ML20059C054

From kanterella
Jump to navigation Jump to search
Forwards SALP Rept 70-1100/88-99 on Jul 1988 - Mar 1990. Public Meeting Scheduled to Discuss Assessment.Licensee Should Be Prepared to Discuss Plans to Improve Performance
ML20059C054
Person / Time
Site: 07001100
Issue date: 07/19/1990
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Brewer S
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20059C058 List:
References
NUDOCS 9008310018
Download: ML20059C054 (3)


Text

7 f

(

f lt 2

-JUL 191990

,7 q

Docket No. 70-1100 e

Combustion Engineering, Inc.

ATTN:' Mr. Shelby T. Brewer President-ABB Combustion Engineering Nuclear Power 06095-0500.

1000 Prospect Hill Road Windsor, Connecti. cut j

Gentlemen:-

Subject:

Systematic Assessment of Licensee Performance (SALP) Report No. 70-1100/88-99 a

i An NRC SALP Board conducted a review on May 15, 1990 to evaluate the performance

-h of activities associated with the Windsor Nuclear Fuel Manufacturing facility.

The results of this' assessment are documented in the enclosed SALP Board report.

A public' meeting will be scheduled to discuss this assessment. ~ That meeting is j

. intended to provide a forum for candid discussions relating to any comments you-a

-may have regarding the enclosed report.

At-the meeting, you should be prepared to discuss our assessment and your plans to improve performance.

In particular, you should be prepared to-discuss your i

planned actions relative to implementation of programmatic. improvements,

)

particularly in the areat of radiation protection, emergency preparedness, l

licensing and management controls.

3 l

I l

Any comments-you may have regarding our report may be discussed at the meeting.

._ Additionally, you may provide written comments during the 30-day period af ter the meeting for our consideration in preparing-the final SALP report.

Jl We appreciate your cooperation.

Sincerely,.

m ad DpM 57 8 l

Thomas T. Martin Regional Administrator 1

Enclosure:

SALP Report No. 70-1100/88-99 9008310018 900719 PDR ADOCK 07001100-C PNV kp

'W ' (

00071 OFFICIAL RECORD COPY CE SALP RPT 8899 - 0001.0.0 y

4 05/08/90 wg 1

<3 a

k

' Corr 6ustion Engineering, Incorporated 2 --.

JUL 1 9 1990 I

c.

-ce w/encit

~A. E. Scherer, Vice President, Quality Systems c,

C..B.-Brinkman, Manager, Washington Nuclear Operations C. R. Waterman', Vice President, Nuclear Fuel Public Document Room'(POR)

Local Public Document Room (LPOR)

Nuclear Safety Information Center (NSIC)

State of Connecticut Chairman Carr Commissioner Rogers Commissioner Curtiss Commissioner Remick' l

1 i

1 i

l 1

l 1

1 i

i l

i l'

q

\\ \\ '-

l-j

.j 8

l 0FFICIAL RECORD COPY CE SALP RPT 8899 - 0002.0.0 f

1, 05/08/90 J

.C bustion. Engineering, Incorporated 3

N 195

.bec w/ enc 1:

Region 1 Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

J. koth, DRSS

.i

.M. Austin, DRSS-G. Bidinger, NMSS--

J. Joyner, DRSS R. Be1 lamy, DRSS

.R. Bores, DRSS C. Gordon, DRSS

'A.- Della Ratta, DRSS

~R.'Keimig,:DRSS W. Lazarus, DRSS i

M. Knapp, DRSS R. Cooper, DRSS K. Abraham PA0-(2)

J. Taylor, EDO-H. Thompson, DEDS~

R. Bernero, NMSS J. L'ieberman,- OE R. Cunningham, NMSS B. Davis. RIII~

.. Axelson, RIII W

R; Blough, DRP C. Haughney, NMSS RI:

F S

RI:

S RI SS I:D SS RI:

& tin (Rctr Bore Bellamy oyner Knapp

/ /90 h/jg/90 5/40/90 Mf/90 5/30/90 6t/6 /90 q

2 S

t pfS RI:

M 's

'I'1 MIT d%

D1 BidingeF"-"4kSb Martin 1

if M

Haughney 7/p#/90 hgv ]I\\t1 5/$l/90 5/3f/90 0FFICIAL RECORD COPY CE SALP RPT 8899 - 0002.1.0 05/08/90

,