Forwards LER 78-010/03L-0
ML20147A938
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/15/1978
From: Madgett J
DAIRYLAND POWER COOPERATIVE
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 7809270110
Download: ML20147A938 (3)


Text

~

L /

,3 p h l~ 15 01 ] O y p, I

DAIRYLAND POWER COOPERATIVE Ba Groue, OLonan

$4601 September 15, 1978 In reply, please refer to LAC-5459  ;

DOCKET NO. 50-409 .;

Mr. James G. Keppler Regional Director U. S. Nuclear Regulatory Commission Directorate of Regulatory Operations Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 REPORTABLE OCCURRENCE NO.-78-10

Reference:

(1) LACBWR Technical Specifications, Section 3.9. 2.b. (2) .

(2) LACBWR Technical Specifications, Section 4.2.3.1.1.

Dear Mr. Keppler:

In accordance with Reference 1, this report is notification of a plant condition which lead to operation in a degraded mode permitted by a limiting condition for operation.

The results of an analysis of a lubricating oil sample taken from the sump of emergency diesel generator lA on July 21, 1978 were re-ceived on' August 11, 1978. The analysis, which was performed at the laboratory of the lubrication oil company indicated that dilu-tion with fuel oil amounted to 9.8%. The oil company representative recormended that the engine lubricating oil for this engine be changed.

The emergency diesel generator lA was taken out of service for a temporary period during reactor operation to permit an oil change to be made. The action statement "a" of Reference 2 was fulfilled in compliance with the provisions of Technical Specifications.

Additional details of this event are contained in the Licensee Event Report _ attached to this letter.

S:P 1 a s7s 1-7009.270llD ,

.% l l

Mr. James G. Keppler LAC-5459 Regional Director September 15, 1978 A three-day delay in submitting this report was authorized by Mr. R. Konop to Mr. R. Shimshak on September 14, 1978.

If there are any questions concerning this report, please contact us.

Very truly yours, DAIRYLAND POWER COOPERATIVE w $Mf bl John P. Madgett, General Manager JPM:RES:af bec: Director, Office of Inspection and Enforcement (30)

U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Director, Office of Management Information and (3)