Forwards Proposed Operator Licensing Exam Schedule Format for FY90 - FY93,in Response to Generic Ltr 89-12
ML20247A193
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 08/22/1989
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-12, LAC-12808, NUDOCS 8909120063
Download: ML20247A193 (4)


Text

__ -

e p

p DAIRYLAND hb[M[COOPERAT/VE 2615 EAST AVE.SO.

PO BOX 817 LACROSSE, WISCONSIN 54602-0817 (608) 788-4000 JAMES W. TAYLOR General Mant.geri -

August 22, 1989 In reply, please refer tc LAC-12808 DOCKET NO. 50-409 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

SUBJECT:

Dairyland Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45 Generic Letter No. 89-12 -Operator Licensing Examinations

REFERENCE:

(1) NRC Letter, James G. Partlow, Associate Director for Projects - NRR, to All Power Reactor Licensees and Applicants for an Operating License (8907060026).

On April 30, 1987, LACBWR was permanently shut down. All spent fuel has been transferred from the reactor to the Spent Fuel Element Storage Well (FESW). On August 4, 1987, License No. DPR-45 was. amended to a possess-but-do-not-operate status and further amended to a full-term possession-only license by Amendment No. 63 dated August 18, 1988.

In response to the request contained in your letter (Reference 1), we wish to advise that since the LACBWR plant is permanently shut down and in the SAFSTOR mode, we do not anticipate any new license applications for fiscal years 1990 through 1993.

In regard to dates for scheduled requalification examinations during fiscal years 1990 through 1993, the situation at the LACBWR facility is somewhat unique. The individual responsible for training is also a Shift Supervisor (SRO) and, as such, works a rotating shift. Therefore, he schedules the requalification examinations for each crew to fit his work schedule during the month of December. Since the crew size is very small, p

l this Training Supervisor determines what day in their shift that he can administer the exam so that it does not interfere with other plant operations i

or requirements. Also, he tries to administer the examination to the l

management SRO's during his day shift in the month of December.

8909120063 890822 PDR ADOCK 05000409 g)$

V PDC N_

r

+

e I..

,; % l:

+

Document Control Desk LAC-12808 Page 2 August 22, 1989

-Enclosures.1'and 2 " Proposed Operator Licensing Examination Schedule Fore.at" of Generic Letter No. 89-12 is being forwarded as an attachment to this letter.

If you have any questions concerning this response, please contact

. Richard J. Cota at LACBWR,-'(608) 689-2331.

Sincerely, l'

-DAIRYLAND POWER COOPERATIVE James W. Taylor General Manager l

JWT:RJC:sks l

Attachments cc:

Mr. Kenneth E. Perkins, Jr.

Chief, Operator Licensing Branch OWFN-10D-18 U. S.' Nuclear R'egulatory Commission Washington, DC 20555 Mr. A. Bert Davis, Regional Administrator U. S. Nuclear Regulatory Commission, Region III Glen Ellyn, IL 60137 Mr. Peter B. Erickson, LACBWR Project Manager

. Division of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555

c.-

i o'

PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE FOPJtAT

.tacility

. IAcawa -

NRC Region III FY 1990 FY 1991

.FY 1992 FY 1993 (10/1/89-9/30/90)-(10/1/90-9/30/91)(10/1/91-9/30/92)'(10/1/92-9/30/93) 1..

Assigned (GL 89 03)--

Nono None None None

  1. RO
  1. SR0 Instant
  1. SRU Upgrade
  1. SRO Limited a

s-s 2.

Assigned.

Date (GL89-03)

  1. R0 fSRO. Instant
  1. SR0 Upgrade FSRO Limited Please indicate initial cold license examinations by placing an asterisk (*) by the date.

Please; indicate examinations intended to extend an operator's license to a second_or subsequent unit with two asterisks (**). -(For example, if Unit 1 is in operation and Unit 2 is approaching fuel load, and three RO candidates with no previous license are to be examined on both Units 1 and 2, and five

~ RO candidates licensed on Unit 1 are'to be examined to extend their licenses toUnit2,thenindicate"R03,5**.")

i

s ? 1,'f i

~

PROPOSED REQUALIFICATION E'XAMINATION SCHEDULE.F0PJ1AT-Facility LACBWR NRC Region III Planned Simulation Facility Certification / Approval Date NA FY 1990 FY 1991 FY 1992 FY 1993 (10/1/89-9/30/90)

(10/1/90-9/30/91)(10/1/91-9/30/92)(10/1/92-9/30/93) 1.

-Date '*

Date Date Date

  • 2.

Date Date Date Date 3.

Date *:

Date Date

  • Date 4

Date Date Date Date 5.

Date

  • Date Date Date
  • Scheduled during the month of December to fit Shift Supervisor responsible for training schedule.