Forwards Rev 5 to Facility QA Program Description.Analyses Show That No Postulated Accident Would Result in Release Exceeding 10CFR100 Limits,In Present Plant Condition
ML20234C360
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/21/1987
From: Taylor J
DAIRYLAND POWER COOPERATIVE
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20234C363 List:
References
LAC-12408, NUDOCS 8801060200
Download: ML20234C360 (7)


Text

- - _ _. _ _ _ _ _ _ _ _ _ _ .

r1 ,, 1 g DA/RYLAND hM((a/[ COOPERATIVE . e 0 eOx si7 2615 EAST AVE SO . LA CROS (608) 788-40n0 JAMES W. TAYLOR Grneral Manager l

December 21, 1987 In reply, please i refer to LAC-12408 l

DOCKET NO. 50-409 Document Control Desk i U. S. Nuclear Regulatory Commission i' Washington, D. C. 20555 Gentlemen:

SUBJECT:

Dairy?and Power Cooperative (DPC)

La Crosse Boiling Water Reactor (LACBWR)

Provisional Operating License No. DPR-45 Quality Assurance Program Description (QAPD)

REFERENCES:

(1) 10 CFR 50, Section 50.54(a)(3)

(2) 10 CFR 50.71 (3) NRC Letter, Berkow to Taylor, dated August 4, 1987 (LAC-65198)

Enclosed is Revision 5 to the La Crosse Boiling Water Reactor (LACBWR)

Quality Assurance Program Description.

Reference (3) modifies the LACBWR license to disallow operation of the reactor and authorizes DPC to maintain LACBWR in a possession-only condition.

In our present condition, analyses show that no postulated accident considered would result in a release exceeding 10 CFR Part 100 limits. Based on these results, safety-related, as defined, would no longer be applicable to a possession-only mode of operation; and, therefore, 10 CFR 50, Appendix "B," would no longer apply to activities performed by LACBWR.

Because of DPC's desire to maintain control and continuity in activities performed at and for LACBWR, Revision 5 of our QAPD will address all 18 criteria of 10 CFR 50, Appendix "B," at a reduced scope. We will use a PC4-Q 8801060200 871221 fDR ADOCK 05000409 DCD

e s t s

l Document Control Desk LAC-12408 Page 2 December 21, 1987 graded approach to implement this program by establishing managerial and administrative controls commensurate with the complexity and/or seriousness of the activity to be undertaken.

If there are any questions concerning this submittal, please contact us.

Sincerely, DAIRYLAND POWE PERATIVE h W. Taylor, General Manager JWT:RRW:dh cc: Mr. A. Bert Davis, Regional Administrator U. S. Nuclear Regulatory Commission, Region III Glen Ellyn, IL 60137 Mr. Peter Erickson, LACBWR Project Manager Division of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mr. Een Ridgway, NRC Resident Inspector STATE OF WISCONSIN )

)

COUNTY OF LA CROSSE )

Personallycaxfogf .tiso72 day of , 1987, the above named Jjupeu.gr .

~/. r, to me known to be the person who executed the foregoing ins'ttument and acknowledged the same.

W -

Notary Pub Gh, La Crosse County My Commission expires NU/ f_

PC4-Q

r 4t LIST OF CHANGES

  • Page l Change  ! Reason l l 1 l . Remove " operating reactors" and l License changed to l add " possession-only condition." l possession-only.

l . Remove term " safety-related." l l . Remove reference to operations. l l l 2 l . Remove word " plant" and insert l License changed to j " facility." l possession-only.

l . Remove unnecessary definitions l l (i.e., current, preliminary and l l safety-related). l l l 3 l . Remove " plant" and insert l License changed to l " facility." l possession-only, and j . Designate QA administration to QA l to maintain continuity l Supervisor. l in authority and l . Insert " possession-only condition" l responsibilities.  ;

l and remove " safe operation." l l l 4 l . Remove references to operational,  ! License changed to availability, shutdown, and l possession-only.

l safety-related. l l l 5 l . Change responsibility of Safety l License changed to

, j Review Committee. l possession-only.

~'

l . Add onsite and offsite engineers. l-l . Remove reference to NRC required l l license. l l l 6 l . Add all necessary components. l License changed to l . Remove statement with respect to l possession-only. l l use of nuclear fuel. l l . Remove " generated during l l operation." l l . Change " plant" to " facility." l l l 7 l . Input " applicable requirements." l License changed to l . Remove statements on l possession-only.

l " safety-related." l l l 8 l . Remove statement of safety related. l License changed to l . Change " plant" to " facility." l possession-only.

l l 9 l . Change plant department to l License changed to l knowledgeable. l possession-only and l l . Change " supervisor" to l reduction in staff.

l " department." l l . Remove inservice inspection. l

  • Bar lines in right margin of pages indicate the location of change.

