Forwards Rev 18 to LACBWR Emergency Plan.Bar Lines in right- Hand Margins Note Changes.Description of Each Change & Reason for Change Is Included as Cover Pages to Plan Rev
ML20217K712
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 03/27/1998
From: Christians R
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217K715 List:
References
LAC013630, LAC13630, NUDOCS 9804070298
Download: ML20217K712 (6)


Text

1 D DA/RYLAND -

! COOPERATIVE LA CROSSE BotuNG WATER REACTOR (LACBWR)

  • 4601 STATE ROAD 35 GENOA. WISCONSIN 54632-8846 * (608)669-2331 March 27,1998 In reply, please refer to LAC-13630 DOCKET NO. 50-409 s Document Control Desk U. S. Nuclear Regulatory Commission Washington,DC 20555

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45 LACBWR Emergency Plan. Revision 18 Enclosed is the latest revision of the LACBWR Emergency Plan. There were several changes, but none of enough significance to require pner NRC approval. The changes are noted .

by bar lines in the right-hand margins. ' A description of each change and the reason for the change is included as cover pages to the Plan revision.

- The Plan revisions were discussed at a LACBWR Operations Review Committee meeting and reviewed by the Safety Review Conunittee, and it was determined that no unreviewed safety questions existed.

Ifyou have any questions concerning this revision, please call me at (608) 689-2331.

Please return the enclosed receipt when the revised pages have been placed in your books.

Thank you.

1 Sincerely, DAIRYLAND POWER COOPERATIVE l N ,

k Roge E. Christians LACBWR Plant Manager REC:dh .  !

Enclosures : -b# ,, g cc/ enc: Paul W. Harris, NRC Project Manager }

David Nelson, Decommlssioning Branch, NRC Reg. III f

9004070298 900327 PDR ADOCK 05000409 y PDR J

i

}

D DAIRYL,AND

/0 a NRC Docket No. 50-409 COOPERAT/VE LA CROSSE BOLLING WATER REACTOR (LACBWR) + 4601 STAT GENOA. WISCONSIN 54632-8846 * (608) 689-2331 i

[dCepies)

TO: AWMr i A ukidb CONTROLLED DISTRIBUTION NO. 5 A 0

l FROM: LACBWR Plant Manager March 27,1998 i i

SUBJECT:

Channes to LACBWR Controllinn Documents I. The following documents have been revised or issued new. l EMERGENCY PLAN, Revision 18, dated February 1998 INSTRUCTIONS: Remove and replace the following pages.

Title page Pages i, ii, iii, and vi, vii ,

Pages A-4, A-6, A-7, and A-9 thru A-14 Pages C-3, C-4, and C-7 Pages D-1 thru D-3, D-10 and D-13 Page E-6 Appendix 1 Letters: Burns Security, (filed after page Al-2) Genoa Fire Department, Gundersen/ Lutheran Medical Center Vernon County Sheriff Description of Changes included for information only.

R The material listed above is transmitted herewith. Please verify receipt of all listed material, destroy superseded material, and sign below to acknowledge receipt.

. O The material listed above has been placed in your binder.

O Please review listed material, notify your personnel of changes, and sign below to

acknowledge your review and notification of personnel. [To be checked for supervisors for department specific procedures and LACBWR Technical Specifications.]

i ' O The materiallisted above has been changed. [To be checked for supervisors when materials applicable to other departments are issued to them.]

f /S/ DATE l

Please return this notification to the LACBWR Secretary within ten (10) working days.

a j .3 DESCRIPTION OF EMERGENCY PLAN CHANGES IN REVISION 18 Location of Change Description of Change

1) Title page New title page with Revision 18  ;

I

2) Pagei The word " nuclear" is replace with " radiological" as the more appropriate description of the type incidents of I concern and for consistent use of terms.

! The defining language for the ERB has been relocated from Technical Specifications to the ODCM as a result of T.S.

l improvements which were done based on recommendations made by the Commission and approved by the Commission.

