ML20207A943

From kanterella
Jump to navigation Jump to search
Forwards Revised Pages to LACBWR Decommissioning Plan. Each Page with Change Will Have Bar in right-hand Margin to Designate Location of Change
ML20207A943
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 02/11/1999
From: Berg W
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207A945 List:
References
LAC-13670, NUDOCS 9903050327
Download: ML20207A943 (4)


Text

-- . . _ .

D DAIRYLAND

[8! [k COOPERATIVE

  • 3200 EAST AVE. SO.
  • P.O. BOX 817
  • LA CROSSE. WISCONSIN 54602-0817 OFFICE (606)7871258 ' l FAX (608)787-1469 .

,*)$^jI7 February 11,1999 WEB SITE: www.dairynet.com t n CEO In reply, please ,

refer to LAC-13670 )

DOCKET NO. 50-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 4

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License DPR-45 An.nval_

n Recommissioning Plan Revision

REFERENCES:

(1) DPC Letter, Taylor to Document Control Desk, LAC-12460, i

dated December 21,1987 (original submittal of LACBWR's Decommissioning Plan)

(2) NRC Letter, Erickson to Berg, dated August 7,1991, issuing Order to Authorize Decommissioning ofLACBWR (3) NRC Letter, Brown to Berg, dated September 15,1994, modifying Decommissioning Order The annual update of the LACBWR Decommissioning Plan has been completed, and the pages with changes and their explanations are included with this letter. Each page with a change will have a bar in the right-hand margin to designate the location of the change. None of the changes were determined to require prior NRC approval, and they have been reviewed by both '

onsite and offsite review committees.

The individual pages requiring revision are attached to this letter. Please substitute these revised pages in your copy (ies) of the LACBWR Decommissioning Plan.

' Reasons for the changes are as follows:

\ ,

9903050327 990211

{DR ADOCK 05000409 PDR b\ 6\

A Touchstone Energf Partner A

Document Control Desk LAC-13670 Page 2 '

- February 11,1999 Page 4-2 Containment isolation is no longer required, so the freight door can be

)'

(1) opened at any time. The statement "It willbe openedonly when containment isolation is not required" is deleted from the last paragraph.

l The concrete blocks outside the freight door have been removed; therefore, the reference to them is changed to past tense.

l (2) Page 4-3 As described in section 7.2, a remote manually-operated makeup line was added which supplies water from the storage tank to the fuel element storage ,

]

j well. Reference to this as a makeup source is added to storage tank functions.

(3) Figure 4.5 The reactor feed pumps have been removed. This figure is revised to show their former location as empty.

3 (4) Page 5-14 None of the remaining cooling loads on the Component Cooling Water system require continuous operation. This change was made to provide an accurate description of current' system status.

2 (5) Page 5-16 The tense of the verb is changed so that the description of the Shutdown Condenser System remains unchanged after the relocation of an area radiation monitor.

(6) Page 5-18 This change removes " containment" from the listed wash-down stations i supplied with well water. There is no well water supply to the containment building. This change corrects that misstatement.

! Page 5-19 The reference to the heating boiler is corrected by deleting the misleading use (7) of wording " Turbine Building." It is located in the turbine building, but it also supplies stream to other buildings for heating and is correctly referred to

as "the heating boiler."

(8) Page 5-21 These changes include the description of the new replacement for IB station 4 ' air compressor, and new filtering and drying equipment for control air. This equipment was installed under an approved facility change.

(9)' Page 5-26 The reactor feedwater pumps have been removed, the tense of the verb is changed in the description and the system status is updated to reflect removal.

=(10) Page 5-31 Additional information is supplied regarding other features of the ,

air-conditioning units, including heating capabilities.

. . .. . =. 5- . -,

Document Control Desk LAC-13670 Page 3 February 11,1999 -

(11) Page 5-36 Description of 120-v Non-Interruptible Bus IB is revised to show changes made when Static Irrierter IB was removed from service under an approved facility change. ,

(12) Page 6-1 Titles for senior management personnel have changed, with no change in roles or responsibilities. Assistant GeneralManagerfor Generation has changed to Vice President, Generation.' ,

(13) Page 6-11 An additional paragraph is added to section 6.6, Schedule, to describe the involvement of DPC in Private Fuel Storage and proposed activities associated with LACBWR.
(14) Page 6-12 Section 6.7.2, Dfe9D, has been edited to retain historical content and

& 13 updated with the addition of current funding status.

(15) Figure 6.2 Note at bottom of page is broadened to include the availability ofinterim storage.

Ifyou have any questions concerning any of these changes, please contact Michael' Johnsen of my staff at 608-689-4210.

Sincerely, DAIRYLAND POWER COOPERATIVE

! ML

- William L. Berg, President & CEO WLB:MNJ:dh Enclosures 4

cc: Paul W. Harris, NRC Project Manager t t

)

4 4

"D DAIRYLAND 0 . COOPERATlVE LA CROSSE BoIUNG WATER REACTOR (LAC 8WR)

  • 4601 STATE ROAD 35 GENOA, WISCONSIN 54632- (608) 689-2331 a c. ,es)

TO: AMC Docum,AP Cnwdr<d, CONTROLLED DISTRIBUTION N .g FROM: LACBWR Plant Manager February 23,1999

SUBJECT:

Channes to LACBWR Controllina Documml1 I. The following documents have been revised or issued new.

DECOMMISSIONING PLAN, revised January 1999 Instructions:

Remove Title Page Replace with new Title Page Remove page 4-2 Replace with new page 4-2 Remove page 4-3 Replace with new page 4-3 Remove Figure 4.5/ page 5-1 Replace with new Figure 4.5 and page 5-1 Remove page 5-14 Replace with new page 5-14 Remove page 5-16 Replace with new page 5-16 Remove page 5-18 & 5-19 Replace with new page 5-18 & 5 Remove page 5-21 Replace with new page 5-21 Remove page 5-26 Replace with new page 5-26 i Remove page 5-31 Replace with new page 5-31 Remove page 5-36 Replace with new page 5-36 Remove page 6-1 Replace with new page 6-1 l

2 Remove page 6-11,6-12, & 6-13 Replace with new pages 6-11,6-12, & 6-13 Remove Figure 6.2 Replace with new Figure 6.2 l H.g.tt Pages that were previouslyprinted on both sides are being reissuedseparately.

i i

i

TA, The material listed above is transmitted herewith. Please verify receipt of all listed material, destroy superseded material, and sign below to acknowledge receipt.

O The material listed above has been placed in your binder.

O Please review listed material, notify your personnel of changes, and sign below to acknowledge your review and notification of personnel. [To be checked for supervisors

for depadment specific procedures and LACBWR Technical Specifications.]
O The materiallisted above has been changed. [To be checked for supervisors when materials t applicable to other departments are issued to them.]

/S/ DATE

Please return this notification to the LACBWR Secretary within ten (10) working days.

.