc. 2 SEP 0 91939

'i 7

J 1 2. You will formally plan, perform and document by December 31, 1988, a  ;

i self-assessment, as described in your August 26, 1988 letter, of the root ,

q causes of (a) the deficiencies identified by the NRC during the past 10 '

l months and (b) the reasons why Combustion Engineering managwent has not i been effective in recognizing and remedying these problems. The. assessment  ;

will include a comprehensive review of all regulatory requirements related  :

to the facility license as stated in the Task Force Charter. In addition, I J as part of the the assessment, you will confirm that program changes i required to bring the facility into compliance, and assure continued compliance, are implemented.

i

} 3. Within 30 days of your submittal of the proposed PIP discussed in Item 1, [

3 you will meet with the NRC Region ! staff to present ano discuss its l

status and implementation, j i
4. Within 30 days after completion of the assessment indicated in Item 2, (

i you will submit to the NRC Region ! Regional Administrator, an updated i PIP. Included with the updated PIP will be a report summarizing the

(

assessment findings, recommendations for any additional improvements I identified by the assessment, and plans and schedules for completion of l these recommended improvements. (

[

5. You will provide a written monthly report that documents the status of the  !

PIP and independent task force by the end of each calendar month to the i NRC Region I Regional Administrator. These reports will be provided until .

] all programmatic upgrades are completed. Each calendar quarter, your staff will schedule a meeting with Region I staff to provide feedback on  !

l the status of completion of your PIP.

i i Issuance of this Confirmatory Action Letter does not preclude the issuance  !

! of an Order, if deemed necessary by the NRC, to effect the required improvement i

in your licensed program, j The responses directed by this letter are not subject to the clearance pro- f
cedures of the Office of Management and Budget, as required by the Paperwork  ;

I Reduction Act of 1980, PL 96-511.  ;

\

! If our understanding of your planned actions described abeve is not in ac- l 1 cordance with your actual plans and actions being implemented, please notify j

]

this office by telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of receipt of this letter, j  !

)

t i l 1 t l i I

I I f

! 0FFICIAL RECORD COPY CAL 88 0001.1.0 l l 08/26/83 [

! l

, i i _ - , _ . -*

0

<* 0

,,.1 SEP 0 91958 Combustion Engineering, Inc. 3 Your cooperation with us regarding this matter is appreciated.

Sincerely, Oricinal Signed By William T. Russell Regional Administrator cc:

Dr. P. L. McGill, Vice President - Nuclear Fuel F. Stern, Vice President, Nuclear Fuel Manufacturing A. E. Scherer, Director, Nuclear Licensing C. 5. Brinkman, Manager, Washington Nuclear Operations Public Document Room (POR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NS!C)

State of Connecticut bec:

Region I Docket Room (with concurrences)

Management Assistant, ORMA (w/o enc 1)

Robert J. Bores, DRSS J. Roth, DRSS G. Bidinger, NMSS D. Holody, FS, RI J. Gutierrez, RC, RI J. Allan, DRA, RI W. Russell, RA, RI J, Lieberman, OE J. Goldberg, OGC R. Cunningham, t. MSS K. Abraham, PAO, R!

J. Gresick, RI M. Shanbaky, RI R. Bellamy, RI V. Pasciak, RI M. Austin, RI

4

~

j p Hh *!!

\ f NSS RI:0RSS R RSS wab; RI:ES R ORSS h(t astjak Bellamy Ebneter 6 % Holody

%th/sij ,

9/'I/S3 9/$/83 9 /S3 @vg 9/ '/83

$/g'/S3 RI: RCp3a d' h+ RhpA/- m R!:RNy')l/ .H e r g,

A rrez A1}an Russell 9/j/83 9/Q/83 9/f/88

/ OFFICIAL RECLR0 COPY CAL 83 0002.0.0 0S/26/83

-.