ML20246C014

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 70-1100/89-03 on 890522-26 & Notice of Violation.Nrc Concerned That Violation May Have Been Caused by Inability of Responsible Individuals to Complete Proper Evaluation of Bioassay Analyses Results
ML20246C014
Person / Time
Site: 07001100
Issue date: 06/30/1989
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgill P
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20246C018 List:
References
NUDOCS 8907100214
Download: ML20246C014 (2)


Text

.

s a z '

t' * ,

r l JUN 3 01989 l Docket No. 70-1100 Combustion Engineering, Inc.

ATTN: Dr. P. L. McGill Vice President - Nuclear Fuel Manufacturing Nuclear Power Systems 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Gentlemen:

Subject:

Inspection Report No. 70-1100/89-03 This refers to.the routine, unannounced inspection conducted by Mr. J. Roth of this office on May 22-26, 1989, of activities authorized by NRC License No.

SNM-1067, including your manufacturing operations, organization, training and emergency planning programs, the review of your actions taken with regard to several identified allegations, and to discussions of our findings held by Mr.

Roth with you, Dr. Brewer and others of your staff at the conclusion of the inspection. The inspection consisted of selected examination of procedures and representative records, interviews with personnel and observations by the inspector.

Within the scope of this inspection, one violation was identified. You are required to reply to this matter in accordance with the enclosed Appendix A.

The response directed by this letter and the accompanying Notice is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511. We are concerned that the violation identified above may have been caused by the inability of responsible individuals within your organization to complete a proper evaluation of the bioassay analyses results. In your response, please indicate the actions you will take to ensure that the responsible individuals have the necessary qualifications and training to perform their designated responsibilities.

Prior to this inspection, a confirmatory survey of the onsite wooded area was ~

conducted by an NRC contractor, Oak Ridge Associated Universities. As a result of that survey, the NRC determined that the wooded area can be released for unrestricted use as described in the encloset; inspection report.

l l

i OFFICIAL RECORD COPY IR CE 89 0001 0.0 8907100214 090630 06/12/89 I(

PDR Ai)DCK 07001100 C FDC

.y ,

l ,. t -

I Combustion Engineering, Inc. 2 JUN 3 01989 Your cooperation with us is appreciated.

Sincerely, Oddnal Signed By:

Runal:) R. Bellam/

Ronald R. Bellamy, Chief Facilities Radiological Safety and Safeguards Branch Division of Radiation Safety and Safeguards

Enclosures:

4

1. Appendix A, Notice of Violation
2. NRC Region I Inspection Report No. 70-1100/89-03 cc w/encls:

A. E. Scherer, Director, Nuclear Licensing C. 8. Brinkman, Manager, Washington Nuclear Operations Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut l bcc w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

Robert J. Bores, DRSS J. Roth, DRSS G. Bidinger, NMSS J. Joyner, DRSS R: ) ,SS RI:DRSS hyDK R iURS5 V l RI:DRSS Rth/ tim /mk/slj Bores J{oyner Bellamy ,

1 06/7h89 06/$/89 06/'1f/89 06/LP/89 i 0FFICIAL RECORD COPY IR CE 89 0002.0.0 06/12/89

_ _ _ . _ _ _ _ i