Forwards Changes to Physical Security Plan,Contingency Plan & Guard Force Training & Qualification Plan.Encl Withheld
ML20198R972
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 10/24/1997
From: Berg W
DAIRYLAND POWER COOPERATIVE
To:
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LAC-13612, NUDOCS 9711130410
Download: ML20198R972 (2)


Text

_ -.__ __ _ . _ _ . _ . . - . . . _ _ _. -._._ - ._ _ ___ _._ _

I*

i

. 1 0 /DA/RWAND ]

~/#

  • COOPERATIVE. m0cAsrave.so. . po soxm . taenossclwiscossa.02 air  !

. (60s) 7ss4000 FAX NO, (60s) 7s71420  :

WILLIAM L. BERG  !

opretal Manager  ;

October 24,1997 '

In reply. P lease f refer to LAC-13612 l DOCKET NO. 50-409 I

Director, Office of Nuclear Reactor Regulations -!

. Document Control Desk l

, U. S. Nuclear Regulatory Commission Washington, DC 20555-

Dear Sir or Madam:

SUBJECT:

Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR) - .

Possession-Only Licence No. DPR-45  :

Changes to Physical Security Plan, Contiagency Plan and Guard Force Training & Oualification Plan .

A complete review of the LACBWR Physical Security Plan has been performed, and a

. number of changes were found necessary to keep the Plan current. These changes are being

! submitted in accordance with 10 CFR 50.54(P). This revision has been approved by the LACBWR Operations Review Committee and the Safety Review Committee.  ;

Due to page renumbering and realignment, the LACBWR Physical Security Plan is being reissued in its entirety. Included are the Security Force Training & Qualification Plan as Addendum I and the Safeguards Contingency Plan as Addendum II. Locations of the changes are L

indicated by a bold bar in the right hand margin of each affected page. -

We are enclosing, as a separate item, an explanation of the changes to our subject plans.

g We have reviewed these changes and have determined they de not result in a decreue in the

safeguards effectiveness of the plans.

It b requested that all enclosures be withheld from public disclosure pursuant to ,

10 CFR 2.790(d).

r. l r

- rn, - , . , , .,g.,-, ,,-,-,.n.,. ,. , ,., -

n ,,,,,,-. - , . -.w-+, ,,a,,,,, ,,,,--,,.-y ww,,,..,,-,.,,. , , . . , - , , , , , , , , , _ , , . . . . . - - _ . . _ - - _ . .

L* Dirxtor, Of5ce ofNuclear Reactor Regulations l- LAC-13612 i g Page 2 October 24,1997  ;

Please replace your old copy of the LACBWR Security Plan with the enclosed revised l Plan and acknowledge these actions by signing and retuming the enclosed receipt.  !

Please contact either Roger Christians or Richard Cota of my staff, at 608-689-2331, if ynu have any questions or comments.

Sincerely, DAIRYLAND POWER COOPERATIVE htW $

William L. Berg, General er WLB:RJC:dh i Enclosures cc: Paul Hanis, Project Manager Division of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission l Washington, DC 20555 t

M s

,- - ~ , < , , - - . . - -

r.

!\

i.p, -,

.\ \-- D - - - - - - -

AND yacpod,t No.30-409 f*f COOPERATIVE u enosas souNo wmn naAcron o.Acawn) . nours i. sox 37s oENoA,WlaCONalN H832-973s * (90s)es9-2331

{

TO: AMC dicliruho V CONTROIJrn DISTRIBUTION NO.M

^

FROM: LACBWR Plant Manager November 5,1997 I i

SUBJECT. Chan=== to L_ACBWR Controlling Documents I. The following documents have been revised as of October 1997 and are hereby reissued in their entirety:

' LACBWR PHYSICAL SECURITY PLAN SECURITY FORCE TRAINING & QUAI.IFICATION PLAN [Addenduin I) t SAFEGUARDS CONTINGENCY PLAN [ Addendum II) la=*me_ tons:

Remove entire contents ofyour Security Plan binder and replace with attached pages.

R The material listed above is transmitted herewith. Please verify receipt of all listed material, destroy superseded material, and sign below to acknowledge receipt.

O The material listed above has been placed in your binder.

4

- O Please review listed material, notify your personnel of change?, and eign below to acknowieoge your review and notification ofpersonnel. [To be checked for supervisors for department specific procedures and LACBWR Technical Sp4=t ons.) i O The material listed above has been changed. [To be checked for supervisors when materials applicable to other departments are issued to them.)

D Update Index with pen and ink change, as appropriate.

./S/ . DATE Please return this notification to the LACBWR Secretary within ten (10) working days.