Ack Receipt of Re Insp Rept 50-409/98-02,in Response to Transmitting Predecisional EC Summary & Exercise of Enforcement Discretion Re Compliance with Maint Rule
ML20155H422
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/03/1998
From: James Gavula
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Berg W
DAIRYLAND POWER COOPERATIVE
References
50-409-98-02, 50-409-98-2, EA-98-329, NUDOCS 9811100122
Download: ML20155H422 (2)


See also: IR 05000409/1998002

Text

November 3, 1998

.

i^

,

EA 98-329

Mr. W. L. Berg

,

General Manager

Daltyland Power Cooperative

3200 East Avenue South

P. O. Box 817

Lacrosse, WI 54602-0817

SUBJECT:

PREDECISIONAL ENFORCEMENT CONFERENCE SUMMARY AND

EXERCISE OF ENFORCEMENT DISCRETION (NRC INSPECTION REPORT

NO. 50-409/98002(DRS))

Dear Mr. Berg:

This will acknowledge receipt of your letter dated October 13,1998, in response to our

i

letter dated September 17,1998, transmitting the Predecisional Enforcement Conference

Summary and Exercise of Enforcement Discretion concerning compliance with the maintenance

rule. We understand your corrective actions have developed a program you believe meets the

maintenance rule and we have no further questions at this time. These corrective actions will be

'

examined during future inspections to ensure the program established meets the requirements

of the maintenance rule.

Sincerely,

Original /s/ J. A. Gavula

James A. Gavula, Chief

Engineering Specialists Branch 1

j

Docket No. 50-409

t i

Enclosure:

Ltr dtd 10/13/98 from W. Berg, Dairyland

Power to USNRC

See Attached Distribution

DOCUMENT NAME: G:DRS\\ LAC 11048.wpd

v. , .~. . ..,y o, ini.

, indie. in in. ben: c . copy winoui sit.cnm.nie.ncio.ur. e copy iin.it.cnm.nie.neio.or. v . no cepy

OFFICE

Rlli

C Rill

,_

U gm @

V

NAME

Dunlop:sd // 6'

Gavula%ffy

Toeq emb

DATE

11/ 7/90

11/J/96

6 /3298 \\

OFFIClhL RECORD COPY

"

9811100122 981103

[

DR

ADOCK 0500

9

95W

.

.-

I

W. Berg

-2-

cc w/o encl:

Roger Christians, Plant Manager

B. D. Burks, P.E., Director, Bureau of Field Operations

cc w/ encl:

J. Mettner, Chairman, Wisconsin Public

Service Commission

Spark Burmaster, Coulee Region Energy Coalition

State Liaison Officer

Chief, Radiation Protection Section

WI Department of Health and

Social Services, Division of Health

Distribution:

J. Goldberg, OGC w/enci

J. Lieberman, OE w/enct

B. Boger, NRR w/ encl

Docket File w/enci

PUBLIC IE-01 w/enci

Rlli PRR w/enci

.S. Weiss, NRR w/enci

M. Masnik, NRR w/enct

S. W. Brown, NMSS w/enci

J. L. Caldwell, Rlll w/ enc!

C. D. Pederson, Rill w/ encl

R. J. Canlano, Rlli w/enci

Rlli Enf. Coordinator w/enci

TSS w/enci

LEO (e-mail)

,

DOCDESK (e-mail)

l

Green w/o encl

m

.,

-

,

.

.. .

.-

. . - .

- - . .

- - . .

_

-..

. _ . -

g,

~

t '; . '

>

D

DAIRYLAND

[8!

[k

COOPERATlVE * 3200 EAST AVE. SO. * P.O. BOX 817 * LA CROSSE, WISCONSIN 54602417 -

OFFICE (808)7871258

. WILLIAM L. BERG

787 M

i

President and CEo

WEB SITE: www.dairynet.com

October 13,1998

PRIORITY ROUTin _

first

Second

7 l

M

RC

/

I

In reply, please

DFM

prf

refer to LAC-13656

,

DRP\\

MA

DOCKET NO. 50-409

E--

b-

oms / No

^

DRMW

N

Regional Administrator

h

U. S. Nuclear Regulatory Commission

FILE

Region III

801 Warrenville Road

i

Lisle, Illinois 60532-4351

' SUBJECT:

Dairyland Power Cooperative

La Crosse Boiling Water Reactor (LACBWR)

,

'

Possession-Only License No. DPR-45

,

REFERENCES: (1) Letter, John Grobe to W, L. Berg, dated 9/17/98

[ Inspection Report No. 50-_409/98002(DRS)]

This letter is in response to Reference 1 and refers to the corrective actions taken to bring

l

LACBWR into compliance with the maintenance rule. ' We have developed a program that we

,

believe meets the NRC interpretation of the maintenance rule. This program contains key aspects

'

!

of the maintenance rule (10 CFR 50.65), including those specifically necessary to adequately

,

identify structures, systems, and components (SSCs) to be monitored under the rule and to

l

adequately . establish goals and implement monitoring for those SSCs.

L

If you have any questions regarding this information, please call Mike Johnsen or Roger

j.

Christians of my staff at (608) 689-2331.

!

Sincerely,

i-

L

DAIRYLAND POWER COOPERATIVE

W%l

'

'

William L. Berg, President & CEO

-

WLB:MNJ:dh

!

!

A Touchstone Energy' Partner

A

'

OCT is an

i

hh10 N

&

-

l

-

.

.

-

-

.-

-- _

.-

. _

..- --

-...

.-. .

..

.

_ . - .

_ . - . -

- - . - . .

..

j

I

'

j-

NRC Regional Administrator

LAC-13656

i

Page 2

October 13,1998

i

!

i

cc:

Document Control Desk

i

U. S. Nuclear Regulatory Commission

Washington, D. C. 20555-0001

cc:

John A. Grobe, Director

)

!

Division ofReactor Safety

NRC Region III

,

cc:

Paul Harris, Project Manager

U. S. Nuclear Regulatory Commission

i

Mail Stop O-11-B20

Washington, DC 20555-0001

I

l

.

,

I

i

4

1

i

'

i

i

.