PC4-Q

( ,1

, LIST OF CHANGES page 2 Page ' Change  ! Reason l l 10 . Remove " operation." l License changed to l

j . Remove " plant" and insert l possession-only.

l " facility." l l l 11 l . Change " designated plant department ! License changed to j personnel" to "any department l possession-only.

j personnel." l l

. Add "as deemed necessary." l l l 12 . Change " safety" to " possession- l License changed to l

l only." l possession-only.

l . Remove " operation." l l

. Remove "affecting nuclear safety." l l  !

13 l . Change " operation" to l License changed to l " possession-only." l possession-only.

l . Remove operation & startup and l l

shutdown of safety-related. l l

. Remove valid senior operator's l l license requirement for temporary l l changes. l l

14 l . Change " plant" to " facility." l License changed to l . Remove refueling. l possession-only.

l l

16 . Remove supplier programs to require l License changed to l

l 10 CFR 50, App. "B". j possession-only.

17 l . Remove safety-related. l License changed to l l possession-only.

l l 19 l . Replace " plant" with " facility." l License changed to l . Remove " safety-related." l possession-only.

l l

21 l . Change " safety-related" to l License changed to j " possession-only." j possession-only.

l

. Remove safety-related and conduct l l of inservice inspection. l l

l 23 . Remove " safety-related." l License changed to l

j . Remove " physics testing." l possession-only.

l . Change " plant" to " facility." l I

l 24 l . Remove " shutdown." l License changed to j . Remove designation of coordinator. l possession-only, and j . Remove " plant status" and insert i the Shift Supervisor j " system status." l will control testing.

l l

PC4-Q l

.f 4 (.

- LIST OF CHANGES - page 3 Page- l Change .

'l Reason l l 26 j . Remove " plant operational and l License changed to l maintenance" and replace with l possession-only.

'l " facility." l l . Remove " developing and implement- l

.l ing" and replace with " approving." l l l 29 l . Remove safety-related. l Same as above.

l l 30- l- . Change " plant" to " facility." l Same as'above.

31 l . Change " plant" to " facility." l Same as above.

l l 32 l_ . Remove " plant." l Same as above.

l l 33 l- . Remove " plant." l Same as above.

l l 34 . Remove " plant." l Same as above.

l j' . Remove redundant' statement of l l' what is adverse to quality. I l

36 l . Remove " refueling." l 'Same as above.

l .; Remove sentence regarding plant l l operating modes.

l l l

.a l

PCs-Q

f ,a 4

DAIRYLAND POWER COOPERATIVE LACBWR PLANT STATEMENT OF QUALITY ASSURANCE POLICY The Quality Assurance Program described herein has been developed by the Dairyland Power Cooperative to assure safe and reliable operation of LACBWR.

This program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, " Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," as it would apply to a possession-only condition.

The Quality Assurance Program applies to all activities af fecting the functions of the structures, systems, and components that are associated with a possession-only license. These activities include design, operations, maintenance, repair, fuel handling, testing, and modifications.

The DPC QA Supervisor is responsible for the establishment of a Quality Assurance Program which meets the requirements of 10CFR50, Appendix B, and implementing the program.

V" (General Man 4ger)

N 2.9 8/'7 (Date)

WP63

f , e 4

TABLE OF CONTENTS SECTION PAGE STATEMENT OF POLICY TABLE OF CONTENTS-- --- --------- i

0.0 INTRODUCTION

- - - - - - - - - ------ 1 I ORGANIZATION - - ---- ------ 3 II QUALITY ASSURANCE PROGRAM--------- ----- -- -- 6 III DESIGN CONTROL AND REVIEW - - - - - - - - - - - -

8 IV PROCUREMENT DOCUMENT CONTROL ----- -------

10 V INSTRUCTIONS, PROCEDURES AND DRAWINGS--- - ------- 12 VI DOCUMENT CONTROL---------------------------

14 VII CONTROL OF PURCHASED MATERIAL, EQUIPMENT, AND SERVICES ----

16 VIII IDENTIFICATION AND CONTROL OF MATERIAL, PARTS, AND COMPONENTS- 18 IX CONTROL OF SPECIAL PROCESSES------------------- ----- 19 f-X I N S PE CTION----------- - ------- -

21 XI TEST CONTROL --- - - - - - - - - - - - - - - - - - 23 XII CONTROL OF MEASURING AND TEST EQUIPMENT---------------------- 26 XIII HANDLING, STORAGE, AND SHIPPING---- - - - - - - - - - - - - - - - - 28 XIV INSPECTION, TEST, AND OPERATING STATUS---------------------- 30 I

XV NONCONFORMING MATERIALS, PARTS, OR COMPONENTS -- --- 32 J I

XVI CORRECTIVE ACTION-- ----- -- ---------- -- 34 l XVII QUALITY ASSURANCE RECORDS 36 XVIII AUDITS - ---- - -- - ---- -- 38 TABLE I - ---- ------- --

40 FIGURE 1 - FACILITY ORGANIZATION- 41 FIGURE 2 - 0FFSITE ORGANIZATION - --------------- 42 {

l l

1 WP63