3) Pageil Vernon County and the State ofWisconsin no longer maintain plans specific to LACBWR, so reference to them is removed.

l

4) Page iii Replacement page with current Authorization by the Dairyland Power Cooperative General Manager.
5) Page vi Page number correction for Table E-1, Communications Testing Freauency.
6) Page vii Page number correction for Figures A-1, DPC Emergency Response Organization. and A-2, Emergency Planning Zone Boundary.
7) Pages A-4 Table A-1, Emergency Resoonse Capabilities. is revised to remove reference to Technical Specifications. Fire Brigade requirements were moved to the Fire Protection Plan under Technical Specification improvements approved by the Commission.
8) Pages A-6 Third from last and last paragraphs are moved to the next and A-7 page. These are Emergency Response Director responsibilities and belong in the next section 1.2.2, Emergency Resoonse Director.

enCMDI3tKTBAMIPR000CETM-Pt.ANCIANGES SAM

l l DESCRIPTION OF EMERGENCY PLAN CHANGES IN REVISION 18 I

Location of Change Description of Change l 9)- Page A-9 The State of Wisconsin hasjustified and removed all emergency response elements relating to LACBWR from the Wisconsin Radiological Response Plan (WRIRP). The State l of Wisconsin will respond if a radiological incident occurs at l LACBWR. Section 2.1, General Responsibilities, is changed to remove reference to plans specific to LACBWR.

The words " Local and" are added to more adequately describe agencies with whom there are agreements.

Wisconsin Division of Emergency Government has changed to Wisconsin limergency Management.

I

10) Page A-10 Section 2.2.4, State of Wisconsin. names and titles are updated to those in current use.

Section 2.2.5 - The county plan as part of the State plan is no longer maintained current and reference to it is being removed.

1

11) Page A-11 Section 2.2.6c is updated using current names.
12) Page A-12 Section 3.1.2, Warning /Noutication and Cornmunications -

reference to plans is removed.

Section 3.1.5 - The individual responsible to fill the Emergency Response Director function is always on site.

Obsolete sentence referring to arriving on site is removed.

dhC V.07%2TTAMIPROO CNM PLANCHANGE SAM l

i

e.

DESCRIPTION OF EMERGENCY PLAN CHANGES IN REVISION 18 Location of Change Description of Change

, 13) Page A-13 Section 3.2 - Responsibility for initial notification is stated as i

"LACBWR operations staff;" this is incorrect and is replaced with " Emergency Response Director."

l " Incident" replaces " Emergency" to make name of plan ,

current.

l Section 3.3 - Initial declaration of an emergency is stated as a "LACBWR operations staff" responsibility; this is incorrect and is replaced with " Emergency Response Director."

Section 3.4 - Responsibility for initial notification of and coordination with...is stated as " plant staff;" this is incorrect and is replaced with " Emergency Response Director."

14) Page A-14 Reference to the plans is deleted.

l

15) Page C-3 The Area Radiation Monitors will provide adequate indication of radiation levels during a credible postulated ,

accident. The High-Range Containment Building Area Radiation Monitors were removed under an approved facility change. Reference to them is deleted.

16) Page C-4 Types of equipment in use is updated. j i
17) Page C-7 3. State Agensies - names and titles are updated.

l 18) Page D-1 Unusual Event as name of a class of events is corrected with the removal of the unnecessary words which precede it:

" Notification of" in section 1.1.a and section 1.1.1.

Statement referring to review of EAL's with State and local authorities is removed. The State no longer maintains a plan l

specific to LACBWR, and this is no longer done.

l

19) Page D-2 EfIluent limits have been relocated from Technical Specifications to the Off-Site Dose Calculation (ODCM)

Manual. Reference to the ODCM is added.

I dWCMANSU!TE\AMIPROOOCSSM PLAP(CHANGES SAM i

- 1 DESCRIPTION OF EMERGENCY PLAN CHANGES IN REVISION 18 l

Location of Change Description of Change 1

20) Page D-3 . References to Technical Specifications are changed to ODCM. s
21) Page D-10 Section 3.2.1 - term "high-range" is deleted as a description used with effluent monitoring as it is no longer applicable. ,
22) Page D-13 Section 4.2 - State of Wisconsin Plan name is updated to that in current use.
23) Page E-6 Section 3.5, Outside Supponina Emergency Response Plans is deleted. Since the State of Wisconsin and Vernon County no longer maintain plans specific to LACBWR, the section is deleted and the next section renumbered.
24) Appendix 1 These letters are updated on an annual basis and this revision contains the letters of agreement for 1997.