ML20217Q300

From kanterella
Jump to navigation Jump to search

Submits Response to Questions on Amend Request to Downgrade License SNM-1067.Description of Revs to Submittal in ,List of Pages of Ltr to Be Replaced,Listing of Resulting Effective Pages of Pending Application & Changes,Encl
ML20217Q300
Person / Time
Site: 07001100
Issue date: 08/21/1997
From: Rickard I
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To: Weber M
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
TAC-L30875, NUDOCS 9709020299
Download: ML20217Q300 (9)


Text

-

ABB ASEA BROWN BOVE RI Docket No. 701100 August 21,1997 License No. SNM 1067 TAC No. L30875 Mr. Michael F. Weber, Chief Licensing Branch Division of Fuel Cycle Safety and Safeguards Office of Nuclear Materials Safety and Safeguards U. S. Nuclear Regulatory Commission Wash >gton, D. C. 20555

Subject:

Response To Questions On Amendment Request To Dowrgrade License No. SNM-1067

References:

(A)

Letter, l. C. Rickard (CE) to M. F. Weber (NRC),

" Amendment Request To Downgrade SNM License,"

dated April 16,1997.

Dear Mr. Weber:

In Reference (A), CE requested a downgrade of License SNM 1067 to reflect the proposed reduction in activities and material possession authorization and the transfer of laboratory activities to the Windsor site Broad Scope License. This letter is in response to discussions between CE and the NRC staff about Reference (A). As a result of the discussions, CE would make changes on two pages of the Reference (A) submittal in order to clarify the definition of the specified storage areas for LLRW.

Enclosure (1) provides a description of the revisions to the submittal In Reference (A). Enclosure (2) provides a list of the pages of the Reference (A) submittal that would be replaced. Enclosure (3) provides a listing of the resulting effective pages of the pending Application. Enclosure (4) provides the two pages containing the changes. Six (6) copies are enclosed for your use.

9709020299 970821 PDR ADOCK 07001100 C

PDR g g(t38 h5IkN}IlIM ABB Combustion Engineering Nuclear Power Combuston Engmeering. IN H Rmd Te t 3 (4B.1911 Winoscr. Connecticut 00095 0500 Teien 99297 COMBEN WSOR

e 9

If there are questions or comments regarding this matter, please feel froo to contact me or Mr. J. F. Conant at (860) 285 5002.

Very truly yours, COMBUSTION EN RING, INC.

(1001C l.

. Rick D

or of Operations Licensing ABB CE Nuclear Operations xc:

Dr. S. Soong (NRC)

J. J. Kottan (NRC Region I)

Enclosures:

As stated

August 21,1997 Enclosure (1)

COMBUSTION ENGINEERING,INC.

WINDSOR SPECIAL NUCLEAR MATERIAL LICENSE RESPONSE TO QUESTIONS ON THE AMENDMENT REQUEST TO DOWNGRADE LICENSE NO. SNM 1067 EXPLANATION OF CHANGES This amendment request would revise the definition of Specified Storage Areas for LLRW on the Windsor site that was given by the footnote to Section 1.5 in the submittal dated 4/16/

The revised definition would incomorate the wording for Interim storage requirements that is in Section 4.1.1 of the currently approved application, datnd 10/31/96. The revised definition would still include the paved area in the wooded section of the Windsor site where repackaging of LLRW may be performed. The definition would also still inc!ude the areas in the DOE FUSRAP-designated Building 3 and its environs where material collected by CE from the Windsor site is held in interim storage.

The material held in interim storage would satisfy the requirement given in Section 4.1.1. Instead of refering to the definition for storage areas given in the footnote to Section 1.5, the description of the requirements for interim storage in Section 4.1.1 would be changed back to the description given in that section of the approved application, dated 10/31/96.

4 August 21,1997 Enclosure (2)

COMBUSTION ENGINEERING, INC.

WINDSOR SPECIAL NUCLEAR MATERIALS LICENSE RESPONSE TO QUESTIONS ON THE AMENDMENT REQUEST TO DOWNGRADE LICENSE NO. SNM 1067 LIST OF AFFECTED PAGES Combustion Engineering, Inc. revised all the pages of the Application with the Amendment Request dated April 16,1997. This current request would revise two pages of that submittal by replacing the pages. The pages of the pending Application Amendment and the pages of this Amendment Request which replace them are listed below:

DELETE PAGES ADD PAGES EA9a Rain Eage Data 13 04/16/97 13 08/21/97 41 04/16/97 41 08/21/97

August 21,1997 Enclosure (3)

COMBUSTION ENGINEERING, INC.

WINDSOR SPECIAL NUCLEAR MATERIALS LICENSE RESPONSE TO QUESTIONS ON THE AMENDMENT REQUEST TO DOWNGRADE LICENSE NO. SNM 1067 LIST OF EFFECTIVE PAGES Combustion Engineering, Inc. Is revising two pages of the Amor dment Roquest dated April 16,1997. All other pages of the Amendment Roquest are unchanged.

The followin9 is a comprehensivo List of Effectivo Pages for the rotelting Application.

Paang Data PaQOS lal2 Chanter 2 License Annlication Title Pano 21 04/16/07 1

04/16/97 22 04/16/97 23 04/16/97 2-4 04/16/97 Table of Contents 2-5 04/16/97 il 04/16/97 til 04/16/07 Chanter 3 3-1 04/16/97 Part i Title Paae 3-2 04/16/97 3-3 04/16/97 IV 04/16/97 3-4 04/10/97 35 04/16/97 36 04/16/97 Chaoter 1 37 04/16/97 1-1 04/16/97 1-2 04/16/97 13 08/21/97 Chaoter 4 4-1 08/21/97 42 04/16/97 l

Pages Data Engea Data Chaoter 5 Chr oter 10 51 04/16/97 10 1 04/10/97 i

Part 11 Title Paac Chanter 11 Chapter 6 11 1 04/16/97 6-1 04/16/97 62 04/16/97 63 04/10/97 6-4 04/16/97 65 04/16/97 66 04/16/97 67 04/16/97 68 04/16/97

- 69 04/10/97 Chaoter7 7-1 04/10/97 Chanter 8 81 04/16/97 82 04/16/97 8-3 04/16/97 84 04/16/97 Chanter Q 01 04/16/97 a

1 1

i w

n e----

n -n

,--,-.v,

6iium3 MEED M August 21,1997 Enclosure (4) i l

COMBUSTION ENGINEERING,INC.

WINDSOR SPECIA'. NUCLEAR MATERIALS LICENSE RESPONSE TO QUESTIONS ON THE AMENDMENT REQUEST TO DOWNGRAD5 LICENSE NO. SNM 1067 AFFECTED PAGES

't h

p r

_,-m

a 1.5 AWHORIZED ACTIVITIES The activities carried out with Special Nuclear Material (SNM) at the Windsor Site are limited to activitlet, involving L.t.RW as follows:

Gpecified Storage Packaging, sepackaging, evaluation, storage, handling, Areas * -

e.nd transportation of waste from prior operations for the purpose of SNM 5:entrul. These activities pertain to the material under item 1 of Section 1.4.

Building 21 -

DawnMsh1ng the former commercial nuclear fuel manefactortrig %cihty warehouse under an approved DecommissiMng Plan. This activity pertalr.s to the material under item 2 of Cec 6on 1.4.

1.0 EXEMPTIONS AND SPECIAL AUTHORIZATIONS 1.0.1 In accordance with the exemptions allowed in 10 CFR 70.24(d), the Specified Storage Areas shall be exempt from the requirement of a criticality monitoring system as specified in 10 CFR 70.24(ex1). CE shall separate the wastes into batches no larger than 350 0 contained 235U and shall maintain a minimum separation of 12 feet between batches.

i

  • The Specified Storage Areas cro defined as 1) locked C. vans or trailors and other buildings or enclosures on site: 2) the paved area in tho wooded section of the Windsor site; and 3) the DOE FUSRAP designated Building 3 and its immediate environs. Analyses may be made, under License No. 06-00217 00, on samples of waste.

Licenso No. SNM 1067 Date: 08/21/97 Docket No. 701100 Page: 13

4.0 ENVIRONMENTAL PROTECTION 4.1 EFFLUENT CONTROL SYSTEMS COMMITMENTS 4.1.1 Low level Radioactive Waste Low level radioactive wastes (LLRW) will be packaged in accordance with applicable regulations and delivered to a carrier for transport to an approved waste processor and/or disposal facility. Current copics of processor or oisposal facility licenses shall be maintained.

LLRW packages awaiting shipment to a processor or disposal facility may be temporarily stored for up to one year on site. LLRW packages in such temporary storage will be checked quarterly for Integrity and exterior contamination. LLRW storage areas shall be appropriately posted and LLRW shall be secured from unauthorized removal. Prior to being placed into storage, packages will be checked for exterior contamination and labeled as radioactive material and, for SNM, as to '85U content. LLRW packages may be stored for up to ten years as interim storage provided they are protected from the elements. Interim LLRW storage shall be in locked C vans or trailers and in other buildings or enclosures on site. LLRW in interim storage will be checked annually for integrity end exterior contamination.

Records will be maintained of the contents of the LLRW packages. Ar ratxages will be stored on raised platforms (e.g., built in or portable pallets) or legs and stacking will be limited to three (3) high. When placed into storage, the packages shall be sealed in a manner which precludes casual entry (e.g., by the use of steel clips or strapping) until final sealing is accomplished prior to shipment to the processor or disposal facility.

License No. SNM 1067 Date: 08/21/97 -

Docket No. 701100 Page: 41 -