ML20151B213

From kanterella
Jump to navigation Jump to search
Forwards Revised Rev 5 to QA Program Description for possession-only Condition.Revised Pages Reflect Recent Organizational Change
ML20151B213
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/28/1988
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20151B217 List:
References
LAC-12529, NUDOCS 8804080104
Download: ML20151B213 (4)


Text

_ . _ _ _ _ _ _ _ _- _ _______ -_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ .

s. /

e o DA/RYLAND hhh[ COOPERATlVE . e o soxsir . reiseast ave so . tacnosst wiscon (608) 788 4 000 JAMES W. TAYLOR General Manager March 28, 1988 In reply, please refer to LAC-12529 DOCKET NO. 50-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

SUBJECT:

Dairyland Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Provisional License No. DPR-45 Quality Assurance Program Description (QAPD)

REFERENCES:

(1) 10 CFR 50, Section 50.54(a)(3)

(2) 10 CFR 50.71 (3) NRC Letter, Berkow to Taylor, dated August 4, 1987 (LAC-65198)

(4) DPC Letter, Taylor to Document Control Desk, dated December 21, 1987 (LAC-12408)

Reference 4 submitted Revision 5 of the La Crosse Boiling Water Reactor's Quality Assurance Program Description (QAPD) for a possession-only condition.

Based on communications with Mr. Sutphin of Region III, we are resubmitting portions of Revision 5 to incorporate some editorial changes and clarifications.

We are also submitting revised pages which reflect an organizational change which took place on January 1, 1988. This organizational change does not affect the effectiveness of the QA Progtvis it changes the title of QA Supervisor to QA Director and the reporting relationship from Plant Superintendent to Assistant General Manager-Operations. Availability of the General Manager for resolution of safety concerns remains the same. The QA Director will remain responsible for implementing and monitoring quality assurance activit,'. i at LACBWR and the change in reporting will enhance the independence of the Quality Assurance Group.

g4080io4880328 p ADOCK 05ooo4o9 \

QAPD-L

Document Control Deck l LAC-12529

' Page 2 March 28, 1988 ,

2 l

} Attached are the revised pages of our QAPD and a List of Changes which  !

I will describe all editorial changes and list the pages that are affected by j the reorganization.

If there are any questions concerning this submittal, please contact us. f Sincerely, I  !

DAIRYLAND POWER COOPERATIVE

' 1 i

j James W. Taylor, Gen ral Manager 1

JWT:RRWadh Attachments

> cci Mr. A. Bert Davis,-Regional Administrator U. S. Nuclear Regulatory Commission, Region III I _ Glen Ellyn IL 60137 i Mr. Peter Erickson, LACBWR Proiect Manager i

Division of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mr. Ken Ridgway, NRC Resident Inspector ,

3 i h 9

l i

l STATE OF WISCONSIN )

l 4

)

COUNTY OF LA CROSSE )

PersonallycamebeforemethisYodddayof 44<A , 1988, the above named James W. Taylor, to me known to be the person who executed i l  ;

j the foregoing instrument and acknowledged the same.  !

M e W f l

Notary Publid, La Crosse County l

l My Commission expires J'20-M .

l 1

4 QAPD-L

LIST OF CHANGES ,

Page 1 3rd paragraph, first sentence, cubstitute "planned and systematic" -

for "planned or systematic."

Page 2 Incorporate (QA) and (QC), definition of Quality Assurance, substitute "that a structure" for "that structure."

Page 3 A.1., last sentonce, substitute "administration of quality" for i' "administration, and quality." ,

Page 9 C.4., second sentence, substitute "procedure shall provide" for "procedure provide." I Page 12 B.2., substitute "Operations" for "Operating."  !

Page 23 Remove the word "operating" from last sentences of A. and B.1.

Change the word "plant" to "facility" in B.S.

Page 29 C.7., last sentence, substitute "specified for the item" for i "for the specification."  !

Page 34 C.1., first sentence, remove the word "operating" and start ,

sentence with "Conditions."

Page 37 D.I., second sentence, substitute "records shall be established" for "records is established."

All the following pages are affected by the reorganization and have been !

changed accordingly:  ;

. Statement of Quality l Assurance Policy 14 30  ;

1 16 32 l 3 18 34 i 1

4 19 36 6 21 38 8 23 41 Figure 1 3

4 10 26 42. Figure 2 i 12 28 l

a 1 .

4 i  !

4 3

l QAPD-L l

t DAIRYLAND POWER COOPERATIVE f.ACBWR 71R.'T STATEMENT OF QUALITY ASSURANCE POLICY .

j

! The Quality Assurance Program described herein has been duveloped by the Dairyland Power Cooperative to assure safe and reliable operation of LACBWR. .

l This program is designed to meet the requirements of Title 10 of the Code of 3 Federal Regulations, Part 50, Appendix B "Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," as it would apply to a i possession-only condition, t The Quality Assurance Program applies to all activities affecting the functions of the structures, systems, and components that are associated'with a possession-only license. These activities include design, operations, maintenance, repair, fuel handling, testing, and modifications, i

The DPC QA Director is responsible for the establishment of a Quality I Assurance Program which meets the requirements of 10 CFR 50, Appendix B, and .

[

implementing the program.  !

f i I (General Mgsager) f

/ $

' (Date)

, I

l 1

i 1 I i

[

I i l

l l

t

! l i QAPD-L 1 l

.