ML20005G891
ML20005G891 | |
Person / Time | |
---|---|
Site: | 07001100 |
Issue date: | 01/09/1990 |
From: | Bellamy R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
To: | Waterman C ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
Shared Package | |
ML20005G892 | List: |
References | |
NUDOCS 9001230256 | |
Download: ML20005G891 (2) | |
Text
..
- s. x.:
f JAN 0 0.1990 Docket No.. 70-1100 Combustion Engineering, Inc.
ATTN:
C. R. Waterman Acting Vice President - Nuclear Fuel:
Nuclear' Power Systems-1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Gentlemen:
Subject:
October 5, 1989 Management Meeting. Summary This letter transmits a report that summarizes the discussions conducted during a meeting held in the NRC Region I offices on October 5, 1989. The meeting.was attended by Dr. Shelby Brewer, and other members'of his staff and by Mr. William T. Russell and other NRC representatives. JAt that meeting the-results of the recent Mid-SALP. Team Inspection (Team Inspection Report No. 70-1100/89-80) were presented by the NRC.
You.then provided information concerning the updated schedule for completion of the Nuclear Fuel Integrated.
Improvement Program and presented,the information-requested in our letter dated October 2, 1989, that transmitted: Inspection Report 70-1100/89-80, i
We found the meeting useful in understanding your current. corrective action-H completion schedules and in understanding your actions taken to correct'the.
violations identified during the subject inspection ~.
L In addition, this-letter acknowledges the-October 13, 1989, telephone discussions between Mr. Edward Scherer of your staff, on. behalf of Dr. Brewer, and Mr. Russell concerning the commitment made during the October.5, meeting to perform a self assessment of the Windsor fuel fabrication facility. safety-I program. -We understand that the self. assessment will be conducted-during the first quarter of 1990 and that the'results will be made available for NRC.
review about April 1,1990.
Your cooperation with us is appreciated.-
Sincerely,.
& W M TQ: u d 13y:
finie R. Fellamy Ronald R. Bellamy, Chief-Facilities Radiological Safety and Safeguards Branch i
Division of Radiation Safety 1
and Safeguards-j
Enclosure:
NRC Region I Meeting Summary W FFICIAL RECORD COPY CE MMS
.0001.0.0 p
1 aggFe$r 02/o4/90
~
o-,
Combustion Engineering, Inc.
2 JAN 0 91990
-l cc w/ enc 1:
3 A. E. Scherer, Director, Nuclear Licensing C. B. Brinkman, Manager, Washington Nuclear Operations -
Public Document Room (PDR)
Local Public Document Room (LPDR)-
Nuclear Safety _Information Center (NSIC)
State of Connecticut bec w/ encl:
Region _I Docket Room (wice. concurrences)
Management-Assistant, DRMA (w/o er.01)
J. Roth, DRSS M. Austin, DRSS D. McCaughey, NMSS J. Joyner, DRSS I
i i
3
'l
.\\
M:DRSS RI:DRSS RI:DRSS
_DRBS i
Roth/mk Bores Bellamy i)qfa6 oy r
.I o
10//3 /89 10/13/89 b
10/l /89 0FFICIAL RECORD COPY CE MMS - 0002.0.0 10/13/89 l
s,