Forwards Safety Evaluation Approving Changes to QAP Description
ML20137R765
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 04/11/1997
From: Fairtile M
NRC (Affiliation Not Assigned)
To: Berg W
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20137R771 List:
References
TAC-M95503, NUDOCS 9704140239
Download: ML20137R765 (3)


Text

0.'

- i r:p L -

r

'{Aprii11/1997 Mr.W.LL... Berg l

' ' General Manager i

y Dairyland Power Coope:ative

'3200 East. Avenue S..

.P.'0L Box 817..

~

Lacrosse, WI 54602-0817:

t y

.LACROSSEBOILINGifhERREACTOR-iQUALITYLASSUdANCEPROGRAMCj

SUBJECT:

(TAC NO. M95503)-

o o

.y,'

T

Dear Mr.' Berg:

7/

w i

-By' separate letters dated April. 10, 1996,. Dairyland Power Cooperative (DPC)'.

requested changes.to the Quality Assurance Program Description (QAPD) and to' the TechnicaliSpectfications (TSs) for the' La Crosse-Boiling Water Reactor.

Additional correspondence from DPC, dated July 30,11996, and November 5,(1996, was submitted to support the requested QAPD changes.3 These changes were needed to reflect the permanently shutdown' and.defueled status of the

' facility. DPC proposed relocating the functional requirements associated with 4

othe review'and audit,' procedures,.and record retention sections'of the TS to the QAPD. Concurrently, DPC requested TS changes to implement the proposed relocations..The staff has approved both the changes to'the QAFD and'The TS..

l Both changes are to be implemented within 30-days of issuance of License-Amendment No. 69.

The License Amendment approved.the TS changes. :This-i letter and enclosed Safety Evaluation serves to' approve the changes to the

-QAPD..

Sincerely, Original' signed by Morton B. Fairtile, Senior Project Manager Non-Power Reactors.and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-409 NRCfBfCENT.E C O. - M-

Enclosure:

Safety Evaluation-f cc w/ enclosure:

.See next page

/

DISTRIBUTION:

9setetJilet5044091 TMartin OGC (015-B-18)

/

.PUBLIC.

SWeiss MFairtile i

PDND r/f.

EHylton Region IV.

h3 PDND:PM 37E b PDND:LA PDND:D EHylton if Evj <

SWeiss

.MFairtile T

DFFICIAfRECORDCOPY. L//{/97 ylT{97 ff 7(

3/f/ 9

/

DOCUMENT:.NAME:

G:\\SECY\\FAIRTILE\\ TAC-QAPD.MBF 9704140239 970411 3

PDR ADOCK 05000409 P

PDR

~

^

1.

i

a" i

1 c neoug4 UNITED STATES '

t p-j j

NUCLEAR REGULATORY COMMISSION

'f WASHINGTON, D.C. 40$65-0001

- o

[

April-11,~ 1997

^

'Mr.. W.- L. Berg i

General Manager-Dairyland Power Cooperative 3200 East Avenue S.

P. O. Box 817-Lacrosse, WI 546/12-0817

SUBJECT:

'LA CROSSE BOILING WATER REACTOR - QUALITY ASSURANCE PROGRAM CHANGE

-(TAC NO. M95503)'

7 ear Mr. Berg:

D

~ By separate letters dated April 10, 1996, Dairyland Power Cooperative (DPC) requested -hanges to the Quality Assurance Prograa Description (QAPD) and to the' Technical Specifications (TSs) for the La Crosse Boiling Water Reactor.

Additional correspondence from DPC, dated July 30, 1996, and November 5, 1996, was_ submitted to support the requested.QAPD changes.

These changes were

' needed to reflect the permanently shutdown and defueled status of the facility.- DPC proposed relocating the functional requirements associated with I

the review and audit, procedures, and record retention sections of the :TS to the QAPD. Concurrently, DPC requested TS changes to implement the proposed i

relocations..The staff has approved both the changes to the QAPD and The TS.

l

.Both changes are to be' implemented within 30-days of issuaice of License

]

Amendment No.

69.

The License Amendment approved the TS changes.

This letter and enclosed Safety Evaluation serves to approve the changes to the QAPD.

Sincerely, p

o IL%MT S-O L k,g.

Morton B. Fairtile, Senior Project Manager Non-Power Reactors ~and Decommissioning Project Directorate Division of Reactor Program Management Office of Nuclear Reactor Regulation Docket No. 50-409 1

1

Enclosure:

Safety Evaluation cc w/ enclosure:

See next page-j

+

j.q 4

4 "Dairyland Power Cooperative

' Docket No. 50-409 La Crosse Boiling Water Reactor i

cc:

Fritz Schubert, Esq.

Dairyland Power Cooperative-2615 East Avenue South La Crosse, Wisconsin 54601 Whieler, Van Sickle and Anderson Suite 801 -

25 W. Main Street Madison ~WI 53703-3398 Mr. Roger Christians, Plant Manager

.La Crosse Boiling Water Reactor

Dairyland Power Cooperative P.:0 Box 275.

Genoa, Wisconsin 54632 lown Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632

)

Chairman Wisconsin Public Service Commission P. O. Box 7854 Madison,_ Wisconsin 53707-7854 ATTN. Mr. Lanning Smith Regional Administrator Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle,-Illinois 60532-4351 i

I a