Forwards Rev 12 to QA Program Description. Page Change Locations Indicated by Bold Bar in right-hand Margin
ML20237E263
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 07/15/1998
From: Berg W
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20237E266 List:
References
LAC-13642, NUDOCS 9808310077
Download: ML20237E263 (3)


Text

,_ _ _ - - _ - _ . . . -- _ - - - - _ - - - - - _ - . - - - _ - _ . - _ _ _ _

y DA/RYLAND

/

hh[4[ COOPERATIVE

  • 3200EASTAVE.SO. P.O. BOX 817 LACROSSE.WISCONSINS4602-0817 (608) 788-4000 FAX NO. (608) 7871420 WILLIAM L. BERG canerai uanager July 15,1998
. In reply, please refer to LAC-13642 j DOCKET NO. 50-409 l Document Control Desk

! U. S. Nuclear Regulatory Commission (NRC)

Washington, D.C. 20555

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)

Possession-Only License No. DPR-45 Qpality Assurance Program Description

REFERENCES:

(1) 10 CFR 50, Section 50.54(a)(3) and 50.4 (b)(7)

(2) 10 CFR 50.71 In accordance with References (1) and (2), we are submitting Revision 12 of our Quality Assurance Program Description (QAPD).

Page change locations are indicated by a bold bar in the right-hand margin. The changes in Revision 12 consist of the following:

Section I, " Organization" - Added descriptions to include personnel shown on the Organization chart, Figure 1, that previously were not included in this section.

. Section I, " Organization," section 19.g - Added requirement to ensure no more than a minority of the SRC have line responsibilities at the facility.

- 'Section III, " Design Control and Review," section C - Changed requirements for use of j Facility Change Procedure for all modifications to Structures, Systems, and Components important to safety and systems to be maintained operational during SAFSTOR. It has also been changed to allow for the use of a control procedure to be used to conduct i modifications to systems determined to be no longer necessary for S AFSTOR. l l

,[ i 9909310077 990715 s nd l PDR ADOCK 05000409 POR yU\ i W -

t Document Control D:sk LAC-13642 Page 2 July 15,1998 Section IV, " Procurement Document Control," Section C.7 - Statement changed from "The Plant Manager's approval is required prior to any changes being implemented to previously approved documents which are quality related." to The Plant Manager's approval is required prior to any changes being implemented to previously approved quality control orders. This was done to remove ambiguous terminology.

Section IX, " Control of Special Processes," Section C.2 - Added AWS Structural Welding l Code requirements for welders as appropriate.

Section XII, " Control of Measuring and Test Equipment," Section B.2 - Deleted the word l Craft from the following statement " Craft personnel using Measuring and Test equipment f- are responsible..."

i.

Section XIII, " Handling, Storage and Shipping," Section C. 6 - Storeroom personnel title l changed to Materials Handling personnel.

( -

Section XIV, " Inspection Test, and Operating Status," Section C.3 - Changed terminology to be consistent with rest of QAPD.

L -

Section XV, " Nonconforming Materials, Parts, or Components" - Changed responsibility ofinspecting, accepting, or rejecting corrected items to Quality Assurance Staff from Engineering Staff.

  • Section XVII, " Quality Assurance Records," Section B.1 - Changed responsibility for l

l establishing requirements of this section from the Quality Assurance Director to the p Quality Assurance Department as the Quality Assurance Director is a member of the Quality Assurance Department.

Section XVII, " Quality Assurance Records," Section D, para. 5.b, is being transferred to Section XVIII, " Audits," Section C, para. 9, ,The requirement concerns audit reporting requirements, not records.

Section XVII, " Quality Assurance Records," Section E, para.l.i, adding QA audits as -

requiring a five-year retention.

Section'XVIII, " Audits," Section A, removed ambiguous terminology.

Fire Protection Supervisor and Training Supervisor are being added to the LACBWR organization chart.

Inclusion ofupdated DPC management organization chart.

I

J_

Document Control Desk 1 LAC-13642 Page 3

' July 15,1998 - l The previously mentioned changes have been made to update the program to existing conditions.

l Please contact Bob Wery (608-788-4000 or 787-1208) or Don Egge (608-788-4000 or l 787-1484) of my staff with any questions or comments you may have regarding this submittal.

Sincerely, DAIRYLAND POWER COOPERATIVE l

hW$

William L. Berg, General fanager l WLB:DGE:dh Enclosures cc w/ enc: . Carl J. Paperiello, Regional Administrator U. S. Nuclear Regulatory Commission, Reg. III Paul W. Harris, LACBWR Project Manager Oflice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission STATE OF WISCONSIN )

)

COUNTY OF LA CROSSE )

Personally came before me this 3l# day of Ttla .1998, the above i named William L. Berg, to me known to be the person who' executed the foregoing inurum:mf l and acknowledged the same. 1 Th Uhl ( han '

M Public, La Crossedi 3unty 3*E M. E%EN My commission expires I-DLL td

- - _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _