Forwards Insp Rept 70-1100/90-06 on 900613-14.Insp Performed to Review Addl Info Provided Re Violations in Insp Rept 70-1100/90-03.Two Violations Noted Withdrawn
ML20058M393
Person / Time
Site: 07001100
Issue date: 08/01/1990
From: Knapp M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Waterman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20058M396 List:
References
NUDOCS 9008100097
Download: ML20058M393 (2)


Text

k e

AUG 011990 t

Docket No. 70-1100 t

Combustion Engineering, Inc.

ATTN: Mr. C. R. Waterman Acting Vice President - Nuclear Fuel Nuclear Power Systems 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Gentlemen:

Subject:

Inspection No. 70-1100/90-06 On April 20, 1990, we transmitted to you NRC Region 1 Inspection Report No.

70-1100/90-03 and associated Notice of Violation.

In a letter dated May 11, 1990, you stated that five of the six violations cited in that Notice of Violation may be unwarranted because of additional information developed subsequent to the inspection. On June 13-14, 1990, Messrs. M. Austin and P. O'Connell of this office performed a special inspection to review the additional information.

The inspection consisted of selected examination of proccdures and representative records, interviews with personnel, and observations and measurements by the inspectors.

Based an the results of the June 13-14, 1990, inspection, we have concluded, for the reasons provided in the enclosed inspection report, that two of the violations (identified in the aforementioned Notice of Violation as Items 0 and F) should be withdrawn. Your enforcement history will be adjusted accordingly.

However, as also explained in the enclosed inspection report, we have concluded that items A, C and E should remain as originally cited. While your corrective actions for Item E were adequate and this item was closed out during the June 13-14, inspection, you are hereby required to submit to this office, within. thirty days of the date of this letter, a written statement or explanation in reply to Items A and C.

Your response must include:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.

9008100097 900801

)Q' PDR ADOCK 07001100 C-PDC 0FFICIAL RECORD COPY IR CE 90/06 - 0001.0.0 g g e

07/30/90

) y IL.

m

=

Combustion Engineering, Inc.

2 AUG 011990 Your cooperation with us is appreciated.

Sincerely, (gGMED)13Al.000A R INN Malcolm R. Knapp, Director Division of Radiation Safety.

and Safeguards

?

Enclosure:

l NRC Region I Inspection Report No. 70-1100/90-06 cc w/ enc 1:'

A. E. Scherer, Vice President, Quality Systems i

C. B. Brinkman, Manager, Washington Nuclear Operations Public Document Room (PDR)

Local Public Document Room (LPDR)

NuclearSafetyInformationCenter(NSIC)

State of Connecticut bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

J. Roth, DRSS G. Bidinger, NMS$

K. Abraham, (2)-All Inspection Reports R. Bellamy, DRSS J Joyner, DRSS 0(lid 0(%l Q'

RI:DRSS RI:DRSS

[)RI:DRSS RI:DRSS RI:DRSS I

.tgAustin O'Connell (-' 4 Bores Paciak Bellamy

/

Cta 7/D /90 7/h/9 Z/)(/90 4/ /90 7ld/90 9

7 S

RI:p oyn Knapf 07[)f/90 08/l0FFICIALRECORDCOPY

/90 IR CE 90/06 - 0002.0.0 07/30/90