Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-1100/89-04
ML19325D583
Person / Time
Site: 07001100
Issue date: 10/11/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgill P
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 8910250069
Download: ML19325D583 (2)


Text

y g.

w Q

f \\; f., y, x '

y, N[

'L j

.4 v. '

3, OCT 11 1989 s

F Docket No. 70-1100 Combustion Engineering, Inc.

I O

ATTN:

Dr. P. L. McGill Vice President - Nuclear Fuel Manufacturing Nuclear. Power Systems i

1000 Prospect Hill Road Windsor, Connecticut- 06095-0500 j

e

. Gentlemen:

Subject:

Inspection No.

70-;100/89-04 This refers to your letter dated September 14, 1989, in response to our' letter I

dated August 16, 1989.-

Thank you for informing us of the corrective and' preventive actions documented in your letter. These actions will be examined during a future iaspection of your li. censed program.

t

-Your cooperation'wlth us is appreciated.

Sincerely, OR&mt S'2ncd Dy:

Ronald R. Bellamy

?

Ronald R. Bellamy, Chief Facilities Radiological Safety and Safeguards Branch i

Division of Radiation Safety and Safeguards 1

cc:

A. E. Scherer, Director, Nuclear Licensing C. B. Brinkman, Manager, Washington Nuclear Operations i

Public Document Room (PDR) i Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

. State of Connecticut 1

I[,

0FFICIAL RECORD COPY RL CE 89 0001.

10/02/89 16i\\

8910250069 801011

)

PDR ADOCK 07001100 d

C PDC

y.

h o.:

J..g, 4.-

}. -', 6 l

Combustion Engineering, Inc.

2 OCT 11 1989-h' bec w/ enc 1:

m.

Region I Docket Room (with concurrences)

Management Asststant, DRMA (w/o enc 1) u J. Roth; DRSS G Bidinger, NMSS-L L.

t.

^

j 1

e i

i i

l hs RI DRSS RI:DRSS RI S

Bellamy

) yner 10/ 3 /89 10/ f/89 10/)D/89 10/ll/89 9

0FFICIAL RECORD COPY RL CE 89 0002.0.0 10/02/89 l

1

t j& % 4

t ENGINEERgNS September 14, 1989

)

LD-89-103 Docket No. 70-1100 License No. SNM-1067 Dr. Ronald R. Bellamy, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and Safeguards U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, Pennsylvania 19406

Subject:

- Response to Notice of Violation (Inspection Report No. 70-1100/89-04)

Reference:

.' Letter, R. R. Bellamy (NRC) to P. L. McGill (C-E),

dated August 16, 1989

Dear Dr. Bellamy:

Combustion Engineering has reviewed the Notice of Violation received with the referenced letter and our reply is provided nerewith (Enclosure).

If I can be of further assistance on this matter, please do not hesitate to call me of Mr. J. F. Conant of my staff at (203) 285-5002.

Very truly yours, COMBUSTION ENGINEERING, INC.

A' W Scherer Director Nuclear Licensing AES:jeb p

Enclosure:

As stated cc:

D. McCaughey (NRC)

J. Roth (NRC - Region I)

Power Systems li EProspect Hill Road (203) 688 1911 Combustion Engineonng, Inc.

Pmt Office Box 500 Telex: 99297

  1. ndsor, Connecticut 06095-0500
N.c'v Enclosure to LD-89-103 T

Response to Notice of Violation (NRC Inspection Report No. 70-1100/89-04)

Statement of Violation Condition 21 of License No. SNM-1067 requires:

"The licensee shall maintain and execute the response measures of his Radiological Contingency Plan submitted to the Commission on June 7,.1982.

The licensee shall maintain implementing procedures for his Radiological i

Contingency Plan as necessary to implement the Plan."

Section 7.3 of this Plan, entitled " Test and Drills", s,tates, in part:

" Semi-annual site emergency evacuation drills are conducted to test promptness of response, adequacy of procedures, emergency equipment, and the overall effectiveness of the emorgency plan.

At least one of the two drills given annually will be part of an over.111 exercise that involves participation by off-site agencies to test as a minimum the communication links and notification procedures."

l Contrary to the above, in 1988, the licensee failed to conduct a drill that was part of an overall exercise involving participation by off-site agencies.

Response

j Combustion Engineering, Inc. recognizes that the Radiological Contingency Plan requires that one of the two annual facility evacuation l'

drills include participation of off-site agencies to test, as a minimum, the communication link and notification procedures. We believed, however, that the test of this requirement was successfully demonstrated during each of the six times that we actually requested L

assistance from off-site support agencies (i.e., Fire, Police, Ambulance)

~

l for our fuel manufacturing facility in 1988.

l Nevertheless, it is planned that the next facility emergency evacuation j

drill.to be conducted during 1989 will include the participation of off-site support agencies to test the communication system and notification procedures.

Compliance with the subject license L.

requirement will, therefore, be satisfied for 1989 upon completion of l'

this drill. In future years, tests of the communication link and notification system will be conducted in strict accordance with the Emergency Response Plan in effect at the time.

. _,