Forwards Decommissioning Plan & Suppl to Environ Rept for Facility post-operating License Stage,For Review.Proposed Tech Specs for Safstor Period Will Be Submitted Separately. Fee Paid
ML20147A803
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/21/1987
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20147A807 List:
References
LAC-12460, NUDOCS 8801150072
Download: ML20147A803 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _

D DA/RYLAND hh[a/[ COOPERATlVE

  • P O BOX 817
  • 2615 EAST AVE SO.
  • LACROSSE, WISCON (608) 788-4006 JAMES W. TAYLOR G0neral Manager December 21, 1987 In reply, please refer to LAC-124G0 DOCKET No. 50-409 Docuaent Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 i

Gentlemen:

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Provisional Operating License DPR-45 Decommissioning Plan, Preliminary DECON Plan, and Supplement to Environmental Report

REFERENCES:

(1) DPC Letter, Taylor to Docket Control Desk, LAC-12234, dated May 22, 1987 (2) NRC Letter, Berkow to Taylor, dated August 4, 1987 (3) 10 CFR 170.12 The La Crosse Boiling Water Reactor (LACBWR) was permanently shut down on April 30, 1987. Reactor defueling was completed June 11, 1987.

Reference 1 contained a request to amend the plant's license to a possession-only license. The NRC issued the possession-only license in Reference 2.

Enclosed for your review are 6 copies each of the La Crosse Boiling Water Reactor Decommissioning Plan, Preliminary DECON Plan, and Supplement to the Environmental Report for the Post-Operating License Stage - SAFSTOR. The Decommissioning Plan and Preliminary DECON Plan are bound together, the Environmental Report Supplement is separate. It is Dairyland Power Cooperative's understanding that the plant officially enters the SAFSTOR condition upon NRC approval of the Decommissioning Plan.

The Decosaissioning Plan, Preliminary DECON Plan and Environmental Report Supplement have been reviewed by the Operations Review Conmiittee and Safety Review Committee.

8801150072 871221 PDR ADOCK 05000409 f P PDR PC4 1

<e ggMd

a Document Control Desk LAC-12460 page 2 December 21, 1987 Proposed Technical Specifications for the SAFSTOR period will be submitted separately.

The application fee required by Reference 3 is enclosed.

If you have any questions regarding these documents, please contact us.

Yours truly, DAIRYLAND POWER COOPERATIVE James W. Taylor, Gene al Manager JWT: LSG: dh Enclosures cc - Mr. A. Bert Davis Regional Administrator

! U. S. Nuclear Regulatory Commission i

Region III I

Mr. Peter B. Erickson, LACBWR Project Manager (9 copies)

Division of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mr. Ken Ridgway, NRC Resident Inspector Mr. L. L. Smith, Director Electric and Water Bureau Wisconsin Public Service Commission Madison, WI 53707 l

D. Sherman (ANI Library) l l

i

! PC4

,